createdTs1727266191190
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd42000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose03-10-2024 16:00:00
tenderQueryClose30-09-2024 12:00:00
technicalBidOpenNone
publishedDate26-09-2024 13:41:50
publishedByPostPWD_EE_DIV_BLR
publishedByUserKPE10627 - HEMARAJA
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonExecutive Engineer
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08392266123
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1727266191228
version7
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/BD/WORK_INDENT15096
titleConstruction of Anganawadi Building at 10, 11th ward, Kuduthini, Town Panchayath Kuduthini-09, in Ballari Rural, Ballari Dist. Under 8443-Deposite Grants for the year 2023-24 (PWD/2024-25/BD/WORK INDENT15096) (Reserved for General Category)
descriptionConstruction of Anganawadi Building at 10, 11th ward, Kuduthini, Town Panchayath Kuduthini-09, in Ballari Rural, Ballari Dist. Under 8443-Deposite Grants for the year 2023-24 (PWD/2024-25/BD/WORK INDENT15096) (Reserved for General Category)
categoryWORKS
categoryTextWorks
ecv1670908.78
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1693
locationNamePWD Division Office Ballari
provisionalAmount2000000.0
groupOverheadTotal0.0
fileNumberKPWD/AEE/PWD/SDN/BAL/8443/ANG/KUDUTHINI-09/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17272661910000NoneNoneBuildingsGROUND FLOOR998798.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4075711158598NoneI.No. 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the wor. In all kinds of soils upto 3 m depth (PWD CSR For 2023-24 Vol 1 Pag No:8 Item No. 1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.147.89FalseNoneNoneFalseNoneFalse5129.0190
4075712158598NoneI.No. 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Bed concrete of mix 1:4:8 (PWD SR 2023-24 Volume-1 Page No. 15 I.No.2.1.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.456.4FalseNoneNoneFalseNoneFalse40246.080
4075713158598NoneI.No. 2.2.1Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all aterials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- ( For footing) (PWD SR 2023-24 Volume-1 Page No. 15 I.No.2.2.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6601.356601.355.18FalseNoneNoneFalseNoneFalse34194.9930
4075714158598NoneI.No. 2.2.1Formwork 8% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum528.11528.115.18FalseNoneNoneFalseNoneFalse2735.60980
4075715158598NoneI.No. 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications (For coloumn) .(PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.4.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6639.156639.150.95FalseNoneNoneFalseNoneFalse6307.19250
4075716158598NoneI.No. 2.4.2Form work 8% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3319.583319.580.95FalseNoneNoneFalseNoneFalse3153.6010
4075717158598NoneI.No. 2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For plinth Beam) (Common 2023-2024 PWD SR (Vol-1) Sl No. 2.5.1 P.No-16) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6639.156639.157.63FalseNoneNoneFalseNoneFalse50656.71450
4075718158598NoneI.No. 2.5.1Formwork 50% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3319.583319.587.63FalseNoneNoneFalseNoneFalse25328.39540
4075719158598NoneI.No. 1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m (PWD SR 2023-24 Volume-1 Page No. 7 I.No.1.9) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum279.3279.330.28FalseNoneNoneFalseNoneFalse8457.2040
4075720158598NoneI.No. 2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For coloumns above plinth Beam ) (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6961.56961.51.37FalseNoneNoneFalseNoneFalse9537.2550
4075721158598NoneI.No. 2.5.1Form work 70% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum4873.054873.051.37FalseNoneNoneFalseNoneFalse6676.07850
4075722158598NoneI.No. 1.11Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m (PWD CSR For 2023-24 Vol-1/Page No. 7, Item No. 1.11) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum454.65454.6523.46FalseNoneNoneFalseNoneFalse10666.0890
4075723158598NoneI.No. 2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For Beams and lintle of Buildings) (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6961.56961.52.51FalseNoneNoneFalseNoneFalse17473.3650
4075724158598NoneI.No. 2.5.1Form work 60% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum4176.94176.92.51FalseNoneNoneFalseNoneFalse10484.0190
4075725158598NoneI.No. 2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For chejja, staricase of Buildings) (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6961.56961.50.17FalseNoneNoneFalseNoneFalse1183.4550
4075726158598NoneI.No. 2.5.1Form work 45% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3132.683132.680.17FalseNoneNoneFalseNoneFalse532.55560
4075727158598NoneI.No. 2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For Roof Slab) (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6961.56961.54.96FalseNoneNoneFalseNoneFalse34529.040
4075728158598NoneI.No. 2.5.1Form work 50% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3480.753480.754.96FalseNoneNoneFalseNoneFalse17264.520
4075729158598NoneI.No. 2.11(a)Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification for buildings (PWD CSR For 2023-24 Vol 1 Pag No:18 Item No. 2.11(a)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne93929.8593929.852.14FalseNoneNoneFalseNoneFalse201009.8790
4075730158598NoneI.No. 6.24Providing Brick work with Non Modular fly ash bricks conforming to IS:12894, class designation 5.0 average compressive strength in super structure above plinth level up to floor I level in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffoldingand usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (PWD CSR For 2023-24 Vol 2 Pag No:17 Item No. 6.24) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm8232.08232.019.35FalseNoneNoneFalseNoneFalse159289.20
4075731158598NoneI.No. 8.4.2Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD CSR For 2023-24 Vol 2 Pag No:41 Item No. 8.4.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm327.6327.683.82FalseNoneNoneFalseNoneFalse27459.4320
4075732158598NoneI.No. 8.5.2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD CSR For 2023-24 Vol 2 Pag No:42 Item No. 8.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm366.45366.4571.1FalseNoneNoneFalseNoneFalse26054.5950
4075733158598NoneI.No. 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge (PWD CSR For 2023-24 Vol 2 Pag No:50 Item No.8.51) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm105.0105.089.35FalseNoneNoneFalseNoneFalse9381.750
4075734158598NoneI.No. 14.1.1Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations andjointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make hisown arrangements for procuring water for testing).RCC NP3 Class pipe of 1000 mm dia. (PWD CSR For 2023-24 Vol 2 Pag No131 Item No.14.1.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr5746.655746.652.5FalseNoneNoneFalseNoneFalse14366.6250
4075735158598NoneI.No. 8.27Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (PWD CSR For 2023-24 Vol 2 Pag No:45 Item No. 8.27) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm55.6555.65154.92FalseNoneNoneFalseNoneFalse8621.2980
4075736158598NoneI.No. 8.39Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (PWD CSR For 2023-24 Vol 2 Pag No:48 Item No. 8.39) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm133.35133.3583.82FalseNoneNoneFalseNoneFalse11177.3970
4075737158598NoneI.No. 8.31Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer (PWD CSR For 2023-24 Vol 2 Pag No:46 Item No. 8.31) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm186.9186.971.1FalseNoneNoneFalseNoneFalse13288.590
4075738158598NoneI.No. 11.34.BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. (PWD CSR For 2023-24 Vol 2 Pag No:86 Item No. 11.34.B) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm192.15192.1547.25FalseNoneNoneFalseNoneFalse9079.08750
4075739158598NoneI.No. 8.41Painting with synthetic enamel paint of approved brand and manufacture of equired colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of pproved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.. (PWD CSR For 2023-24 Vol 2 Pag No:48 Item No. 8.41) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm175.35175.3583.25FalseNoneNoneFalseNoneFalse14597.88750
4075740158598NoneI.No. 12.90Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer framehaving an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size - 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (PWD CSR For 2023-24 Vol 2 Pag No:110 Item No.12.90) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm7070.77070.72.16FalseNoneNoneFalseNoneFalse15272.7120
4075741158598NoneI.No. 9.36Providing flooring with 25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications (PWD CSR For 2023-24 Vol 2 Pag No:64 Item No.9.36) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1732.51732.522.24FalseNoneNoneFalseNoneFalse38530.80
4075742158598NoneI.No. 9.9Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/m2 including pointing the joints with white cement and matching pigment etc., complete. (PWD CSR For 2023-24 Vol 2 Pag No:60 Item No.9.9) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1129.81129.82.25FalseNoneNoneFalseNoneFalse2542.050
4075743158598NoneI.No. 10.14Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. (PWD CSR For 2023-24 Vol 2 Pag No:71 Item No.10.14) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1161.31161.324.77FalseNoneNoneFalseNoneFalse28765.4010
4075744158598NoneI.No. 11.26.2Providing and fixing hand rail of approved size by welding etc. to steelladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. E.R.W. tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (PWD CSR For 2023-24 Vol 2 Pag No:84 Item No.11.26.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kg136.5136.5160.0FalseNoneNoneFalseNoneFalse21840.00
4075745158598NoneI.No. 14.1.1Providing and fixing water closet squatting pan (Indian type W.C. pan )with 100 mm sand cast Iron P or S trap, 10 litre low level whiteP.V.C. flushing cistern, including flush pipe, with manually controlleddevice (handle lever) conforming to IS : 7231, with all fittings and fixturescomplete, including cutting and making good the walls and floorswhereverrequired: (PWD CSR For 2023-24 Vol 2 Pag No131 Item No.14.1.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each5128.25128.21.0FalseNoneNoneFalseNoneFalse5128.20
4075746158598NoneI.No. 13.56Making soak pit 2.5 m diameter 3.0 m deep with 45 x 45 cm dry brickhoney comb shaft with bricks and PVC S.W.R drain pipe 100 mmdiameter, 1.8 m long complete as per standard design.With commonburnt clay (non modular) bricks of class designation 3.5 (PWD CSR For 2023-24 Vol 2 Pag No127 Item No.13.56) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each24175.224175.21.0FalseNoneNoneFalseNoneFalse24175.20
4075747158598NoneI.No. 13.40.1Supply and delivery of Centrifugal pumpset at site brand new bestmake and with discharge duty confirming to ISI standards and its latest amendments.2 HP, Size 65x50 Head 13M, Discharge 462 LPM (PWD CSR For 2023-24 Vol 5 Pag No57 Item No.13.40.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each16390.516390.51.0FalseNoneNoneFalseNoneFalse16390.50
4075748158598NoneI.No. 13.40.1Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineerin- charge. (PWD CSR For 2023-24 Vol 5 Pag No57 Item No.13.40.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1768.21768.29.99FalseNoneNoneFalseNoneFalse17664.3180
4075749158598NoneI.No. 2.8(ii)aDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead. By Mechanical Means. Cement Concrete Grade M-15 & M-20 (PWD CSR For 2023-24 Vol 3 Pag No 11 Item No. 2.8(ii)a) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum754.95754.955.51FalseNoneNoneFalseNoneFalse4159.77450
4075750158598NoneI.No. 12.85Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size - 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made (PWD CSR For 2023-24 Vol 2 Pag No:109 Item No. 12.85) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6004.956004.950.18FalseNoneNoneFalseNoneFalse1080.8910
4075751158598NoneI.No. 12.12Providing Mathi/Nandi wood frames of doors, windows, clerestorywindows, ventilators and other frames, wrought, framed or assembledincluding making plaster groves (excluding cost of cement concrete and sideclamps ), but including cost of materials, labour, usage charges complete as per specifications.) (PWD CSR For 2023-24 Vol 2 Pag No:99 Item No.12.12) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum130517.1130517.10.13FalseNoneNoneFalseNoneFalse16967.2230
4075752158598NoneGeMNon Magnetic Green Dry Erase Writing board of dimensions (in mm) 1200 x 1800 (GeM Item) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each8500.08500.01.0FalseNoneNoneFalseNoneFalse8500.00
4075753158598NoneI.No. 13.40.1Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD CSR For 2023-24 Vol 5 Pag No57 Item No.13.40.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.cm4.24.24500.0FalseNoneNoneFalseNoneFalse18900.00
17272661910000NoneNoneBuildingsFIRST FLOOR630461.96
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4075754158599NoneI.No. 2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For coloumns above plinth Beam ) (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7031.127031.121.37FalseNoneNoneFalseNoneFalse9632.63440
4075755158599NoneI.No. 2.5.1Form work 70% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum4921.784921.781.37FalseNoneNoneFalseNoneFalse6742.83860
4075756158599NoneI.No. 2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For Beams and lintle of Buildings) (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7031.127031.123.52FalseNoneNoneFalseNoneFalse24749.54240
4075757158599NoneI.No. 2.5.1Form work 60% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum4218.674218.673.52FalseNoneNoneFalseNoneFalse14849.71840
4075758158599NoneI.No. 2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For chejja, staricase of Buildings) (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7031.127031.120.45FalseNoneNoneFalseNoneFalse3164.0040
4075759158599NoneI.No. 2.5.1Form work 45% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3164.03164.00.45FalseNoneNoneFalseNoneFalse1423.80
4075760158599NoneI.No. 2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For Roof Slab) (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7031.127031.124.39FalseNoneNoneFalseNoneFalse30866.61680
4075761158599NoneI.No. 2.5.1Form work 50% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3515.563515.564.39FalseNoneNoneFalseNoneFalse15433.30840
4075762158599NoneI.No. 2.11(a)Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification for buildings (PWD CSR For 2023-24 Vol 1 Pag No:18 Item No. 2.11(a)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne94869.1594869.150.88FalseNoneNoneFalseNoneFalse83484.8520
4075763158599NoneI.No. 6.32Providing Brick work with Non Modular fly ash bricks conforming to IS:12894, class designation 5.0 average compressive strength in super structure above plinth level up to floor I level in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffoldingand usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (PWD CSR For 2023-24 Vol 2 Pag No:17 Item No. 6.32) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum8314.328314.3217.11FalseNoneNoneFalseNoneFalse142258.01520
4075764158599NoneI.No. 8.4.2Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD CSR For 2023-24 Vol 2 Pag No:41 Item No. 8.4.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm330.88330.88116.08FalseNoneNoneFalseNoneFalse38408.55040
4075765158599NoneI.No. 8.5.2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD CSR For 2023-24 Vol 2 Pag No:42 Item No. 8.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm370.11370.1163.04FalseNoneNoneFalseNoneFalse23331.73440
4075766158599NoneI.No. 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge (PWD CSR For 2023-24 Vol 2 Pag No:50 Item No.8.51) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm106.05106.05116.08FalseNoneNoneFalseNoneFalse12310.2840
4075767158599NoneI.No. 8.27Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (PWD CSR For 2023-24 Vol 2 Pag No:45 Item No. 8.27) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm56.2156.21179.12FalseNoneNoneFalseNoneFalse10068.33520
4075768158599NoneI.No. 8.39Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (PWD CSR For 2023-24 Vol 2 Pag No:48 Item No. 8.39) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm134.68134.68116.08FalseNoneNoneFalseNoneFalse15633.65440
4075769158599NoneI.No. 8.31Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer (PWD CSR For 2023-24 Vol 2 Pag No:46 Item No. 8.31) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm188.77188.7763.04FalseNoneNoneFalseNoneFalse11900.06080
4075770158599NoneI.No. 11.34.BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. (PWD CSR For 2023-24 Vol 2 Pag No:86 Item No. 11.34.B) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm194.07194.0745.36FalseNoneNoneFalseNoneFalse8803.01520
4075771158599NoneI.No. 8.41Painting with synthetic enamel paint of approved brand and manufacture of equired colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of pproved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.. (PWD CSR For 2023-24 Vol 2 Pag No:48 Item No. 8.41) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm177.1177.14.68FalseNoneNoneFalseNoneFalse828.8280
4075772158599NoneI.No. 11.5.1Providing and fixing in position fully panelled Mathi/Nandi wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures (PWD CSR For 2023-24 Vol 2 Pag No:77 Item No.11.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm4748.924748.922.52FalseNoneNoneFalseNoneFalse11967.27840
4075773158599NoneI.No. 9.36Providing flooring with 25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications (PWD CSR For 2023-24 Vol 2 Pag No:64 Item No.9.36) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1749.831749.8311.25FalseNoneNoneFalseNoneFalse19685.58750
4075774158599NoneI.No. 9.9Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/m2 including pointing the joints with white cement and matching pigment etc., complete. (PWD CSR For 2023-24 Vol 2 Pag No:60 Item No.9.9) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1141.11141.111.42FalseNoneNoneFalseNoneFalse13031.3620
4075775158599NoneI.No. 10.14Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. (PWD CSR For 2023-24 Vol 2 Pag No:71 Item No.10.14) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1172.911172.912.65FalseNoneNoneFalseNoneFalse3108.21150
4075776158599NoneI.No. 11.5.1Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm4748.924748.927.56FalseNoneNoneFalseNoneFalse35901.83520
4075777158599NoneI.No. 13.34Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. (PWD CSR For 2023-24 Vol 2 Pag No123 Item No.13.34) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Ltr61.5161.511000.0FalseNoneNoneFalseNoneFalse61510.00
4075778158599NoneI.No. 11.5.1Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.Internal work - Exposed on wall 20 mm nominal dia Pipes (PWD CSR For 2023-24 Vol 2 Pag No:77 Item No.11.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr254.1254.1100.0FalseNoneNoneFalseNoneFalse25410.00
4075779158599NoneI.No. 14.10.1.1Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS:13983 with C.I. brackets and stainless steel plug 40 mm, including painting of fittings and brackets, cutting and making good the walls wherever required :510x1040 mm bowl depth 250 mm (PWD CSR For 2023-24 Vol 2 Pag No:77 Item No.14.10.1.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each5957.895957.891.0FalseNoneNoneFalseNoneFalse5957.890
17272661910000NoneNoneBuildingsELECTRIFICATION41648.82
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4075780158600NoneI.No. 1.2.1Concealed Conduit SystemSupplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 19/20 mm dia 2 mm thick. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr69.369.323.0FalseNoneNoneFalseNoneFalse1593.90
4075781158600NoneI.No. 1.3.2Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.Common Sr 2023-24 vol-6,pg no-2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr82.9582.9513.0FalseNoneNoneFalseNoneFalse1078.350
4075782158600NoneI.No. 1.3.2Supplying and wiring adopting loop system in existing PVC Conduit/casing capping casing capping using 2x1.5Sqmm (Phase & Neutral)& 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulatedcopper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box,the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outl.Short point upto 3Mtr from tapping point to out let via switch box . Common Sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr282.45282.452.0FalseNoneNoneFalseNoneFalse564.90
4075783158600NoneI.No. 2.2.1Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch. Common Sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Point397.95397.952.0FalseNoneNoneFalseNoneFalse795.90
4075784158600NoneI.No. 2.2.2Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box.Common Sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Point582.75582.759.0FalseNoneNoneFalseNoneFalse5244.750
4075785158600NoneI.No. 2.2.3Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS 694:2010.1.5 mm2 Common SR 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Point27.327.320.0FalseNoneNoneFalseNoneFalse546.00
4075786158600NoneI.No. 2.3.2Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS 694:2010.2.5 mm2 Common SR 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr44.144.170.0FalseNoneNoneFalseNoneFalse3087.00
4075787158600NoneI.No. 2.3.3Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete.10-12 Way.Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr274.05274.051.0FalseNoneNoneFalseNoneFalse274.050
4075788158600NoneI.No. 3.3.6Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete.16 Way.Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each308.7308.71.0FalseNoneNoneFalseNoneFalse308.70
4075789158600NoneI.No. 3.3.7Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.10-12 Module .Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each361.2361.21.0FalseNoneNoneFalseNoneFalse361.20
4075790158600NoneI.No. 3.5.6Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.16 Module .Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each416.85416.851.0FalseNoneNoneFalseNoneFalse416.850
4075791158600NoneI.No. 3.5.7Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.6A One Way Switch Common SR 2023-24 vol-6,pg no-9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each107.1107.11.0FalseNoneNoneFalseNoneFalse107.10
4075792158600NoneI.No. 3.6.1Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Three Way socket Common SR 2023-24 vol-6,pg no-9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each179.55179.551.0FalseNoneNoneFalseNoneFalse179.550
4075793158600NoneI.No. 3.6.3Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293Stepped Fan Regulator Two Module Common SR 2023-24 vol-6,pg no-9 Stepped Fan Regulator Two Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each328.65328.652.0FalseNoneNoneFalseNoneFalse657.30
4075794158600NoneI.No. 3.6.4Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16A Universal Socket Common SR 2023-24 vol-6,pg no-9 . ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each247.8247.85.0FalseNoneNoneFalseNoneFalse1239.00
4075795158600NoneI.No. 3.6.10Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. TV/Telephone Socke Common SR 2023-24 vol-6,pg no-9 . ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each163.8163.85.0FalseNoneNoneFalseNoneFalse819.00
4075796158600NoneI.No. 3.6.11Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board.6A Bakelite Ceiling Rose.Common SR 2023-24 Vol-6 page no-10 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each81.981.95.0FalseNoneNoneFalseNoneFalse409.50
4075797158600NoneI.No. 3.14.5Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board.6A Pendant Holder.Common SR 2023-24 Vol-6 page no-10 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each74.5574.555.0FalseNoneNoneFalseNoneFalse372.750
4075798158600NoneI.No. 3.14.6Supplying and fixing regular 4 Way MCCB distribution Panel confirming to IS/IEC 61439 - 3 and IK09 tested as per IS/IEC 62262 with minimum IP43 protection provided with Polyurethane (PUR) gasket, with suitable earthing system, on wall/wood board/flush mounting using required cl A , bolts, nuts, etc., with provision for fixing of suitable type capacity MCCB's as an incomer for 3 phase Double door with necessary bus bar completely wired to use on 440V 3phase 4 wire powder coated painting etc., complete with a provision for fixing of single/three phase suitable capacity MCB's as outgoings confirming to IS/IEC 60898 - 2.Common SR 2023-24 Vol-6 page no-17 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each549.15549.151.0FalseNoneNoneFalseNoneFalse549.150
4075799158600NoneI.No. 5.17.4Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure.4 Way SP & N .Common SR 2023-24 Vol-6 page no-18 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each1303.051303.051.0FalseNoneNoneFalseNoneFalse1303.050
4075800158600NoneI.No. 5.19.1Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 20A single phase Class-1 Accuracy with Temper Proof Energy Meter.Common SR 2023-24 Vol-6 page no-19 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each1449.01449.01.0FalseNoneNoneFalseNoneFalse1449.00
4075801158600NoneI.No. 5.3Supplying capacitor type ceiling fan complete with down rod blades,shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system.48" Sweep (1200 mm) Regular mode.Common SR 2023-24 Vol-6,Page no-30 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each3133.23133.22.0FalseNoneNoneFalseNoneFalse6266.40
4075802158600NoneI.No. 6.3.1Supplying of .....feet -PVC Batten with integrated LED tube .... W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition.LED light fitting 1 x 4' - 20/22 W.Common SR 2023-24 Vol-6,Page no-43. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each724.5724.51.0FalseNoneNoneFalseNoneFalse724.50
4075803158600NoneI.No. 11.3.2Supplying & fixing of retrofit type - LED bulb ...... W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70%. efficacy 80 lumen per W, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition.9W, 6500K.Common SR 2023-24 Vol-6,Page no-47 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each168.0168.02.0FalseNoneNoneFalseNoneFalse336.00
4075804158600NoneI.No. 13.11GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg.Common SR 2023-24,Vol-6 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each780.15780.151.0FalseNoneNoneFalseNoneFalse780.150
4075805158600NoneI.No. 51.01Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No709.8709.81.0FalseNoneNoneFalseNoneFalse709.80
4075806158600NoneI.No. 54.02Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No325.5325.51.0FalseNoneNoneFalseNoneFalse325.50
4075807158600NoneI.No. 54.03Digging of Pit for providing GI Pipe type Earthing for Haed Soil ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Bag3139.53139.51.0FalseNoneNoneFalseNoneFalse3139.50
4075808158600NoneI.No. 1.6.21.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 10 Sqmm, 2 Core, (9 GI Strips - 4 x 0.8 mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Pit83193.683193.60.03FalseNoneNoneFalseNoneFalse2495.8080
4075809158600NoneI.No. 32.01Earth work excavation for cable trench of 0.5 to 0.75 Mtr. Width and Depth upto 1 Mtr including trial pits, depositing on bank upto a lead of 50 Mtr, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign Boards at every 100 Mtr wherever necessary as directed.In Ordinary Soil. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Km273.0273.010.0FalseNoneNoneFalseNoneFalse2730.00
4075810158600NoneI.No. 29.02Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff. 2.5 to 25 Sqmm (Single/3.5/4 Core) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.cm21930.321930.30.03FalseNoneNoneFalseNoneFalse657.9090
4075811158600NoneI.No. 21.05Supplying heavy gauge PVC conduit pipe 25mm dia 2 mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws.25 mm dia 2 mm thick.Common Sr 2023-24 page no-2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Km85.0585.0525.0FalseNoneNoneFalseNoneFalse2126.250
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17272661960000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17272661960000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17272661960000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17272661960000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17272661960000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17272661960000NoneNoneELIGIBILITYDepartment Registration DetailsNone
17272661960000NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17272661960000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17272661960000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17272661960000NoneNoneELIGIBILITYBanker DetailsNone
17272672050000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17272672170000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17272672230000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17272672310000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17272672370000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka.None
17272672430000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27-07-2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17272672530000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders.None
17272672590000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17272672660000NoneNoneELIGIBILITYThe Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent.None
17272672720000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17272672790000NoneNoneELIGIBILITYThe Tenderer shall scan Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machineries and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17272672860000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or what so ever.None
17272672940000NoneNoneELIGIBILITYThe tenderer shall maintain the Road/Building during the defect liability period.None
17272673000000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing KPP-procurement portal.None
17272673060000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25. And Value at 2024-25 price level, of existing commitments and on-going works to be executed during the next 12 months (Financial commitment of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25) in the Technical Qualification Criteria mentioned in the next section.None
17272673130000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17272673220000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per GO No: FD/3/PCL/2008 Bangalore Dated 21.11.2008.None
17272673280000NoneNoneELIGIBILITYThe tenderer shall furnish required information in all formats. Scan and upload all Formats/Original documents required for this bid to the e-procurement portal. The Original Formats/Documents shall be produced at the time of opening of Technical Bid for physical verification.None
17272673340000NoneNoneELIGIBILITYThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17272673440000NoneNoneELIGIBILITYThe time stipulated for completion of work is 6 (Six) calendar months including rainy season.None
17272673510000NoneNoneELIGIBILITYThe defect liability period for the work is 24 (Twenty Four) calendar months.None
17272673590000NoneNoneELIGIBILITYThe Agency shall comply with ISO14001 (Environmental Management System) requirement during execution of work.None
17272673660000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24, (a) achieved in at least two financial years an annual financial turnover (in all classes of civil engineering construction works only) of Rs.16.80 Lakhs.None
17272673750000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24, (b) satisfactorily completed as prime contractor, at least one similar work such as CONSTRUCTION OF BUILDING WORKS of value not less than Rs.8.40 Lakhs.None
17272673830000NoneNoneELIGIBILITYInformation on Existing commitments and on going works which are yet to be completed.None
17272673890000NoneNoneELIGIBILITYInformation of the works for which Tender acceptance letters are received.None
17272673950000NoneNoneELIGIBILITYInformation of the works for which Tenderer has submitted Tender.None
17272674010000NoneNoneELIGIBILITYInformation on litigation in which the Tenderer is involved.None
17272674070000NoneNoneELIGIBILITYAt the time of opening of Financial Bids, the Bidders shall furnish all the documents uploaded in original to this office for verification.None
17272675280000NoneNoneELIGIBILITYThe tenderer shall submit an affidavit stating that he has not involved in litigation with Government, also he shall state that, amount of existing / on going works and amount of works awarded to him and yet to be commenced.None
17272675330000NoneNoneELIGIBILITYThe tenderers shall note that as per the Government Order No.FD/850/EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015, the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for supply of goods but not for works.None
17272675400000NoneNoneELIGIBILITYThe tenderer shall note that, the increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17272675460000NoneNoneELIGIBILITYThe tenderer shall note that, the GST at 18% shall be paid to the tendered amount separately.None
17272675520000NoneNoneELIGIBILITYThe tenderers shall note that, as per The Karnataka Minor Mineral Concession Rules-1964, it is mandatory to submit the Mineral dispatch Permits (MDPs) issued by a competent authority, along with the bills. If not, penalty will be levied as per the prevailing clauses.None
17272675580000NoneNoneELIGIBILITYIt is mandatory for the contractor to upload the work done certificate issued by an officer not below the rank of Executive Engineer duly indicating the work indent numbers for works costing more than Rs.5.00 lakhsNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD Contractor Registration CertificateTrueTechnical Bid
Annual Turnover Certificate for the last five years duly attested by the Notary or Government Gazetted Officer Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Similar Nature CONSTRUCTION OF BUILDING WORKS work Done Certificate as Prime Certificate from competent authority not below the rank of Executive Engineer or equivalent duly attested by the Notary or Government Gazetted Officer Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Physical and financial Implementation calendar formatTrueTechnical Bid
Existing Commitments / Ongoing worksTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone