1727439356000 | 0 | None | None | Bridges/Culverts | Construction of Foot Bridge to thodu Near Kaniyara Girish house comes under B.Shettigeri grama panchayath in Ponnampet taluk. | 593049.03 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4096795 | 159586 | None | PWD SR 2023-24 Volume-I Page No-5 Item No.-1.4.1 | Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 284.59 | 284.59 | 38.61 | False | None | None | False | None | False | 10988.0199 | 0 | 4096796 | 159586 | None | PWD SR 2023-24 Volume-I Page No-5 Item No.-1.4.2 | Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5m to 3.00m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 319.09 | 319.09 | 37.32 | False | None | None | False | None | False | 11908.4388 | 0 | 4096797 | 159586 | None | PWD SR 2023-24 Volume-I Page No-15 Item No.-2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10)Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 6707.68 | 6707.68 | 5.05 | False | None | None | False | None | False | 33873.784 | 0 | 4096798 | 159586 | None | PWD SR 2023-24 Volume-I Page No-15 3Item No.-2.2.3 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 7096.32 | 7096.32 | 8.64 | False | None | None | False | None | False | 61312.2048 | 0 | 4096799 | 159586 | None | PWD SR 2023-24 Volume-I Page No-16 Item No.-2.6.1 | Formwork For Staging -For Height upto 5 m rates, adopt Formwork percentage as per Appendix-I for item no 2.4.1 to 2.5.5 - Addendum-I Additionalities for Formwork, Centering & Scaffolding - (foundation, sub structure of cross drainages) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 354.82 | 354.82 | 8.64 | False | None | None | False | None | False | 3065.6448 | 0 | 4096800 | 159586 | None | PWD SR 2023-24 Volume-IPage No-16 Item No.-2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 7096.32 | 7096.32 | 14.09 | False | None | None | False | None | False | 99987.1488 | 0 | 4096801 | 159586 | None | PWD SR 2023-24 Volume-I Page No-16 Item No.-2.6.1 | Formwork For Staging -For Height upto 5 m rates, adopt Formwork percentage as per Appendix-I for item no 2.4.1 to 2.5.5 Addendum-I Additionalities for Formwork, Centering & Scaffolding - (Piers and abutments) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 709.63 | 709.63 | 14.09 | False | None | None | False | None | False | 9998.6867 | 0 | 4096802 | 159586 | None | PWD SR 2023-24 Volume-I Page No-16 Item No.-2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technicalspecifications.s. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 7664.16 | 7664.16 | 5.75 | False | None | None | False | None | False | 44068.92 | 0 | 4096803 | 159586 | None | PWD SR 2023-24 Volume-I Page No-16 Item No.-2.6.1 | Formwork For Staging -For Height upto 5 m rates, adopt Formwork percentage as per Appendix-I for item no 2.4.1 to 2.5.5 - Addendum I Additionalities for Formwork, Centering & Scaffolding - (solid slab super structure) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 1532.83 | 1532.83 | 5.75 | False | None | None | False | None | False | 8813.7725 | 0 | 4096804 | 159586 | None | PWD SR 2023-24 Volume-I Page No-18 Item No.-2.11h | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other types of Structure ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | t | 88492.32 | 88492.32 | 2.35 | False | None | None | False | None | False | 207956.952 | 0 | 4096805 | 159586 | None | PWD SR 2023-24 Volume-III Page No-117Item No.-12.1 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 154.56 | 154.56 | 14.0 | False | None | None | False | None | False | 2163.84 | 0 | 4096806 | 159586 | None | PWD SR 2023-24 Vol.-III Page No-121 Item No.-13.6 | Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification ( Ref. to MoRT&H : 2703.2 & IRC - 1900 ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 4959.36 | 4959.36 | 7.6 | False | None | None | False | None | False | 37691.136 | 0 | 4096807 | 159586 | None | PWD SR 2023-24 Vol.-III Page No-117 Item No.-12.4 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 2998.24 | 2998.24 | 7.64 | False | None | None | False | None | False | 22906.5536 | 0 | 4096808 | 159586 | None | PWD SR 2023-24 Vol.-III Page No-117 Item No.-12.3A | Back filling behind abutment, wing wall and return wallcomplete including compaction as per drawing and Technical Specification. A Granular material ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 1308.16 | 1308.16 | 11.76 | False | None | None | False | None | False | 15383.9616 | 0 | 4096809 | 159586 | None | PWD SR 2023-24 Volume-I Page No-7 Item No.-1.8 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 530.88 | 530.88 | 10.8 | False | None | None | False | None | False | 5733.504 | 0 | 4096810 | 159586 | None | PWD SR 2023-24 Volume-III Page No-26 Item No.-4.17 | Wet Mix Macadam (Plant mix method) : Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 2866.08 | 2866.08 | 6.0 | False | None | None | False | None | False | 17196.48 | 0 |
|