1725966754000 | 0 | None | None | Other Works | Construction of compound wall in Ward no7 | 168104.01 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3952067 | 153061 | None | 001 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work Besic Rate (PWD SR 2023-24 Vol:1 P.NO.8 I.No:1.4.1 )
| Cum | 105.06 | 105.06 | 11.82 | False | None | None | False | None | False | 1241.8092 | 0 | 3952068 | 153061 | None | 002 | Removal of Unserviceable Soil with Disposal upto a suitabledistance as directed by the Engineer incharge of work Besic Rate (PWD SR 2023-24 Vol:3 P.NO.17 I.No:3.1 )
| Cum | 87.55 | 87.55 | 1.38 | False | None | None | False | None | False | 120.819 | 0 | 3952069 | 153061 | None | 003 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap /basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately,Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates Besic Rate (PWD SR 2023-24 Vol:1 P.NO.15 I.No:2.1.3 )
| Cum | 6168.67 | 6168.67 | 1.78 | False | None | None | False | None | False | 10980.2326 | 0 | 3952070 | 153061 | None | 004 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 Vol:1 P.NO.15 I.No:2.2.1.1
| Cum | 5962.67 | 5962.67 | 2.1 | False | None | None | False | None | False | 12521.607 | 0 | 3952071 | 153061 | None | 005 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Besic Rate (PWD SR 2023-24 Vol:1 P.NO.16 I.N0 2.4.2)
| Cum | 6512.69 | 6512.69 | 1.53 | False | None | None | False | None | False | 9964.4157 | 0 | 3952072 | 153061 | None | 006 | As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. (PWD SR 2023-24 Vol:2, P.No.A-7I No.22-23
| Cum | 3524.15 | 3524.15 | 1.07 | False | None | None | False | None | False | 3770.8405 | 0 | 3952073 | 153061 | None | 007 | Supplying, Fitting and Placing un-coated TMT bar Reinforcement in sub-structure complete as per Drawing and Technical Specifications. Besic Rate (PWD SR 2023-24 Vol: 1 P.NO.18 I.N0 2.11a)
| Tonne | 92140.71 | 92140.71 | 0.27 | False | None | None | False | None | False | 24877.9917 | 0 | 3952074 | 153061 | None | 008 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with Cement mortar 1:6 (1 cement : 6 coarse sand): 12 graded stone aggregate 20 mm nominal size) upto plinth level with :(PWD SR 2023-24 Vol:2 P.NO.9 I.No:5.1.1 )
| Cum | 5779.33 | 5779.33 | 5.67 | False | None | None | False | None | False | 32768.8011 | 0 | 3952075 | 153061 | None | 009 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x 200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications (PWD SR 2023-24 Vol:2 P.NO.17 I.No:6.32)
| Sqm | 1349.3 | 1349.3 | 27.0 | False | None | None | False | None | False | 36431.1 | 0 | 3952076 | 153061 | None | 010 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Vol:2 P.NO.41 I.No:8.2.1)
| Sqm | 303.85 | 303.85 | 32.4 | False | None | None | False | None | False | 9844.74 | 0 | 3952077 | 153061 | None | 011 | Providing White washing with lime to give an even shade :New work (three coats)with lime of approved quality, including cost of materials, labour complete as per specifications and as per directions of Engineerin charge. (PWD SR 2023-24 Vol:2 PNO44 I.No:8 | Sqm | 26.78 | 26.78 | 215.97 | False | None | None | False | None | False | 5783.6766 | 0 | 3952078 | 153061 | None | 012 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Vol:2 P.NO.45 I.No:8.28)
| Sqm | 91.67 | 91.67 | 215.97 | False | None | None | False | None | False | 19797.9699 | 0 |
|