Organisation Chain | MOIL Limited | Tender Reference Number | MOIL/MOIL LIMITED/CMC/24-25/ET/34 | Tender ID | 2024_MOIL_760103_1 | Withdrawal Allowed | Yes | Tender Type | Open Tender | Form Of Contract | Lump-sum | Tender Category | Works | No. of Covers | 2 | General Technical Evaluation Allowed | No | ItemWise Technical Evaluation Allowed | No | Payment Mode | Offline | Is Multi Currency Allowed For BOQ | No | Is Multi Currency Allowed For Fee | No | Allow Two Stage Bidding | No |
|
|
|
Offline | 1 | RTGS / ECS / NEFT | 2 | As Per Tender Document |
|
|
|
|
| |
1 | Fee/PreQual/Technical | Construction of foundation and other Steel Structural support System for Installation and commission | .pdf | 2 | Finance | Construction of foundation and other Steel Structural support System for Installation and commission | .xls |
|
|
|
|
|
|
|
|
|
|
Tender Fee in ₹ | 0.00 | Fee Payable To | Nil | Fee Payable At | Nil | Tender Fee Exemption Allowed | No |
|
| |
EMD Amount in ₹ | 25,000 | EMD Exemption Allowed | No | EMD Fee Type | fixed | EMD Percentage | NA | EMD Payable To | MOIL LIMITED | EMD Payable At | NAGPUR | |
|
|
|
|
|
|
|
|
Title | Construction of foundation and other Steel Structural support System for Installation and commissioning of 3 TPH fluidized Bed combustion Steam Boiler at EMD plant, Dongri Buzurg Mine. | Work Description | Construction of foundation and other Steel Structural support System for Installation and commissioning of 3 TPH fluidized Bed combustion Steam Boiler at EMD plant, Dongri Buzurg Mine. | NDA/Pre Qualification | As Per Tender Documents | Independent External Monitor/Remarks | NA | Tender Value in ₹ | 47,43,860 | Product Category | Civil Works | Sub category | NA | Contract Type | Tender | Bid Validity(Days) | 120 | Period Of Work(Days) | 90 | Location | Dongri Buzurg Mine | Pincode | 441907 | Pre Bid Meeting Place | Online on Portal | Pre Bid Meeting Address | Online on Portal | Pre Bid Meeting Date | 21-Jun-2024 11:00 AM | Bid Opening Place | Online on Portal | Should Allow NDA Tender | No | Allow Preferential Bidder | No | |
|
|
|
Published Date | 14-Jun-2024 05:00 PM | Bid Opening Date | 22-Jul-2024 04:00 PM | Document Download / Sale Start Date | 14-Jun-2024 05:00 PM | Document Download / Sale End Date | 22-Jul-2024 03:00 PM | Clarification Start Date | 21-Jun-2024 11:00 AM | Clarification End Date | 24-Jun-2024 05:00 PM | Bid Submission Start Date | 29-Jun-2024 03:00 PM | Bid Submission End Date | 22-Jul-2024 03:00 PM |
|
|
|
NIT Document | 1 | Tendernotice_1.pdf | Construction of foundation and other Steel Structural support System for Installation and commissioning of 3 TPH fluidized Bed combustion Steam Boiler at EMD plant, Dongri Buzurg Mine. | 11923.09 |
|
| Download as zip file | Work Item Documents | 1 | Tender Documents | NIT ET 34.pdf | Construction of foundation and other Steel Structural support System for Installation and commissioning of 3 TPH fluidized Bed combustion Steam Boiler at EMD plant, Dongri Buzurg Mine. | 11923.09 |
|
|
|
|
|
1 | Extention of tender opening part I | Date | |
|
|
|
|
Name | Mr. D. M. Borkute, Jt.G.M (Materials) CMC | Address | MOIL LTD, 1A , MOIL Bhavan, Katol road, Nagpur 440013 |
|
|
|
|