|
Organisation Chain | I and FC||CE - I and FC Kashmir | Tender Reference Number | E-NIT NO.04 of 2024-25 | Tender ID | 2024_IFC_251156_1 | Withdrawal Allowed | Yes | Tender Type | Open Tender | Form Of Contract | Percentage | Tender Category | Works | No. of Covers | 1 | General Technical Evaluation Allowed | No | ItemWise Technical Evaluation Allowed | No | Payment Mode | Offline | Is Multi Currency Allowed For BOQ | No | Is Multi Currency Allowed For Fee | No | Allow Two Stage Bidding | No |
|
|
| |
1 | Fee/PreQual/Technical/Finance | scanned copy of Regd.Carrd with renewal,CDR,Treasury Reciept,GST,ITR latest quarter,Pan Card, Biodat | .pdf | | | BOQ | .xls |
|
|
|
|
|
|
|
|
|
|
Tender Fee in ₹ | 200 | Fee Payable To | Executive Engineer Flood Control Division Kakapora | Fee Payable At | Jammu and Kashmir | Tender Fee Exemption Allowed | No |
|
| |
EMD Amount in ₹ | 8,080 | EMD Exemption Allowed | No | EMD Fee Type | percentage | EMD Percentage | 2.0% | EMD Payable To | Executive Engineer Flood Control Division Kakapora | EMD Payable At | Jammu and Kashmir |
|
|
|
|
|
|
|
Title | Construction of Flood protection work by way of crates on left side of Vedji Nallah upstream culvert at Ladhi Mohalla at Cheek Shamsipora Shopian. | Work Description | Construction of Flood protection work by way of crates on left side of Vedji Nallah upstream culvert at Ladhi Mohalla at Cheek Shamsipora Shopian. | NDA/Pre Qualification | Please refer Tender documents. | Independent External Monitor/Remarks | NA | Tender Value in ₹ | 4,04,000 | Product Category | Civil Works | Sub category | NA | Contract Type | Tender | Bid Validity(Days) | 90 | Period Of Work(Days) | 20 | Location | Kakapora | Pincode | 192304 | Pre Bid Meeting Place | NA | Pre Bid Meeting Address | NA | Pre Bid Meeting Date | NA | Bid Opening Place | Flood Control Division kakapora | Should Allow NDA Tender | No | Allow Preferential Bidder | No | |
|
|
|
Published Date | 25-Jun-2024 06:00 PM | Bid Opening Date | 09-Jul-2024 11:00 AM | Document Download / Sale Start Date | 25-Jun-2024 06:00 PM | Document Download / Sale End Date | 08-Jul-2024 06:00 PM | Clarification Start Date | NA | Clarification End Date | NA | Bid Submission Start Date | 25-Jun-2024 06:00 PM | Bid Submission End Date | 08-Jul-2024 06:00 PM |
|
|
|
|
|
|
Name | Executive Engineer Flood Control Division Kakapora | Address | Flood Control Division kakapora HQ.Marwal |
|
|
|
|