Organisation ChainCentral Coalfields Limited||NK Dakara
Tender Reference NumberNK/Survey/2024-25/eNIT/01
Tender ID2024_CCL_307753_1Withdrawal AllowedYes
Tender TypeOpen TenderForm Of ContractPercentage
Tender CategoryWorksNo. of Covers1
General Technical Evaluation Allowed YesItemWise Technical Evaluation AllowedNo
Payment ModeOnlineIs Multi Currency Allowed For BOQNo
Is Multi Currency Allowed For FeeNoAllow Two Stage BiddingNo
 
Online Bankers
S.NoBank Name
1Axis Agreegator Bank Netbanking
Cover NoCover TypeDescriptionDocument Type
1Fee/PreQual/Technical/FinanceScanned documents as per NIT.pdf
BOQ.xls
 
 
S.NoCategorySub CategorySub Category DescriptionFormat/File
1.WORKS PAN PAN 
2.WORKS LEGAL STATUS LEGAL STATUS 
3.WORKS GST GOODS AND SERVICE TAX registration certificate 
 
 
EMD Amount in ₹ 4,100EMD Exemption AllowedNo
EMD Fee Type fixed EMD PercentageNA
EMD Payable ToNilEMD Payable AtNil
 
 
TitleConstruction of flooring of 49L substation in Lower Bachra seam under Churi UG Project.
Work DescriptionConstruction of flooring of 49L substation in Lower Bachra seam under Churi UG Project.
NDA/Pre QualificationAs per NIT
Independent External Monitor/RemarksNA
Tender Value in ₹ 3,23,083 Product CategoryMiscellaneous Works Sub categoryNA 
Contract TypeTenderBid Validity(Days)120Period Of Work(Days)30 
LocationChuri UgPincode829210 Pre Bid Meeting PlaceNA 
Pre Bid Meeting AddressNA Pre Bid Meeting DateNA Bid Opening PlaceGM office N K Area
Should Allow NDA TenderNo Allow Preferential BidderNo
 
Published Date09-May-2024 02:00 PMBid Opening Date22-May-2024 10:00 AM
Document Download / Sale Start Date09-May-2024 02:00 PMDocument Download / Sale End Date21-May-2024 05:00 PM
Clarification Start Date09-May-2024 02:00 PMClarification End Date16-May-2024 05:00 PM
Bid Submission Start Date09-May-2024 02:00 PM Bid Submission End Date21-May-2024 05:00 PM
 
NIT Document
S.NoDocument NameDescriptionDocument Size (in KB)
1Tendernotice_1.pdf Construction of flooring of 49L substation in Lower Bachra seam under Churi UG Project.2755.87
Download as zip file
Work Item Documents
S.NoDocument TypeDocument NameDescriptionDocument Size (in KB)
1BOQBOQ_318909.xlsDigital SignatureConstruction of flooring of 49L substation in Lower Bachra seam under Churi UG Project.338.50
 
NameArea Survey Officer
AddressGM office N K Area
 
 
Click Here For Main Source