|
Organisation Chain | Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer (PH Circle Alappuzha) | Tender Reference Number | Re Tender No 04/2024 25/SE/PHC/ALP /RT 2 | Tender ID | 2024_KWA_675126_1 | Withdrawal Allowed | Yes | Tender Type | Open Tender | Form Of Contract | Item Rate | Tender Category | Works | No. of Covers | 2 | General Technical Evaluation Allowed | No | ItemWise Technical Evaluation Allowed | No | Payment Mode | Online | Is Multi Currency Allowed For BOQ | No | Is Multi Currency Allowed For Fee | No | Allow Two Stage Bidding | No |
|
|
| |
1 | Fee/PreQual/Technical | Scanned and signed copy of preliminary agreement | .pdf | | | Scanned and Signed copy of Contractors license ,non relation certificate ,IT,GST registration certif | .pdf | | | Scanned copy of Audited Balance Sheet for past 3 Years | .pdf | | | Information in Technical bid Q1 to Q8 | .pdf | | | Scanned copy of Proof of Experience. | .pdf | | | solvency certificate, MoU with Pipe Manufactures, PWD contractor for Road works | .pdf | | | Digitally Signed tender documents NIT | .pdf | 2 | Finance | Contractors offer (Digitally signed BOQ) | .xls |
|
|
|
|
|
|
|
|
|
1. | Certificate Details | Permanent Account Number | Permanent Account Number | | 2. | Certificate Details | Registration Certificate | Registration Certificate | | 3. | Financial Details | Bankers Details | Bankers Details | | 4. | Miscellaneous | Work Completed Certificate Copies | Work Completed Certificate Copies | | 5. | Miscellaneous | Company profile | Company profile | | 6. | Work Details | Works Completed Details | Works Completed Details | |
|
|
|
|
|
Tender Fee in ₹ | 19,518 | Fee Payable To | Nil | Fee Payable At | Nil | Tender Fee Exemption Allowed | No |
|
| |
EMD Amount in ₹ | 5,00,000 | EMD Exemption Allowed | No | EMD Fee Type | fixed | EMD Percentage | NA | EMD Payable To | Nil | EMD Payable At | Nil |
|
|
|
|
|
|
|
Title | KIIFB Tranche 6 WRD025 29-Kuttanad drinking water project PhaseII in Alappuzha Dist.-Supply and laying of transmission main 1A1 to Thalavady, Edathua, Veeyapuram, Construction of OHSR at Thalavady, Edathua, Rehabilitation of existing OHSR at Veeyapur | Work Description | KIIFB Tranche 6 WRD025 29-Kuttanad drinking water project PhaseII in Alappuzha Dist.-Supply and laying of transmission main 1A1 to Thalavady, Edathua, Veeyapuram, Construction of OHSR at Thalavady, Edathua, Rehabilitation of existing OHSR at Veeyapur | NDA/Pre Qualification | Please refer Tender documents. | Independent External Monitor/Remarks | NA | Tender Value in ₹ | 17,52,51,203 | Product Category | Civil Works - Water Works | Sub category | NA | Contract Type | Tender | Bid Validity(Days) | 120 | Period Of Work(Days) | 365 | Location | Edathua | Pincode | 689573 | Pre Bid Meeting Place | PH CIRCLE KWA ALAPPUZHA | Pre Bid Meeting Address | SUPERINTENDING ENGINEER
PH CIRCLE KWA ALAPPUZHA | Pre Bid Meeting Date | 22-Jun-2024 11:00 AM | Bid Opening Place | PH CIRCLE KWA ALAPPUZHA | Should Allow NDA Tender | No | Allow Preferential Bidder | No | |
|
|
|
Published Date | 15-Jun-2024 05:00 PM | Bid Opening Date | 04-Jul-2024 02:30 PM | Document Download / Sale Start Date | 15-Jun-2024 05:00 PM | Document Download / Sale End Date | 03-Jul-2024 02:00 PM | Clarification Start Date | 15-Jun-2024 05:00 PM | Clarification End Date | 03-Jul-2024 02:00 PM | Bid Submission Start Date | 15-Jun-2024 05:00 PM | Bid Submission End Date | 03-Jul-2024 02:00 PM |
|
|
|
NIT Document | | PreBid Meeting Document | | Download as zip file | Work Item Documents | 1 | Tender Documents | NIT1AND2.pdf | NIT | 1019.42 | 2 | Other Document | Abstractofpipe.pdf | Abstract of pipe | 606.16 | 3 | Other Document | OHSRDWG.pdf | OHSR DWG | 3093.79 | 4 | Other Document | OHSRdia.pdf | OHSR Diagram | 241.15 | 5 | Other Document | Schematicdia.pdf | Schematic diagram | 364.64 | 6 | Other Document | Soilreport1.pdf | Soil report 1 | 426.16 | 7 | Other Document | Soilreport2.pdf | Soil report 2 | 644.66 | 8 | Other Document | Steelbridge.pdf | Steel brigde diagram | 108.59 | 9 | Other Document | Transmainalignment.pdf | Transmission main alignment 1 | 482.85 | 10 | Other Document | Transmainalignment2.pdf | Transmission main alignment 2 | 482.85 | 11 | BOQ | BOQ_1049901.xls | BOQ | 437.50 | 12 | Additional Documents | KIIFBcircularNew.pdf | KIIFB Circular | 5179.13 | 13 | Additional Documents | empanellist.pdf | Empanel list | 266.70 |
|
|
|
|
|
1 | Date extension 1 | Date | | 2 | NIT VOLUME 2 Correction | Other | | 3 | Clarification in completion period | Technical Bid | |
|
|
|
|
Name | SUPERINTENDING ENGINEER | Address | SUPERINTENDING ENGINEER
PH CIRCLE KWA ALAPPUZHA |
|
|
|
|