Organisation ChainKerala Water Authority||Chief Engineer Northern Region (Kozhikkode)||Superintending Engineer (PH Circle Malappuram)||Executive Engineer (Project Division Malappuram)
Tender Reference NumberEE/PROJ/MPM/06/2024-25
Tender ID2024_KWA_692758_1Withdrawal AllowedYes
Tender TypeOpen TenderForm Of ContractItem Rate
Tender CategoryWorksNo. of Covers1
General Technical Evaluation Allowed NoItemWise Technical Evaluation AllowedNo
Payment ModeOnlineIs Multi Currency Allowed For BOQNo
Is Multi Currency Allowed For FeeNoAllow Two Stage BiddingNo
 
Online Bankers
S.NoBank Name
1SBI MOPS
Cover NoCover TypeDescriptionDocument Type
1Fee/PreQual/Technical/FinancePreliminary agreement.pdf
Letter submitting tender.pdf
Contractor licence.pdf
GST Certificate.pdf
Non relation ship certificate.pdf
Fee details.pdf
Tender documents.pdf
BOQ.xls
 
 
 
Tender Fee in ₹ 2,760
Fee Payable ToNilFee Payable AtNil
Tender Fee Exemption AllowedNo
EMD Amount in ₹ 50,000EMD Exemption AllowedNo
EMD Fee Type fixed EMD PercentageNA
EMD Payable ToNilEMD Payable AtNil
 
 
TitleState Plan- 2024-25-CWSS to Morayur, Pulpatta and Pookkottur Panchayath- Construction of pipe carrying steel bridge across Pottiyil stream at Perakamanna for 600mm dia RWPM
Work DescriptionState Plan 2024-25 CWSS to Morayur, Pulpatta and Pookkottur Panchayath- Construction of pipe carrying steel bridge across Pottiyil stream at Perakamanna for 600mm dia RWPM
NDA/Pre QualificationAs per NIT
Independent External Monitor/RemarksNA
Tender Value in ₹ 83,82,870 Product CategoryCivil Works - Others Sub categoryConstruction of steel bridge 
Contract TypeTenderBid Validity(Days)120Period Of Work(Days)270 
LocationMalappuramPincode676505 Pre Bid Meeting PlaceNA 
Pre Bid Meeting AddressNA Pre Bid Meeting DateNA Bid Opening PlaceProject Division ,KWA ,Malappuram
Should Allow NDA TenderNo Allow Preferential BidderNo
 
Published Date27-Sep-2024 12:00 PMBid Opening Date10-Oct-2024 03:00 PM
Document Download / Sale Start Date27-Sep-2024 12:00 PMDocument Download / Sale End Date09-Oct-2024 03:00 PM
Clarification Start Date27-Sep-2024 12:00 PMClarification End Date07-Oct-2024 12:00 PM
Bid Submission Start Date27-Sep-2024 12:00 PM Bid Submission End Date09-Oct-2024 03:00 PM
 
NIT Document
S.NoDocument NameDescriptionDocument Size (in KB)
1KWAGeneralConditionsforeTenderingV5.pdf General conditions of E Tendering Process708.62
2Tendernotice_1.pdf Tender notice196.33
Download as zip file
Work Item Documents
S.NoDocument TypeDocument NameDescriptionDocument Size (in KB)
1Tender DocumentsForm83T06.pdfDigital SignatureTender documents2023.09
2BOQBOQ_1078838.xlsDigital SignatureBOQ318.00
 
NameExecutive Engineer
AddressProject Division ,KWA ,Malappuram
 
 
Click Here For Main Source