Consultant pour l’étude et suivi des travaux relatifs au lot postes de l’ajout du second terne à la ligne 225 kv entre Nouakchott et Boulenouar
TDR deuxieme terne Nktt-BLNR 02.02.2024.pdf
19 February 2024
[Disclaimer: The below text is machine translated. For accurate information kindly refer the above text in original language.]
Consultant for the study and monitoring of work relating to the substation lot for the addition of the second circuit to the 225 kv line between Nouakchott and Boulenouar
TDR second phase Nktt-BLNR 02.02.2024.pdf
February 19, 2024