Consultant pour l’étude et suivi des travaux relatifs au lot postes de l’ajout du second terne à la ligne 225 kv entre Nouakchott et Boulenouar

Description: Icône PDF TDR deuxieme terne Nktt-BLNR 02.02.2024.pdf

Description: Icône PDF AMI n°04-CMI-24 -recrutement d’un consultant pour l’étude et suivi des travaux relatifs au lot postes de l’ajout du second terne à la l.pdf

19 February 2024

 

 

[Disclaimer: The below text is machine translated. For accurate information kindly refer the above text in original language.]

 

 

Consultant for the study and monitoring of work relating to the substation lot for the addition of the second circuit to the 225 kv line between Nouakchott and Boulenouar

Description: PDF icon TDR second phase Nktt-BLNR 02.02.2024.pdf

Description: PDF icon AMI n°04-CMI-24 - recruitment of a consultant for the study and monitoring of work relating to the batch of positions for the addition of the second phase to the l.pdf

February 19, 2024