Recrutement d’un consultant chargé de l’étude de mise en place de pipeline entre dépôt SMH et la centrale Nord 180MW (

Description: Icône PDF TDR recrutement d’un consultant chargé de l’étude de mise en place de pipeline entre dépôt SMH et la centrale Nord 180MW (Duale).pdf

Description: Icône PDF AMI n°05_CMI_2024 pour le recrutement d’un consultant chargé de l’étude de mise en place de pipeline entre dépôt SMH et la centrale N.pdf

19 February 2024

 

 

[Disclaimer: The below text is machine translated. For accurate information kindly refer the above text in original language.]

 

 

Recruitment of a consultant responsible for the study of the installation of a pipeline between the SMH depot and the 180MW North power plant (

Description: PDF icon TDR recruitment of a consultant responsible for the study of the implementation of the pipeline between the SMH depot and the North 180MW power plant (Duale).pdf

Description: PDF icon AMI n°05_CMI_2024 for the recruitment of a consultant responsible for the study of the installation of a pipeline between the SMH depot and the N power plant.pdf

February 19, 2024