Construction of 20 m Tower foundation, Chainlink wire mesh fencing& Solar foundation at Jaydodaysgang, Thimphu Bhutan Telecom Ltd  LiveParticipate


Procurement Category: Civil

Dzongkhag/Location: Thimphu

Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Medium)

Procurement Method: Open Tendering

Annual Procurement Plan: 2024

Bidding Process: Single Stage Bidding - Single Envelope

Contact Details: Pema Wangdi (Mr.) Civil Engineering Section, Western Region, BTL. Tel: +975 2 343434 Ext. 4027 | Mob: +975 17141880| pema.wangdi2573@bt.bt Bhutan Telecom Ltd: www.bt.bt |

Status: Live


BIDDING DETAILS

Submission Date: June 20 2024, 12:00 PM

Opening Date: June 21 2024, 02:30 PM

Prebid Date: None

Prebid Place: None

EARNEST MONEY DEPOSIT DETAILS

EMD Type: Lumpsum

EMD Value: Nu. 103,000.00/-

EVALUATION DETAILS

Financial Evaluation: 100%

AGENCY DOCUMENTS



Sl

Document

Link

1

Bid Form

Download

2

Integrity Pact Document

Download

3

RFP

Download

4

Drawings

Download

DOCUMENT PREREQUISITES FOR PARTICIPATION



Sl

Document

6

Bid Form

14

CDB License

21

Credit Line

25

Documents required (Equipment and Manpower)

26

Employment of VTI Graduates

27

Equipment

28

Equipment Documents

39

Human Resources

41

Integrity Pact Document

53

Tax Clearance

72

Trade License

TENDER ITEMS(BOQ/BOM)



Sl

Item Code

Item Name,

Additional Description/Specifications

UoM

Qty

1

20 m tower foundation at Jaydodaysgang

2

EW0002

Surface dressing of ground, including removal of vegetations and inequalities < 150mm deep, disposal of rubbish within 50m lead and 1.5m lifts - Hard Soil,

sq.m

400.0

3

EW0031

Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil,

cu.m

250.0

4

EW0032

Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Ordinary rock with or without blasting,

cu.m

250.0

5

EW0106

Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil,

cu.m

81.0

6

CW0008

Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size),

cu.m

3.77

7

RC0002

Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size),

cu.m

6.09

8

RC0083

Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete,

kg

680.0

9

RC0093

Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc.,

sq.m

30.71

10

EW0195

Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m,

cu.m

33.72

11

None

chain link fencing,

-

-

12

EW0001

Surface dressing of ground, including removal of vegetations and inequalities < 150mm deep, disposal of rubbish within 50m lead and 1.5m lifts - Ordinary Soil,

sq.m

120.0

13

EW0105

Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil,

cu.m

67.2

14

SM0072

Providing and laying Hand packed stone filling or soling with stones,

cu.m

9.0

15

SM0005

Providing & laying Random Rubble Masonry with hard stone in foundation & plinth - In cement mortar 1:4,

cu.m

12.06

16

CW0003

Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size,

cu.m

10.5

17

SW0003

Steel work in single section including cutting, hoisting, fixing and applying priming coat of red lead paint - In Tees, angles and channels,

kg

1268.46

18

EW0195

Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m,

cu.m

14.4

19

RC0090

Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc.,

sq.m

156.0

20

RW0213

Providing & fixing G.I chain-link mesh including fixing of post or struts, G.I staples (excluding the cost of posts/struts, earthwork, concrete etc.) - 4mm (8 SWG) x 50mm,

sq.m

216.0

21

None

Gate,

-

-

22

RW0016

Earthwork in Excavation in foundation trenches or drains including dressing of sides and ramming of bottom, disposal of surplus excavated soil within 50m lead - Hard Soil,

cu.m

0.7

23

CW0003

Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size,

cu.m

0.4

24

SW0021

Steel work welded, in built up sections, trusses, frame-works including cutting, hoisting, fixing and appl. priming coat of red - In Tees, angles and channels,

kg

120.0

25

RW0213

Providing & fixing G.I chain-link mesh including fixing of post or struts, G.I staples (excluding the cost of posts/struts, earthwork, concrete etc.) - 4mm (8 SWG) x 50mm,

sq.m

3.4

26

RC0093

Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc.,

sq.m

2.52

27

SW00044

Providing & fixing anodised aluminium tower bolt (barrel type) with aluminium screws etc. complete200mm,

each

1.0

28

None

Solar foundation,

-

-

29

EW0031

Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil,

cu.m

37.5

30

EW0106

Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil,

cu.m

11.88

31

CW0003

Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size,

cu.m

0.74

32

RC0002

Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size),

cu.m

3.25

33

RC0083

Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete,

kg

160.0

34

RC0093

Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc.,

sq.m

30.54

35

EW0195

Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m,

cu.m

12.05