Tender Details
Deptt./Rly. Unit PIU-RISHIKESH-CIVIL/RVNL
Tender No. RVNL-RKSH-BLTTENR-1-2024
Tender Title DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF BROAD GAUGE BALLASTLESS TRACK (BLT), SUPPLY OF BALLAST AND INSTALLATION OF TRACK (EXCLUDING SUPPLY OF RAILS AND TRACK SLEEPERS) BETWEEN CHAINAGE 6+015 (FLS) to 125+200 (FLS) IN CONNECTION WITH NEW BG LINE BETWEEN RISHIKESH AND KARANPRAYAG (125KM) IN THE STATE OF UTTARAKHAND, INDIA
Contract Type Works
Tender Type Open
Advertised Value9108403651.43
Bidding Style Single Rate for Each Schedule
Bidding System Two Packet System
Pre-Bid Required No
Pre-Bid Query Date Time Not Applicable
Tendering Section RKSH KNPG
Bidding Unit
Publishing Date / Time 29/01/2024 13:04
Period Of Completion 42 Months
Bidding Start Date 14/02/2024
Closing Date Time20/02/2024 11:00
Validity of Offer ( Days)120
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)20000000.00
Description"Detailed design and drawings of Ballastless track using Contractor's own fastening system for axle loads and speeds as specified i n the technical requirements & technical specifications in work requirements, section- 5, including submission of Design criteria, Calculations, Design Methodology, Detailed design, detailed drawings, construction methodology, QAP, maintenance manuals, damage rectification methodology, including all its various components a s per various input parameter and characte...
More DetailsClick Here To Open
Tender No:  RVNL-RKSH-BLTTENR-1-2024 Dept/Rly:  PIU-RISHIKESH-CIVIL/RVNL Closing Date/Time:   20/02/2024 11:00
 
Tender Title: DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF B...... Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 ESP_Byasi.pdf Vol 3 ESP
2 ESP_Devprayag.pdf VOL 3 ESP
3 ESP_DhariDevi.pdf Vol 3 ESP
4 ESP_Gauchar.pdf Vol 3 ESP
5 ESP_Gholtir.pdf Vol 3 ESP
6 ESP_Janasu.pdf Vol 3 ESP
7 ESP_Karanprayag.pdf Vol 3 ESP
8 ESP_Maletha.pdf Vol 3 ESP
9 ESP_Shivpuri.pdf Vol 3 ESP
10 ESP_Srinagar.pdf Vol 3 ESP
11 ESP_Tilani.pdf Vol 3 ESP
12 Bridge_GADs_Part1.pdf Bridge GAD
13 Bridge_GADs_Part2.pdf Bridge GAD
14 Bridge_GADs_Part3.pdf Bridge GAD
15 Bridge_GADs_Part4.pdf Bridge GAD
16 Bridge_GADs_Part5.pdf Bridge GAD
17 Bridge_GADs_Part6.pdf Bridge GAD
18 Bridge_GADs_Part7.pdf Bridge GAD
19 Bridge_GADs_Part8.pdf Bridge GAD
20 Bridge_GADs_Part9.pdf Bridge GAD
21 Bridge_GADs_Part10.pdf Bridge GAD
22 Bridge_GADs_Part11.pdf Bridge GAD
23 Bridge_GADs_Part12.pdf Bridge GAD
24 Bridge_GADs_Part13.pdf Bridge GAD
25 Bridge_GADs_Part14.pdf Bridge GAD
26 Bridge_GADs_Part15.pdf Bridge GAD
27 Bridge_GADs_Part16.pdf Bridge GAD
28 Bridge_GADs_Part17.pdf Bridge GAD
29 Bridge_GADs_Part18.pdf Bridge GAD
30 Pkg1_Plan.pdf Index Plan PK1
31 Pkg2_Plan.pdf Index Plan PK2
32 Pkg3_Plan.pdf Index Plan PK3
33 Pkg4_Plan.pdf Index Plan PK4
34 Pkg5_Plan.pdf Index Plan PK5
35 Pkg6_Plan.pdf Index Plan PK6
36 Pkg7a_Plan.pdf Index Plan PK7A
37 Pkg7b_Plan.pdf Index Plan PK7B
38 Pkg8_PlanSection_1.pdf Index Plan PK8
39 Pkg8_PlanSection_2.pdf Index Plan PK8
40 Pkg8_PlanSection_3.pdf Index Plan PK8
41 Pkg8_PlanSection_4.pdf Index Plan PK8
42 Pkg8_PlanSection_5.pdf Index Plan PK8
43 Pkg8_PlanSection_6.pdf Index Plan PK8
44 Pkg8_PlanSection_7.pdf Index Plan PK8
45 Pkg1_Section0.pdf L Section PK1
46 Pkg2_Section.pdf L Section PK2
47 Pkg3_Section.pdf L Section PK3
48 Pkg4_SectionDnLine.pdf L Section PK4
49 Pkg4_SectionUpLine.pdf L Section PK4
50 Pkg5_Section.pdf L Section PK5
51 Pkg6_Section.pdf L Section PK6
52 Pkg7a_Section.pdf L Section PK7A
53 Pkg7b_Section.pdf L Section PK7B
54 Pkg9_Section.pdf L Section PK9
55 ROW_Part1.pdf VOL3 ROW
56 ROW_Part2.pdf VOL3 ROW
57 ROW_Part3.pdf VOL3 ROW
58 ROW_Part4.pdf VOL3 ROW
59 ROW_Part5.pdf VOL3 ROW
60 ROW_Part6.pdf VOL3 ROW
61 Schematic_Diagrams_Part1.pdf Schematic Diagram
62 Schematic_Diagrams_Part2.pdf Schematic Diagram
63 Tunnel_GAD_1.pdf Tunnel GAD
64 Tunnel_GAD_2.pdf Tunnel GAD
65 Tunnel_GAD_3.pdf Tunnel GAD
66 Tunnel_GAD_4.pdf Tunnel GAD
67 Tunnel_GAD_5.pdf Tunnel GAD
68 Tunnel_GAD_6.pdf Tunnel GAD
69 Tunnel_GAD_7.pdf Tunnel GAD
70 Tunnel_GAD_8.pdf Tunnel GAD
71 Alignment_KML.pdf Alignment KML
72 ConcreteBufferStop.pdf ConcreteBufferStop
73 RVNL-HORCLBLT-1.pdf RVNL HORCL BLT 1
74 Stock_Yard.pdf Stock Yard
75 Typical_Tunnel_Cross_Section.pdf Typical Tunnel Cross Section
76 Volume_II_BLT_works_RT.pdf VOL 2
77 Volume_I_BLT_works_RT_Part1_2.pdf VOL 1
78 Volume_I_BLT_works_RT_Part2_1.pdf VOL 1
79 Volume_I_BLT_works_RT_Part3_1.pdf VOL 1
80 Volume_I_BLT_works_RT_Part4_1.pdf VOL 1
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued