Tender Details
Deptt./Rly. Unit ECOR-CONST-HQ-ENGG/ECOR
Tender No. EPC-CECONJDB2024005
Tender Title Jeypore -Malkangiri New Railway Line project: Construction of New BG Railway Line Between Jeypore (0.85 Km From CSB) to 41.5 Km involving Earthwork in Formation in Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridges, Road Over Bridges (ROBs), Road Under Bridges (RUBs), Protection Works, P.Way Track Works with Contractor's own material supplies including supply of Track Ballast, new wide based PSC Sleepers, Special PSC Sleepers (for Turnouts, Improvised SEJs, Guard Rails etc), Points (Thick Web Switches) & WCMS Crossings, Glued Joints, H- Beam/Composite Sleepers over Girder Bridges, Improvised SEJs, all P-Way fittings, OHE foundations, Supply and Erection of OHE Masts, Modification/Conversion to Underground for Overhead Electrical HT/LT Power Line Crossings, construction of Platforms, Station Buildings, Service Building, SP/SSP Buildings and Residential Buildings, Water Supply, indoor and outdoor Electrification etc on EPC Basis in Waltair Division of East Coast Railway.
Contract Type Works
Tender Type Open
Advertised Value6415201150.00
Bidding Style Single Rate for Tender
Bidding System Two Packet System
Pre-Bid Required Yes
Pre-Bid Query Date Time 24/02/2024 11:00 2nd Pre-Bid Conference Required No 2nd Pre-Bid Conference Date Time Not Applicable
Tendering Section TENDER
Bidding Unit Above/Below/Par
Publishing Date / Time 30/01/2024 16:14
Period Of Completion 24 Months
Bidding Start Date 16/05/2024
Closing Date Time30/05/2024 12:00
Validity of Offer ( Days)180
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)20000000.00
Description- Execution of scope of work as per Schedule-G of EPC Agreement. S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit ♥♥ of 8 Run Date/Time: 30/01/2024 16:15:06 ECOR-CONST-HQ-ENGG/ECOR TENDER DOCUMENT Tender No: EPC-CECONJDB2024005 Closing Date/Time: 30/05/2024 12:00 ---------------------------------------------------------------------- Schedule B1-Execution of any Bridge work not covered in Schedule A above (Schedule- G of EPC Agreement) through items from ECoR USSOR-2021, as per work orders based on requirement and instruction of Authority Engineer. 100000000.00 02 Lump Sum 100000000.00 AT Par 100000000.00
More DetailsClick Here To Open
Tender No:  EPC-CECONJDB2024005 Dept/Rly:  ECOR-CONST-HQ-ENGG/ECOR Closing Date/Time:   30/05/2024 12:00
 
Tender Title: Jeypore -Malkangiri New Railway Line project: Construction o...... Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 FinalLocationSurveyreportEPC0.85to41.5kmpart-1.pdf FLS Report
2 L-Section00-05Km.pdf L Section Km 0 to 5
3 L-section05-10Kmcmprsd.pdf L Section Km 5 to 10
4 L-Section10-15Km.pdf L Section Km 10 to 15
5 L-Section15-20Km.pdf L Section Km 15 to 20
6 L-section20-25Kmcmprsd.pdf L Section Km 20 to 25
7 L-section25-30Kmcmprsd.pdf L Section Km 25 to 30
8 L-Section30-33Km.pdf L Section Km 30 to 33
9 L-section33-40Km.pdf L Section Km 33 to 40
10 indexplanandSection0-33Kmcmprsd.pdf Index plan Km 0 to 33
11 Indexplantoposheet0-126Km-Model.pdf Index plan topo sheet Km 0 to 126
12 STGoomtyJeypore-Malkangiri.pdf Drg S and T goomties
13 StandardQtrsdrgtype_III.pdf Drg Standard TypeIII quarters
14 WaySideStnBldgs.pdf Drg Wayside stations
15 Controlpoints.pdf Control points
16 Curvedetails.pdf Curve details
17 gradientabstract.pdf Gradient details
18 HTndLTlinexing.pdf Powerline crossings
19 landwidth.pdf Land width
20 listofbenchmark.pdf Benchmarks
21 majorbridgelist.pdf List of Major Bridges
22 Minorbridgelist.pdf List of Minor bridges
23 ROBlist.pdf List of ROBs
24 RUBlist.pdf List of RUBs
25 ESPPhamphunicmprsd_1.pdf Yard plan Phampuni
26 ESPBoiparigudacmprsd.pdf Yard plan Boipariguda
27 ESPTanginigudacmprsd.pdf Yard plan Tanginiguda
28 BRNO-03_1.pdf GAD Majbr03
29 BRNO-10.pdf GAD Majbr10
30 BRNO-11.pdf GAD Majbr11
31 BRNO-12.pdf GAD Majbr12
32 BRNO-13_1.pdf GAD Majbr13
33 BRNO-17.pdf GAD Majbr17
34 BRNO-33.pdf GAD Majbr33
35 BRNO-36.pdf GAD Majbr36
36 BRNO-37cmprsd.pdf GAD Majbr37
37 BRNO-46.pdf GAD Majbr46
38 BRNO-49.pdf GAD Majbr49
39 BRNO-52.pdf GAD Majbr52
40 BRNO-58cmprsd.pdf GAD Majbr58
41 BRNO-67.pdf GAD Majbr67
42 BRNO-72.pdf GAD Majbr72
43 BRNO-08.pdf GAD ROB 08
44 BRNO-20.pdf GAD ROB 20
45 BRNO-24cmprsd.pdf GAD ROB 24
46 BRNO-27cmprsd.pdf GAD ROB 27
47 BRNO-62cmprsd.pdf GAD ROB 62
48 BRNO-66.pdf GAD ROB 66
49 BRNO-75cmprsd.pdf GAD ROB 75
50 BRNO-02.pdf GAD RUB 02
51 BRNO-05.pdf GAD RUB 05
52 BRNO-09.pdf GAD RUB 09
53 BRNO-14.pdf GAD RUB 14
54 BRNO-31cmprsd.pdf GAD RUB 31
55 BRNO-35cmprsd.pdf GAD RUB 35
56 BRNO-42cmprsd.pdf GAD RUB 42
57 BRNO-51cmprsd.pdf GAD RUB 51
58 BRNO-56.pdf GAD RUB 56
59 BRNO-64.pdf GAD RUB 64
60 BRNO-68cmprsd.pdf GAD RUB 68
61 BRNO-73cmprsd.pdf GAD RUB 73
62 BRNO-78.pdf GAD RUB 78
63 BRNO-01.pdf GAD Minor 01
64 BRNO-04cmprsd.pdf GAD Minor 04
65 BRNO-06cmprsd.pdf GAD Minor Br06
66 BRNO-07.pdf GAD Minor Br07
67 BRNO-15.pdf GAD Minor Br15
68 BRNO-16.pdf GAD Minor Br16
69 BRNO-18.pdf GAD Minor Br18
70 BRNO-19.pdf GAD Minor Br19
71 BRNO-21cmprsd.pdf GAD Minor BR21
72 BRNO-22cmprsd.pdf GAD Minor Br22
73 BRNO-25cmprsd.pdf GAD Minor Br23
74 BRNO-26cmprsd.pdf GAD Minor Br26
75 BRNO-28.pdf GAD Minor Br28
76 BRNO-29cmprsd.pdf GAD Minor Br29
77 BRNO-30.pdf GAD Minor Br30
78 BRNO-32cmprsd.pdf GAD Minor Br32
79 BRNO-34cmprsd.pdf GAD Minor Br34
80 BRNO-38cmprsd.pdf GAD Minor Br38
81 BRNO-39.pdf GAD Minor Br39
82 BRNO-40cmprsd.pdf GAD Minor Br40
83 BRNO-41cmprsd.pdf GAD Minor Br41
84 BRNO-43cmprsd_1.pdf GAD Minor Br43
85 BRNO-44_1.pdf GAD Minor Br44
86 BRNO-45cmprsd.pdf GAD Minor br45
87 BRNO-48.pdf GAD Minor Br48
88 BRNO-50cmprsd.pdf GAD Minor Br50
89 BRNO-53.pdf GAD Minor Br53
90 BRNO-54.pdf GAD Minor Br54
91 BRNO-55cmprsd.pdf GAD Minor Br55
92 BRNO-57cmprsd.pdf GAD Minor Br57
93 BRNO-59.pdf GAD Minor Br59
94 BRNO-60cmprsd.pdf GAD Minor Br60
95 BRNO-61.pdf GAD Minor Br61
96 BRNO-63cmprsd.pdf GAD Minor br63
97 BRNO-65.pdf GAD Minor Br65
98 BRNO-69.pdf GAD Minor Br69
99 BRNO-70.pdf GAD Minor Br70
100 BRNO-71.pdf GAD Minor Br71
101 BRNO-74.pdf GAD Minor Br74
102 BRNO-76.pdf GAD Minor Br76
103 BRNO-77.pdf GAD Minor Br77
104 BRNO-79.pdf GAD Minor Br79
105 BRNO-81.pdf GAD Minor Br81
106 BRNO-82.pdf GAD Minor Br82
107 BRNO-83.pdf GAD Minor Br83
108 BRNO-87.pdf GAD Minor Br87
109 BRNO-88.pdf GAD Minor Br88
110 BRNO-89.pdf GAD Minor Br89
111 BRNO-90-Layout3.pdf GAD Minor Br90
112 BRNO-91.pdf GAD Minor Br91
113 BRNO-92.pdf GAD Minor Br92
114 BRNO-93.pdf GAD Minor Br93
115 BRNO-94.pdf GAD Minor br94
116 BRNO-96.pdf GAD Minor Br96
117 BRNO-97.pdf GAD Minor Br97
118 BR-98RUB.pdf GAD Minor Br98
119 BR-99new.pdf GAD Minor Br99
120 BRNO-100.pdf GAD Minor Br100
121 BRNO-101.pdf GAD Minor Br101
122 BRNO-102.pdf GAD Minor Br102
123 BRNO-104.pdf GAD Minor Br104
124 BRNO-105.pdf GAD Minor Br105
125 BRNO-106.pdf GAD Minor br106
126 BRNO-107.pdf GAD Minor Br107
127 BRMajor-3_CH.193.pdf Geotechnical investigation Maj Br03
128 BRMajor-10_Ch04-115Km.pdf Geotechnical investigation Maj Br10
129 BRMajor-11_Ch04-250Km.pdf Geotechnical investigation Maj Br11
130 BRMajor-12_Ch04-680Km.pdf Geotechnical investigation Maj Br12
131 BRMajor-13_Ch04-810Km.pdf Geotechnical investigation Maj Br13
132 BRMajor-17_ChKm.5.755Km.pdf Geotechnical investigation Maj Br17
133 BRMajor-36Report-Ch-1-3080Km.pdf Geotechnical investigation Maj Br36
134 BRMajor-49_Report-Ch19-345Km.pdf Geotechnical investigation Maj Br49
135 BRMajor-52_Report-Ch20-440Km.pdf Geotechnical investigation Maj Br52
136 BRMajor-58_Report-Ch23-115Km.pdf Geotechnical investigation Maj Br58
137 BRMajor-67Report-Ch27-735Km.pdf Geotechnical investigation Maj Br67
138 BRMajor-72Report-Ch29-725Km.pdf Geotechnical investigation Maj Br72
139 BRROB-08Report-Ch-3.270Km.pdf Geotechnical investigation ROB08
140 BRROB_20Report-Ch-7.015Km.pdf Geotechnical investigation ROB20
141 BRROB_24Report-Ch-8.585Km.pdf Geotechnical investigation ROB24
142 BRROB_27Report-Ch-9-265Km.pdf Geotechnical investigation ROB27
143 BRROB-62Report-Ch2-5855Km.pdf Geotechnical investigation Maj Br62
144 BRROB-66Report-Ch2-7190Km.pdf Geotechnical investigation ROB66
145 BRROB-75Report-Ch-31055Km.pdf Geotechnical investigation Maj Br75
146 BRRUB-64Report-CH2-6480Km.pdf Geotechnical investigation RUB64
147 BRNo.95.pdf Geotechnical investigation Maj Br95
148 BRNo.80.pdf Geotechnical investigation ROB80
149 BRNo.84.pdf Geotechnical investigation ROB84
150 BRNo.85.pdf Geotechnical investigation ROB85
151 BRNo.86.pdf Geotechnical investigation ROB86
152 BRNo.103.pdf Geotechnical investigation ROB103
153 Part-1of3TrialPitJeyPpore_00.00to15.00km.pdf Geo Invest Min Br Km 0 to 15 Pt1
154 Part-2of3TrialPitJeyPpore_00.00to15.00km.pdf Geo Invest Min Br Km 0 to 15 Pt2
155 Part-3of3TrialPitJeyPpore_00.00to15.00km.pdf Geo Invest Min Br Km 0 to 15 Pt3
156 TrialPitJeyppore_15.00to30.00km.pdf Geo Invest Min Br Km 15 to 33
157 JYP-MALKANGIRI40-42km.pdf L Section Km 40 to 42
158 JYP-MALKANGIRI33.45-58kmind275xplan.pdf Index plan Km 30 to 42
159 Part-1of2BRMajor-37Report-Ch-1-3610Kmpages01-47.pdf Geotech investig Maj Br37 Pt1
160 Part-2of2BRMajor-37Report-Ch-1-3610Kmpages48-80.pdf Geotech investig Maj Br37 Pt2
161 FinalEPCAgreement30.01.2024.pdf EPC Agreement
162 RFP1_1.pdf Request For Proposal
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued