|
||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||
|
Tender Details Deptt./Rly. Unit ADRA DIVISION-ENGG/SOUTH EASTERN RLY Tender No. E-DRM-Engg-ADRA-06-24 Tender Title Construction of RUB/ Subway for elimination of Manned level crossings PK-5 in between PRR-KSX Section by Cut & Cover method in Adra division. Contract Type Works Tender Type Open Advertised Value 76139719.19 Bidding Style Single Rate for Each Schedule Bidding System Single Packet System Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Tendering Section WORKS Bidding Unit Publishing Date / Time 01/02/2024 19:18 Period Of Completion 11 Months Bidding Start Date 09/02/2024 Closing Date Time 23/02/2024 15:00 Validity of Offer ( Days) 60 Are Joint Venture (JV) firms allowed to bid - Tender Doc. Cost (Rs.) 0.00 Earnest Money (Rs.) 530700.00 Description Execution of all items of works under USSOR 2021-Ver-1 related to the Construction of RCC Box with installation by cut and cover method for Subway in lieu of level crossing 2 Please see Item Breakup for details. 204137.48 5.36 215079.25 More Details Click Here To Open
Tender No: E-DRM-Engg-ADRA-06-24 Dept/Rly: ADRA DIVISION-ENGG/SOUTH EASTERN RLY Closing Date/Time: 23/02/2024 15:00 Tender Title: Construction of RUB/ Subway for elimination of Manned level ...... Tender Type: Open
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description 1 2018_CE-I_CT_9Date04_06_2018.pdf Letter of Credit condition 2 SpecialConditions_Contract_17102018.pdf Updation Labour data shramikkalyan 3 JPOcabledamage.pdf JPO Cable damage 4 ANNEXUREVIAforBIDSECURITY.pdf Annexure 5 ANNEXUREVIBforFINANCIALCRITERIA.pdf Annexure 6 GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf GCC 2022 7 GCCACS.pdf Advance Correction Slip No1 of GCC 8 ASC-2GCC-2022.pdf ACS2 2022 9 Bidsecruitydocument.pdf Document of Bid Secruity 10 ACS-03OFGCC2022.pdf Correction slip 11 2023_10_20RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_5ACS-53.pdf correction slip 5 12 2023_12_21IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_6ACS-61.pdf GCC correctio slip 6 13 CONTRACTORE-MB.pdf CONTRACTOR E MB
Corrigenda Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued.
S.No Name Date/Time Action No Corrigendum Issued