Tender Details |
Deptt./Rly. Unit | RAIPUR DIVISION-ENGINEERING/SOUTH EAST CENTRAL RLY |
Tender No. | E-R-T-81-23-24 |
Tender Title | 1) Construction of additional sump well with drainage facility at RUB 388 & 370 under the jurisdiction of ADEN/Bhatapara, 2) Balance work for improvement of RPF Barrack at Durg & 3) Construction of gangs tool cum rest room for Track maintainers under the jursidiction of Sr.DEN/I/R, 4) Civil work for procurement of CNC under floor wheel lath (BG) for SSE/C&W/Durg, through Bulk M&P Programme. |
Contract Type | Works |
Tender Type | Open |
Advertised Value | 23767973.84 |
Bidding Style | Single Rate for Each Schedule |
Bidding System | Single Packet System |
Pre-Bid Required | No |
Pre-Bid Query Date Time | Not Applicable |
Tendering Section | SR DEN 1 |
Bidding Unit | |
Publishing Date / Time | 14/02/2024 13:39 |
Period Of Completion | 12 Months |
Bidding Start Date | 22/02/2024 |
Closing Date Time | 07/03/2024 11:00 |
Validity of Offer ( Days) | 60 |
Are Joint Venture (JV) firms allowed to bid | - |
Tender Doc. Cost (Rs.) | 0.00 |
Earnest Money (Rs.) | 268800.00 |
Description | Earth work in excavation as per approved drawings and dumping at embankment site or spoil heap, within railway land, including 50m lead and 1.5m lift, the lead to be measured from the centre of gravity of excavation to centre of gravity of spoil heap: the lift to be measured from natural ground level and paid for in layers of 1.5m each, including incidental work, as per specifications-in All kinds of soils 02 011070 910.00 cum 8.62 7844.20 AT Par 7844.20 |
More Details | Click Here To Open |