Tender Details |
Deptt./Rly. Unit | STORES/TKJ/RCF |
Tender No. | 05241077 |
Tender Title | END CONSTRUCTION AND END WALL |
Contract Type | Goods |
Tender Type | Open - Indigenous |
Contract Category | Expenditure |
Evaluation Criteria | Itemwise |
Bidding System | Two Packet |
Pre-Bid Conference Required | No |
Pre-Bid Conference Date Time | Not Applicable |
Tendering Section | 05 |
Inspection Agency | TPI Agency |
Publishing Date / Time | 23/02/2024 16:02 |
Procure From Approved Sources | Yes |
Approving Agency | RCF |
Closing Date Time | 22/03/2024 14:30 |
Validity of Offer ( Days) | 90 |
Ranking Order for Bids | Lowest to Highest |
Advertised Value | |
Tender Doc. Cost (INR) | 0.00 |
Earnest Money (INR) | 1294880.00 Initial Financial Offer Required Yes Auto Elimination rules applicable For all vendors (Bulk/developmental) Initial Cooling Off Period (HH:MM) 02:00 Subsequent Cooling Off Period (HH:MM) 00:30 Succesive Lots Closing Interval (Min.) 30 Minimum Decrement (%) 0.25 Vendor Categories Bulk/Developmental Item Category General Allow Next Bid Lower Than Current Lowest Bid (Subject to Min. Decrement) |
Description | SET OF END CONSTRUCTION FOR 3 PHASE MEMU/TC MEDHA COACHES, as per Drawing: MP23END3PH VERSION 0, Packing Instruction: 1. THE SUPPLIER SHALL PACK THE END WALL IN A SUITABLY DESIGNED RETURNABLE FIXTURE IN SUCH A WAY THAT END WALL SHALL NOT GET SCRATCHED, DAMAGED, TWISTED DURING TRANSPORTATION, STORAGE AND LIFTING AND TO AVOID SCRATCHES ON OUTER SURFACE. IT SHOULD BE SEPERATED BY SUITABLE ENVIRONMENT FRIENDLY BLOCKS TO AVAOID RUBBING OF TWO ENDWALL SURFACES . IT SHOULD HAVE STANDARD CLAMPING /FASTENING MECHANISM SO THAT IT CAN BE OPENED EASILY. IT SHOULD HAVE FIRM'S IDENTIFICATION MARK. 2. FIRST RETURANABLE FIXTURE ALONG WITH END WALL BE RETAINED BY RCF & THIS FIXTURE SHALL BE EXCHANGED IN THE SECOND LOT SUPPLY AND SO ON. AT THE END OF THE CONTACT, THE FIRM SHALL COLLECT THE REMAINING RETURNABLE PACKING FIXTURE FROM RCF. 3. THE PACKING FIXTURE/FRAME TO BE FABRICATED HAVING SUFFICIENT STRENGHT TO BEAR APPROXIMATE 2 TONNE LOAD IN STATIC & MOVING CONDITION OF TWO COACH SETS OF END WALL. 4. THE FIXTURE /FRAME/PALLET SHOULD BE DESIGNED SO THAT THE PACKED END WALL PREFERABLY REMAIN IN VERTICAL POSITION TO MINIMIZE SURFACE AREA. 5. IT SHOULD ALSO BE SUITABLE FOR STORAGE OF END WALLUNDER OPEN SKY. [ Warranty Period: 30 Months after the date of delivery ] |
More Details | Click Here To Open |