Tender Details
Deptt./Rly. Unit ADRA DIVISION-S AND T/SOUTH EASTERN RLY
Tender No. SnT_e_Tender_ADA_23_24_57
Tender Title Signalling and Telecom outdoor Cable shifting work including other gears in connection with following Engineering works (i) Construction of RUB/Subway for elimination of manned LC Gates 6 nos. KA-128, KA-154, KA-104, KA-123, KA144 & SJ-4 between BQA-ADA-ASN & SNKR-JOC section of ADRA division. (ii) Construction of RUB/ Subway for elimination of Manned level crossings 1 No for JC-52 between CNI-PRR section in Adra division.
Contract Type Works
Tender Type Open
Advertised Value11313549.73
Bidding Style Single Rate for Each Schedule
Bidding System Single Packet System
Pre-Bid Required No
Pre-Bid Query Date Time Not Applicable
Tendering Section GENERAL
Bidding Unit
Publishing Date / Time 27/02/2024 11:56
Period Of Completion 10 Months
Bidding Start Date 06/03/2024
Closing Date Time20/03/2024 11:00
Validity of Offer ( Days)60
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)206600.00
DescriptionCutting the masonry wall to the depth of 0.75 M. at the entry of room, placing of flexible HDPE pipe. 02 2 1.00 Numbers 9486.66 9486.66 AT Par 9486.66
More DetailsClick Here To Open
Tender No:  SnT_e_Tender_ADA_23_24_57 Dept/Rly:  ADRA DIVISION-S AND T/SOUTH EASTERN RLY Closing Date/Time:   20/03/2024 11:00
 
Tender Title: Signalling and Telecom outdoor Cable shifting work including...... Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 IRGCC2022ACS-1.pdf IRGCC APRIL 2022-Corr Slip-1
2 IRGCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf IRGCC APRIL 2022
3 GCCApril2022ACS-3.pdf IRGCC APRIL 2022-Corr Slip-3
4 ImplementationofJPOTelcomCircularNo17-2013.pdf Implementation of JPO Telcom Circular No 17-2013
5 IRGCC-April-2022-AdvanceCorrectionSlipno-2.pdf IRGCC APRIL 2022-Corr Slip-2
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued