Tender Details
Deptt./Rly. Unit RAIPUR DIVISION-GATI SHAKTI/SOUTH EAST CENTRAL RLY
Tender No. DyCE-GSU-R-T-19-23-24
Tender Title Major upgradation of Durg Railway Station of SECR on Engineering, Procurement and Construction (EPC) mode.
Contract Type Works
Tender Type Open
Advertised Value3699015962.00
Bidding Style Single Rate for Each Schedule
Bidding System Two Packet System
Pre-Bid Required Yes
Pre-Bid Query Date Time 03/04/2024 11:00 2nd Pre-Bid Conference Required No 2nd Pre-Bid Conference Date Time Not Applicable
Tendering Section GSU/WORKS
Bidding Unit
Publishing Date / Time 02/03/2024 19:22
Period Of Completion 36 Months
Bidding Start Date 26/04/2024
Closing Date Time10/05/2024 11:00
Validity of Offer ( Days)120
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)18495100.00
Description- Major upgradation of Durg Railway Station of SECR.
More DetailsClick Here To Open
Tender No:  DyCE-GSU-R-T-19-23-24 Dept/Rly:  RAIPUR DIVISION-GATI SHAKTI/SOUTH EAST CENTRAL RLY Closing Date/Time:   10/05/2024 11:00
 
Tender Title: Major upgradation of Durg Railway Station of SECR on Enginee...... Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 14ARCIRCULATIONPLANNORTHEAST2NDENTRYGROUNDFLOORANDFIRSTFLOORDURG_V2_APPROVE_P23.pdf 14 AR CIRCU PL N E 2ND EN G F And F
2 22ARStationbuildingSW_ServiceRetiringfloorplanDurg_V3_APPROVE_P29.pdf 22 AR Station building SW S And R
3 23ARStationbuildingSW_TerracefloorplanDurg_V3_APPROVE_P29_.pdf 23 AR Station building SW T F P Dur
4 32ARRooflevelplanDurg_V2_APPROVE_P27.pdf 32 AR Roof level plan Durg
5 33ARConcourseSECTIONANDELEVATION_V3_APPROVE_P23_.pdf 33 AR Concourse S AND E
6 39ARType3_GroundFloorPlan_V2_APPROVE_P23.pdf 39 AR Type 3 G F Plan
7 40ARType3_TerracelFloorPlan_V2_APPROVE_P24.pdf 40 AR Type 3 T F Plan
8 42ARType4_GroundFloorPlan_V2_APPROVE_P24.pdf 42 AR Type 4 G F Plan
9 43ARType4_TerracelFloorPlanDurg_V2_APPROVE_P25.pdf 43 AR Type 4 T F Plan Durg
10 44ARTYPE-4ELEVATIONANDSECTIONS_V2_APPROVE_P23.pdf 44 AR TYPE 4 ELEVATION AND SECTIONS
11 45ARType5_GroundFloorPlanDurg_V2_APPROVE_P25.pdf 45 AR Type 5 Ground Floor Plan Durg
12 46ARType5_TerracelFloorPlanDurg_V2_APPROVE_P25.pdf 46 AR Type 5 Terracel Floor Plan Du
13 47ARTYPE-5SECTIONANDELEVATIONDURG_V1_APPROVE_P22.pdf 47 AR TYPE 5 SECTION AND ELEVATION
14 48ARParcelPOSTOFFICEALLFLOORPLAN_V3_APPROVE_P25.pdf 48 AR Parcel POST OFFICE ALL FLOOR
15 49ARParcelbuildingSECTIONANDELEVATION_V2_APPROVE_P16.pdf 49 AR Parcel building SECTION AND E
16 51AR184_IS_01_TD_03iP01b_RPFBarracksFemale_V2_APPROVE_P14.pdf 51 RPF Barracks Female
17 52AR184_IS_01_TD_03iP02_RPFPost_APPROVE_P12.pdf 52 AR 184 IS 01 TD 03iP02 RPF Post
18 53ARRPFBarracksMALESECTIONANDELEVATION_V1_APPROVE_P23.pdf 53 AR RPF Barracks MALE S AND E
19 54ARRPFBarracksFEMALESECTIONELEVATION_V2_APPROVE_P23.pdf 54 AR RPF Barracks FEMALE S AND E
20 55ARRPFPostSECTIONANDELEVATIONDurg_V1_APPROVE_P21.pdf 55 AR RPF Post S AND E Durg
21 56ARReserveloungeDurg_V4_APPROVE_P31.pdf 56 AR Reserve lounge Durg
22 57ARReserveloungeSECTIONANDELEVATIONDDURG_V2_APPROVE_P23.pdf 57 AR Reserve lounge S AND E DURG
23 65AR184_IS_01_TD_03mD02a_StationBuilding_Southwest_ReferenceImage_of_Furniture_V1_APPROVE_P7_.pdf 65 Station Building South west Refe
24 66AR184_IS_01_TD_03mD02b_StationBuilding_NorthEast_ReferenceImage_of_Furniture_V1_APPROVE_P7_.pdf 66 Station Building North East R oF
25 106PL184_IS_01_TD_PL_04eP01_TypeIII_GroundFloorPlan_PlumbingLayout_APPROVE_P5_.pdf 106 PL Type III Ground F P Plumbing
26 107PL184_IS_01_TD_PL_04eP02_TypeIII_Terracefloorplan_Plumbinglayout_APPROVE_P5_.pdf 107 PL TD PL Type III Terrace Fr Pn
27 108PL184_IS_01_TD_PL_04fP01_TypeIV_GroundFloorPlan_PlumbingLayout_APPROVE_P5_.pdf 108 PL 184 TD IV G F Plan Pg L
28 109PL184_IS_01_TD_PL_04fP02_TypeIV_TerraceFloorPlan_PlumbingLayout_APPROVE_P5_.pdf 109 PL Type IV T F P Plumbing Layo
29 110PL184_IS_01_TD_PL_04gP01_TYPEV_GroundFloorPlan_PlumbingLayout_APPROVE_P5_.pdf 110 PL TD PL TYPE V G F Plan
30 111PL184_IS_01_TD_PL_04gP02_TYPEV_TerraceFloorPlan_PlumbingLayout_APPROVE_P5_.pdf 111 PL TD PL TYPE V T F P Plumbing
31 114PLRPFBarracksFemaleGroundfirstTerracefloorplansPlumbinglayout_APPROVE_P5_.pdf 114 PL RPF B Female G first AND Ter
32 115PL184_IS_01_TD_PL_04iP03_RPFPost_Allfloorplans_PlumbingLayout_APPROVE_P5_.pdf 115 PL RPF Post All F P Plumbing La
33 138FF184_IS_01_TD_FF_06fP01_TypeIII_Groundfloorplan_Firefightinglayout_APPROVE_P5.pdf 138 FF TD FF Type III G f plan Fire
34 139FF184_IS_01_TD_FF_06fP02_TypeIII_Terracefloorplan_Firefightinglayout_APPROVE_P5.pdf 139 FF TD FF Type III Ter flo Pn Fi
35 140FF184_IS_01_TD_FF_06gP01_TypeIV_Groundfloorplan_Firefightinglayout_APPROVE_P51.pdf 140 FF TDType IV G F P Firefightin
36 141FF184_IS_01_TD_FF_06gP02_TypeIV_Terracefloorplan_Firefightinglayout_APPROVE_P5.pdf 141 FF Terrace floor plan Fire layo
37 172STStationBuildingSouthWest_GroundFloorFirstFloorPlan_StructureDrawing_APPROVE_P4.pdf 172 ST Sta Buil South West Gro Flo
38 173STStationBuildingSouthWest_ConcourseServiceFloorPlan_StructureDrawing_APPROVE_P4.pdf 173 ST Sta Buil Sou Wes Con And Ser
39 174STStationBuildingSouthWest_RetiringTerraceFloorPlan_StructureDrawing_APPROVE_P4.pdf 174 ST Sta Bui S W Reti And Terr Fl
40 12AR184_IS_01_TD_02L03aiCirculationPlan_SWfrontentry_GroundFirstfloorplan_APPROVE_P12_compressed_compressed1_11zon2.pdf 12 AR Circu Plan SW fro ent Gro And
41 24ARStationBuilding_SouthWest_SectionsDURG_V2_APPROVE_P23.pdf 24 AR Stat Buil Sout Wes Sect DURG
42 25ARStationBuilding_Southwest_elevation-Front_V3_APPROVE_P25.pdf 25 AR Stat Buil Sou west ele Fron
43 28AR184_IS_01_TD_03bS01_StationBuilding_NorthEastRearEntry_Section_V2_APPROVE_P16.pdf 28 AR Sta Bui Nor East Rear Ent Sec
44 29AR184_IS_01_TD_03bE01_StationBuilding_NorthEastRearEntry_Elevation_V3_APPROVE_P16.pdf 29 AR Stat Buil Nor East Rea Entr E
45 41ARTYPE-3SECTIONELEVATION_V2_APPROVE_P23.pdf 41 AR TYPE 3 SEC And ELE
46 67ARConcourselvlPlatformlevel_ReferenceImage_of_Furniture_Layout1_APPROVE_P5.pdf 67 AR Conc lvl Plat level Refer of
47 68ARParcelPostOffice_ReferenceImage_of_Furniture_APPROVE_P5.pdf 68 AR Parc And Post Offi Refer of F
48 69AR184_IS_01_TD_03mD02e_RPFBarracksRPFPost_ReferenceImage_of_Furniture_APPROVE_P6.pdf 69 AR RPF Barr And RPF Post Ref Fur
49 72AR184_IS_01_TD_03mD03a_InteriorViews_APPROVE_P12_compressed.pdf 72 AR TD Interior Views
50 74AR184_IS_01_TD_03mD03d_3dViews_Stationbuildingconcourse_APPROVE_P5_compressed.pdf 74 AR TD Vie Stat buil And con
51 86AR184_IS_01_TD_03nD01_Busstop_Plananddetail_APPROVE_P12.pdf 86 AR Bus stop Plan and deta
52 151ELSubstation_Drawing_NorthSideRear_V1_APPROVE_P6.pdf 151 EL Sub Drawi North Side Rear
53 26ARStationbuildingNE_GroundfirstfloorplanDurg_V3_APPROVE_P29_compressed.pdf 26 AR Stat buil NE Gro And firs flo
54 34AR184_IS_01_TD_03dP01_TypeII_Stiltfloorplan_V1_APPROVE_P14.pdf 34 AR Type Stilt floor plan
55 35ARType2_TypicalFloorPlan_V4_APPROVE_P26_compressed.pdf 35 AR Type 2 Typical Floor Plan
56 36ARType2_TerracelFloorPlan_V4_APPROVE_P27.pdf 36 AR Type Terra Flo Plan
57 37ARTYPE-2SECTION_V3_APPROVE_P23_compressed.pdf 37 AR TYPE 2 SECTION
58 38ARTYPE-2ELEVATIONDURG_V2_APPROVE_P23.pdf 38 AR TYPE 2 ELEVATION DURG
59 50ARRPFBarracksmaleallfloorplansDurg_V2_APPROVE_P27.pdf 50 AR RPF Barr male all flo pla Dur
60 88AR184_IS_01_TD_03rP01_CrewLobby_AllFloorPlan_V1_APPROVE_P11.pdf 88 AR Crew Lobby All Flo Plan
61 144FFRPFBarracksFemaleGroundFirstTerracefloorplansFirefightinglayout_APPROVE_P5_compressed.pdf 144 FF RPF Barr Fem Grou First And
62 20ARStationbuildingSW_GroundfirstfloorplanDurg_V3_APPROVE_P29_compressed.pdf 20 AR STN BLDG SW GRD AND 1ST FLR p
63 113PL184_IS_01_TD_PL_04iP03_RPFPost_Allfloorplans_PlumbingLayout_APPROVE_P5_compressed.pdf 113 PL RPF Post All floor plans Plu
64 145FF184_IS_01_TD_FF_06jP03_RPFPost_Allfloorplans_Firefightinglayout_APPROVE_P5.pdf 145 FF RPF Post All floor plans Fi
65 SignageGuidelinesforRailwayStations.pdf Signage Guidelines for Railway Stat
66 MASTERPLANOFDURG_1.pdf MASTER PLAN OF DURG
67 71AR184_IS_01_TD_03mD02g_Street_furniture_APPROVE_P5.pdf 71 AR Street furniture
68 104PL184_IS_01_TD_PL_04eP02_TypeII_Typicalfloorplan_Plumbinglayout_APPROVE_P5_compressed.pdf 104 PL Type Tycal flr plan Plbing l
69 135FF184_IS_01_TD_FF_06eP01_TypeII_Stiltfloorplan_Firefightinglayout_APPROVE_P5_compressed.pdf 135 FF Stilt flr plan Fiefihting la
70 136FF184_IS_01_TD_FF_06eP02_TypeII_Typicalfloorplan_Firefightinglayout_APPROVE_P5.pdf 136 FF Typcal flr plan Firfighting
71 137FF184_IS_01_TD_FF_06eP03_TypeII_Terracefloorplan_Firefightinglayout_APPROVE_P5_compressed.pdf 137 FF Terace flr plan Fireghting l
72 179ST184_IS_01_TD_ST_08dP01_TypeII_StiltFloorPlan_StructureDrawing_APPROVE_P4.pdf 179 ST Stilt Flr Plan Struture Dwg
73 181ST184_IS_01_TD_ST_08dP02_TypeII_TypicalFloorPlan_StructureDrawing_APPROVE_P4.pdf 181 ST Typcal Flr Plan Struture Dwg
74 182ST184_IS_01_TD_ST_08dP03_TypeII_TerraceFloorPlan_StructureDrawing_APPROVE_P4.pdf 182 ST Terace Flr Plan Strture Dwg
75 183ST184_IS_01_TD_ST_08eP01_TypeIII_GroundFloorPlan_StructureDrawing_APPROVE_P4.pdf 183 ST Grnd Flr Plan Strcture Dwg
76 184ST184_IS_01_TD_ST_08eP02_TypeIII_TerraceFloorPlan_StructureDrawing_APPROVE_P4.pdf 184 ST Terrace Flr Plan Strture Dwg
77 185ST184_IS_01_TD_ST_08fP01_TypeIV_GroundFloorPlan_StructureDrawing_APPROVE_P4.pdf 185 ST Ground Floor Plan Stcture Dw
78 186ST184_IS_01_TD_ST_08fP02_TypeIV_TerraceFloorPlan_StructureDrawing_APPROVE_P4.pdf 186 ST Terrace Floor Plan Strture D
79 187ST184_IS_01_TD_ST_08gP01_TypeV_GroundFloorPlan_StructureDrawing_APPROVE_P4.pdf 187 ST Grnd Flr Plan Strture Dwg
80 190ST184_IS_01_TD_ST_08iP01_RPFBarracksmale_AllFloorPlan_StructureDrawing_APPROVE_P4.pdf 190 RPF Barcks male All Flr Plan St
81 191ST184_IS_01_TD_ST_08iP02_RPFBarracksfemale_AllFloorPlan_StructureDrawing_APPROVE_P4.pdf 191 ST RPF Bracks fmle All Flr Pln
82 SoilInvestigationReportofDurgStation.pdf Soil Investigation Report of Durg S
83 03lAR184_IS_01_TD_01L01_Surveyplan_APPROVE_P11_1.pdf 03 AR 184 Survey plan
84 82AR3dViews_SSEElecG_SSEWorksofficeSSEPway_APPROVE_P11.pdf 82 AR Views SSE ElecG SSE Works of
85 85AR184_IS_01_TD_03mD05_3dViews_FacadeLightingSchemes_V1_APPROVE_P7.pdf 85 AR Views Facad Lhng Shm
86 91AR184_IS_01_TD_03sS01_SSEPway_Sectionelevation_APPROVE_P11.pdf 91 AR 184 Pway Section and elevatio
87 93AR184_IS_01_TD_03tS01_SSE_Works__SSEElectricG_SectionElevation_APPROVE_P11.pdf 93 AR SSE Works and SSEE lectricG a
88 122HVACStationBuildingSouthWestFrontEntry_ConcoursefloorPlans_HVAClayout_V2_APPROVE_P10.pdf 122 HVAC Stn Bldng S West Front Ent
89 127HVACReserveLounge_Allfloorplans_HVAClayout_APPROVE_P6.pdf 127 HVAC Rev Lo All flor plans HVAC
90 130SSE_Works__SSEElectricG_AllFloorPlan-HVAC_APPROVE_P6.pdf 130 SSE Works and SSE ElectricG All
91 134FFStationBuildingSouthWest_RetiringTerracefloorplan_Firefightinglayout_APPROVE_P6.pdf 134 FF Stn Bdng S West Retiring and
92 136FFStationBuildingNorthEast_Concourseterracefloorplan_Firefightinglayout_APPROVE_P5.pdf 136 FF Stn Blng North East Conco an
93 137FF184_IS_01_TD_FF_06dP01_Concourse_level_plan_Firefightinglayout_APPROVE_P5.pdf 137 FF Concourse level plan Firefi
94 154StationBuildingSouthWestFrontEntry_GroundFirstfloorPlans_Electricallayout_APPROVE_P4.pdf 154 Stn Bldg S West Front Entry Gr
95 155ELStationBuildingSouthWest_GroundFirstfloorPlans_Informationsystem_APPROVE_P6.pdf 155 EL Stn Bldg S West G and F floo
96 157ELStationBuildingSouthWestConcoursefloorPlans_Informationsystem_V2_APPROVE_P10.pdf 157 EL Stn Bldg S West Concourse f
97 159ELStationBuildingSouthWest_ServiceretiringfloorPlans_Informationsystem_APPROVE_P6.pdf 159 EL Stn Bldg S West Service and
98 160ELStationBuildingNortheastRearEntry_GroundFirstfloorPlans_Electricallayout_APPROVE_P4.pdf 160 EL Stn Bldg N East Rear Entry G
99 160ELStationBuildingSouthWest_Concoursefloorplan_Electrical_APPROVE_P4.pdf 160 EL Stn Blng S West Con flor pla
100 161ELStationBuildingNortheastGroundFirstfloorPlans_Informationsystem_APPROVE_P6.pdf 161 EL Stn Bldg N east G and F floo
101 169EL184_IS_01_TD_EL_07jP01a_RPFBarracksMale_Allfloorplans_Informationsystemlayout_APPROVE_P7.pdf 169 EL Baracks Male All floor plans
102 170ELRPFBarracksFemale_Allfloorplans_Electricallayout_APPROVE_P4.pdf 170 EL RPF Baracks Femal Al flor pl
103 171ELRPFBarracksFemale_Allfloorplans_Informationsystemlayout_APPROVE_P7.pdf 171 EL RPF Barks Female All flor pl
104 172EL184_IS_01_TD_EL_07jP03_RPFPost_Allfloorplans_Electricallayout_APPROVE_P4.pdf 172 EL 184 RPF Post All floor plans
105 177EL184_IS_01_TD_EL_07mP01a_CrewLobby_Allfloorplans_Informationsystemlayout_APPROVE_P7.pdf 177 EL 184 TD Crew Loby Al flor pl
106 178ELSSE_Works__SSEElectricG_Allfloorplans_Electricallayout_APPROVE_P4.pdf 178 EL SSE Works and SSE EletricG A
107 181EL184_IS_01_TD_EL_07nP01a_SSEPwayoffice_Allfloorplans_Informationsystemlayout_APPROVE_P7.pdf 181 EL 184 SSE Pway offce Al flor p
108 84AR184_IS_01_TD_03mD04b_StationBuilding_NorthEast_ExclusiveArtwork_APPROVE_P7.pdf 84 AR 184 Stn Bldg North East Exclu
109 81AR184_IS_01_TD_03mD03j_3dViews_CrewLobby_APPROVE_P11.pdf 81 AR 184 Views Crew Loby
110 79AR184_IS_01_TD_03mD03h_3dViews_PublicToilet_APPROVE_P11.pdf 79 AR 184 TD View Pblc Tolet
111 75AR184_IS_01_TD_03mD03d_3dViews_ResidentialBuildings_APPROVE_P12.pdf 75 AR 184 Views Rdial Bdng
112 73184_IS_01_TD_03mD03b_3dViews_StationfrontrearBuildingarialviews_V1_APPROVE_P14.pdf 73 184 views Stn frt a rear Bdng ar
113 05AR184_IS_01_TD_01L02a_Superimposeplan_V2_APPROVE_P15.pdf 05 AR 184 Superimpose plan
114 59AR184_IS_01_TD_03kP02_Arrival_FOB02_APPROVE_P8_1.pdf 59 AR 184 TD Arrival FOB
115 60AR184_IS_01_TD_03kP03_Arrival_FOB03_APPROVE_P8_1.pdf 60 AR 184 TD
116 62AR184_IS_01_TD_03mD01b_Typicalsheddetail_APPROVE_P8.pdf 62 AR 184 TD
117 78AR184_IS_01_TD_03mD03g_3dViews_AncillaryBuildingReserveLounge_APPROVE_P8.pdf 78 AR 184 TD Ancillary Building Res
118 80AR184_IS_01_TD_03mD03i_3dViews_BusStop_APPROVE_P8.pdf 80 AR 184 TD 3dViews Bus Stop
119 94PL184_IS_01_TD_PL_04aL01_Masterplan_Externaldrainagelayout_APPROVE_P5.pdf 94 PL 184 TD PL Master plan Externa
120 117PL184_IS_01_TD_PL_04dP01_Concourse_level_plan_Plumbinglayout_APPROVE_P5.pdf 117 PL 184 TD PL Concourse level pl
121 123HVACStationBuildingSW_ServiceRetiringfloorPlans_HVAClayout_APPROVE_P6.pdf 123 HVAC Stn Bldg SW Service and Re
122 131FF184_IS_01_TD_FF_06aP01Siteplan_firefightinglayout_APPROVE_P5.pdf 131 FF 184 TD FF Siteplan firefight
123 133FFStationBuildingSouthWest_ConcourseServicefloorplan_Firefightinglayout_V2_APPROVE_P7.pdf 133 FFStation Bldg South West Con a
124 158ELStationBuildingSW_ServiceretiringfloorPlans_Electricallayout_APPROVE_P4.pdf 158 EL Station Building SW Service
125 166ELParcelPostOffice_Allfloorplans_Electricallayout_APPROVE_P4.pdf 166 EL Parcel Post Office All floor
126 174ELReserveLounge_groundfloorplan_Electricallayout_APPROVE_P4.pdf 174 EL Reserve Lounge ground floor
127 214184_IS_01_TD_MA_11aP01_Platformplans_Pressurisedmistingsystem_APPROVE_P7.pdf 214 184 TD MA Platform plans Pressu
128 GuidlinesforProcurmentofTMTsteel.pdf Guidlines for Procurment of TMT ste
129 2EPCAgreementDurgStation02.03.24.pdf EPC Agreement Durg Station
130 SCHEDULEA-P02.03.24_compressed.pdf SCHEDULE A to P ex D
131 03-ScheduleDA02.03.24.pdf Schedule DA
132 04-SheduleDB02.03.24.pdf Schedule DB
133 83AR184_IS_01_TD_03mD04a_StationBuilding_SouthWest_ExclisiveArtwork_APPROVE_P7.pdf 83 AR Stn Bldg South West Exclis A
134 89AR184_IS_01_TD_03rS01_CrewLobby_Sectionselevations_APPROVE_P11.pdf 89 AR Crew Loby Section elevation
135 90AR184_IS_01_TD_03sP01_SSEPway_GroundFloorPlans_V1_APPROVE_P11.pdf 90 AR SSE Pway Ground Floor Plans
136 92AR184_IS_01_TD_03tP01_SSE_Works__SSEElectricG_AllFloorPlan_V2_APPROVE_P14.pdf 92 AR SSE Works and SSE ElectricbG
137 95AR184_IS_01_TD_PL_04aL02_Masterplan_Watersupplylayout_V1_APPROVE_P7.pdf 95 AR Master plan Water suply layou
138 103PL184_IS_01_TD_PL_04eP01_TypeII_Stiltfloorplan_Plumbinglayout_APPROVE_P5.pdf 103 PL TD PL Type II Stilt floor pl
139 105PL184_IS_01_TD_PL_04eP03_TypeII_Terracefloorplan_Plumbinglayout_APPROVE_P7.pdf 105 PL Type II Terrace floor plan P
140 113PL184_IS_01_TD_PL_04jP01_RPFBarracksMale_Allfloorplans_PlumbingLayout_APPROVE_P5.pdf 113 PL 184 RPF Barracks Male All fl
141 116PL184_IS_01_TD_PL_04kP01_Reservelounge_AllfloorPlans_PlumbingLayout_APPROVE_P5.pdf 116 PL 184 Reserve lounge All flor
142 118PL184_IS_01_TD_PL_04mP01_CrewLobby_AllFloorPlan_PlumbingLayout_APPROVE_P7.pdf 118 PL 184 Crew Loby All Flor Plan
143 120PL184_IS_01_TD_PL_04nP01_SSEPwayOffice_AllFloorPlans_PlumbingLayout_APPROVE_P7.pdf 120 PL 184SSE Pway Office All Floor
144 128HVACCrewLobby_AllFloorPlan_HVAClayout_V1_APPROVE_P8.pdf 128 HVAC Crew Lobby All Floor Plan
145 146FFRPFBarracksMale_Allfloorplans_FirefightingLayout_APPROVE_P5.pdf 146 FF RPF Barracks Male All floor
146 148FF184_IS_01_TD_FF_06jP03_RPFPost_Allfloorplans_Firefightinglayout_APPROVE_P5.pdf 148 FF 184 RPF Post All floor plans
147 149FF184_IS_01_TD_FF_06kP01_ReserveloungeDurg_Allfloorplans_FirefightingLayout_APPROVE_P5.pdf 149 FF 184 TD FF Reserve lounge Dur
148 150184_IS_01_TD_FF_06mP01_CrewLobby_AllFloorPlan_FirefightingLayout_APPROVE_P5.pdf 150 184 FF Crew Lobby All Floor Pl
149 151FFSSE_Works__SSEElectricG_AllFloorPlan_Firefightinglayout_APPROVE_P5.pdf 151 FF SSE Works and SSEElectricG A
150 05-ScheduleDC02.03.24_1.pdf Schedule DC
151 1RFPDocumentDurgVol102.03.24_1.pdf RFP Document Durg Vol 1
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued