Tender Details
Deptt./Rly. Unit C-WORKSHOP-JU-ENGINEERING/NORTH WESTERN RLY
Tender No. WS-09of2023-24
Tender Title "Augmentation of flooring of wheel shop, Lifting Shop, Bogie Shop, SBHT Shop, Roller Bearing Shop and other allied civil works and Construction of one room for IT Center in connection with Computerization of Workshop and section in Carriage Workshop Jodhpur
Contract Type Works
Tender Type Open
Advertised Value23331690.15
Bidding Style Single Rate for Each Schedule
Bidding System Single Packet System
Pre-Bid Required No
Pre-Bid Query Date Time Not Applicable
Tendering Section XEN/WS
Bidding Unit
Publishing Date / Time 04/03/2024 13:05
Period Of Completion 9 Months
Bidding Start Date 12/03/2024
Closing Date Time26/03/2024 11:30
Validity of Offer ( Days)60
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)266700.00
Description- Carriage of material by mechanicals transport including loading unloading and stacking lime, moorum, building rubbish(10 KM 217.16+5x15.48) 2 2.6.1 238.00 cum 205.45 48897.10 (-) 38.00 30316.20 Description:- EARTH WORK // Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in...
More DetailsClick Here To Open
Tender No:  WS-09of2023-24 Dept/Rly:  C-WORKSHOP-JU-ENGINEERING/NORTH WESTERN RLY Closing Date/Time:   26/03/2024 11:30
 
Tender Title: "Augmentation of flooring of wheel shop, Lifting Shop, ...... Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 GCC_April-2022.pdf GCC April 2022
2 TENDERDOCUMENTSWITHSPECIALCONDITIONS.pdf Tender Document
3 AdvanceCorrectionSlipNo_1I.R.StandardGeneralConditionsofContractApril-2022videRBletterNo.2022-CE-I_CT_GCC-2022Policy14_07_2022.pdf Correction Slip 1
4 AdvanceCorrectionSlipNo_2I.R.StandardGeneralConditionsofContractApril-2022RBvideletterNo.2022-CE-1-CT-GCC-2022-POLICY_13.12.2022.pdf Correction Slip 2
5 AdvanceCorrectionSlipNo_3ACS-311I.R.StandardGeneralConditionsofContractApril-2022videRBletterNo.CE_CE-I-CTDated2023_04_26.pdf Correction Slip 3
6 AdvanceCorrectionSlipNo_4ACS-4.pdf Correction Slip 4
7 AdvanceCorrectionSlipNo_5ACS-53.pdf Correction Slip 5
8 ACSNO.6GCCAPRIL-2022.pdf Correction Slip 6
9 InstructionsfordiggingworkclosetoRailwaySTorElectricCables.pdf Digging
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued