Tender Details
Deptt./Rly. Unit LUCKNOW NR DIVISION-ELECTRICAL/NORTHERN RLY
Tender No. TRD-4-SrDEE-LKO-24
Tender Title OHE modification work due to construction of limited height subway (LHS) (i) at loc 147/18A- 147/18 for free passage between W-type residence/Hostel & Academic campus of Motilal Nehru NIT Allahabad by Box pushing under railway track on PFM-PRG section (ii) near ROB at KM 81.234 in lieu of LC No. 148A/2T at Rly Km 993/11-12 (between Rupamau-Raebareli Railway Stations) on Varanasi-Pratapgarh-Lucknow section of Northern Railway of Lucknow Division.
Contract Type Works
Tender Type Open
Advertised Value2397626.51
Bidding Style [ Decision at Schedule level ]
Bidding System Single Packet System
Pre-Bid Required No
Pre-Bid Query Date Time Not Applicable
Tendering Section TRD
Bidding Unit
Publishing Date / Time 05/03/2024 16:18
Period Of Completion 6 Months
Bidding Start Date 13/03/2024
Closing Date Time27/03/2024 15:00
Validity of Offer ( Days)60
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)48000.00
DescriptionSUPPLY ITEMS (Item-wise explanatory note/technical specification is given Part-1 chapter-IV (Explanatory notes) of attached tender document) 2 Please see Item Breakup for details. 55282.00 126.52 125224.79
More DetailsClick Here To Open
Tender No:  TRD-4-SrDEE-LKO-24 Dept/Rly:  LUCKNOW NR DIVISION-ELECTRICAL/NORTHERN RLY Closing Date/Time:   27/03/2024 15:00
 
Tender Title: OHE modification work due to construction of limited height ...... Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 GCC-2022.pdf GCC 2022
2 GCC2022ACS_1compressed.pdf GCC ACS 1
3 ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.2022.pdf GCC ACS 2
4 GCCACS3.pdf GCC ACS 3
5 GCCACS4.pdf GCC ACS 4
6 ACS5GCC2022dtd.20.10.2023.pdf GCC ACS 5
7 tenderdocforOHEmodificationworkatMNITLHSandRPMRBL.pdf Tender Document
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued