Deptt./Rly. Unit SCR-CONST-HQ-ENGG/SOUTH CENTRAL RLY
Tender No. EPC-15-CAO-C-SC-2024
Tender Title SCR Construction Organization: Engineering Procurement Construction (EPC) contract in connection with Doubling of Track between Basar station (Incl) from Km 430.000 (Ch: 430000) & Navipet station to Km 446.900 (Ch:446900) [i.e. (16.90km)] including Electrification & Signaling works in connection with Mudkhed- Medchal Doubling Project in Hyderabad Division of South Central Railway in the State of Telangana."
Contract Type Works
Tender Type Open
Advertised Value2116275982.99
Bidding Style Single Rate for Each Schedule
Bidding System Two Packet System
Pre-Bid Required Yes
Pre-Bid Query Date Time 10/04/2024 11:30 2nd Pre-Bid Conference Required No 2nd Pre-Bid Conference Date Time Not Applicable
Tendering Section GENERAL
Bidding Unit
Publishing Date / Time 06/03/2024 15:33
Period Of Completion 24 Months
Bidding Start Date 05/06/2024
Closing Date Time19/06/2024 15:00
Validity of Offer ( Days)180
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)10581400.00
Description- Engineering Procurement Construction (EPC) contract in connection with Doubling of Track between Basar station (Incl) from Km 430.000 (Ch: 430000) & Navipet station to Km 446.900 (Ch:446900) [i.e. (16.90km)] including Electrification & Signaling works of South Central Railway in connection with Mudkhed- Medchal Doubling Project in Hyderabad Division of South Central Railway in the State of Telangana."
More DetailsClick Here To Open
Tender No:  EPC-15-CAO-C-SC-2024 Dept/Rly:  SCR-CONST-HQ-ENGG/SOUTH CENTRAL RLY Closing Date/Time:   19/06/2024 15:00
 
Tender Title: SCR Construction Organization: Engineering Procurement Const...... Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 DETAILSOFPERSONNEL,PLANTANDMACHINERYWORKSONHANDFORMATS.pdf DETAILS OF PERSONNEL, MACHINERY WORKS ON HAND F......
2 EMPLOYMNTOFRETIREDRAILWAYOFFICERSCERTIFICATEFORMAT.pdf RETIRED RAILWAY OFFICIALS EMPLOYMENT FORMAT
3 NEFTFORM.pdf NEFT FORM
4 PublicProcurementPolicy-2017.pdf PUBLIC PROCUREMENT 9PREFERENCE TO MAKE IN INDIA0 O......
5 SPECIALCONDITIONSTECHNICALFOREARTHWORKANDCONCRETEWORKS-25.03.21ver6_1.pdf SPECIAL CONDITIONS TECHNICAL FOR EARTH WORK AND CO......
6 SPECIALCONDITIONS-TECHNICALforEarthworkandConcreteworks18.08.21ver1.pdf Special conditions Technical for Earth work and Co......
7 SplconsTechnicalforBldgsworksPFworksWorkshopsFOB-COPworks.-25.03.21Ver3.pdf Spl conditions Technical for Bldgs works-PF works-......
8 SpecialConditionsTechnicalforPSCslabsCONCRETEDESIGN25.03.21VER5.pdf Special Conditions Technical for PSC slabs CONCRET......
9 SpecialconditionsTechnicalforSupplyofballastver5-25.03.21.pdf Special conditions Technical for Supply of ballast......
10 SplconditionsTechnicalforLayingLinkingofRailwaytrack25.03.21ver3.pdf Spl conditions Technical for Laying and Linkingof ......
11 SplconditionsgeneralandTechnicalforATweldingofrailsVER5-11.08.20.pdf SPl conditions general and Technical for AT wledin......
12 BrNo434-23x18.3mpscgrider.pdf IMP Brno434
13 BR.NO.448-1A.pdf RUBNO4481A
14 StandardDrawingofGradientPost.pdf Km Post GRADIENT POST
15 RBGNVT-Model_1.pdf RBG NVT
16 RBG-BSX.pdf RBG BSX
17 BrNo433-1x12.20mPSCSlab.pdf Major brno 433
18 NVTFOB.pdf FOB NVT
19 FKBFOB.pdf FOB FKB
20 BallastRetainer-4.57m-RCC-STD-153-2020.pdf BALLAST RETAINER 4 57 m span
21 Trolleyrefugee_banking.pdf trolley refuge
22 Trolley_refugee_cutting.pdf trolley refuge cutting
23 StandardPFwalls.pdf PF WALL
24 APPROVEDLISTofBRANDS.pdf APPROVED BRANDS
25 IBHUT.pdf IB HUT
26 GUMTY_1.pdf GUMTY
27 ORH-Model_1.pdf ORH PLAN
28 ESPOFBASAR_1.pdf ESP OF BASAR
29 ESPOFNAVIPET.pdf ESP OF NVT
30 MUD-MEDLSKm.430.00TOKm.435.00.pdf L Section km 430 km 435
31 MUD-MEDLSKm.435.00TOKm.440.00.pdf L Section km 435 TO KMm 440
32 MUD-MEDLSKm.440.00TOKm.445.00.pdf L Section Km 440 Km 445
33 MUD-MEDLSKm.445.00TOKm.450.00.pdf L Section Km 445 to Km 450
34 ESPOFFAKHRABAD_1.pdf ESP FKB
35 GatelodgeatLC-185-Model_1.pdf Gate lodge
36 Drainage-Model.pdf side drain
37 INDEXPlanKM430-KM460_compressed.pdf Index plan 430 to 460
38 IndexsectionoutputKM400-450-Layout11.pdf index section Km 400 to Km 450
39 2.RDSOOHEPSIReportsandemp.sch.pdf RDSO OHE PSI REPORTS
40 4.master_list_of_drawings_TI2023_compressed.pdf 4 Master list of drgs
41 BafflewallandprotectivescreenRDSOdrgs.pdf bafflem wall and Protective screen
42 BondingandeartingSpec.1990.pdf bonding and earthing specification
43 ElectricalTRDdrawingslinks.pdf Electrical TRD drg links
44 ETISPCPSICLS0020.pdf ETI SPC PSI CLS 0020
45 GodavaribridgePartLOP..pdf GODAVARI Bridge part LOP
46 ImportantElectricalTRDguidelinesletters.pdf Important electrical TRD Guide line
47 KM-430-432BASARYARDLOP_compressed.pdf Km 430 to Km 432 Basar yard loop
48 KM-432-436Basar-NavipetLOP_compressed.pdf km 432 to Km 436 BSX NVT LOP
49 km-436-440Basar-Navipetlop-FakrabadHaltstn_compressed.pdf Km 436 Km 440 BSXNVT FKB LOP
50 KM-440-444Basar-NavipetLOP_compressed.pdf kM440 444 BSX NVT LOP
51 Pre-inspectionRBletterno2000.RS.G.379.2dt06-09-2017.pdf Preinspection RB LR
52 Pre-inspetion_290818.pdf Preinspection 290818
53 Provisionofretro-reflectivenumberplateonONEmast07.05.2012.pdf Provision of retroreflective number
54 ProvisionofStd.ISMBtypeofHeightgaugesonoldlinesideofNewDoubling-Triplingworks..pdf provision of Std ISMB type HG
55 TIDRGPSIATRDSO00009201TSSscottDoublelineparalleltotrack.pdf TI DRG PSI AT RDSO 00009 20 1 TSS
56 TIDRGPSIATRDSO000152001ModA-SSP.pdf TI DRG PSI AT RDSO 00015 20 1 MOD
57 TI_SPC_RCC_SCADA_0134-pages-11.pdf TI SPC RCC SCADA 0134
58 TICIVMS2020dt22.08.2022galvanization.pdf TICI VMS 2020 DT 22082022 GALVANIZA
59 PART-1MUE-INDALVAIFINALLAPPROVEDSECTIONING07-03-2022_compressed.pdf Part1 MUEINDALVAI Final approval
60 Sntdrawings_compressed.pdf S AND T Drgs
61 EARTHINGatstns.pdf Earthing at stns
62 ReferenceDrawings2.pdf Ref drgs
63 SIPBASAR-IPU4152A.pdf BASAR SIP
64 Navipet-0145C-Alt-4.pdf NAVIPET SIP
65 ESO-87.pdf ESO 87
66 NEFT_FORM_GCC_2022.pdf NEFT FORM
67 10517PFshelter.pdf PF Shelter
68 PFBoundaryWall.pdf PF Boundary wall
69 HeightGuage.pdf Ht Guage
70 RCC-STD-156-2020.pdf Ballast Retainer
71 SPECIMENDRGFORPLATFORMAMENITIES.pdf Specimen Drg for PF Amenities
72 BallastprofileforLWRtrack.pdf Ballast Profile for LWR Track
73 CEGETechnicalCircular04202207.04.2022_compressed.pdf CEGE Technical Circular
74 ComprehensiveInstructionsforPassengersAmenities.pdf Comprehensive Instructions for Pass
75 DrawingsasperESO87.pdf Drawing references as per ESP 87
76 ImportantpolicylettersforEPCtenders.pdf Iimportant Policy on EPC Tenders
77 RFPDocumentFinalason05-03-2024_1.pdf RFP Document
78 EPCDocumentBSX-NVPTFinal_1.pdf EPC Document
79 TENTATIVEGPSCUMSECDRGFORBASARNAVIPETJAN2024-Model.pdf GPS CUM SEC DRG BSX NVPT