Tender Details
Deptt./Rly. Unit SCR-CONST-HQ-ENGG/SOUTH CENTRAL RLY
Tender No. EPC-02-CAO-C-SC-2024
Tender Title SCR Construction Organization - Engineering, Procurement and Construction (EPC) contract for Doubling of track between Valigonda station (Incl.) and Kukkadam station (Excl.) from Km 28.00 to Km 103.00 (i.e., 75 Km) including Electrification & Signaling works in connection with Guntur-Bibinagar doubling project in Guntur division of South Central Railway.
Contract Type Works
Tender Type Open
Advertised Value8530864889.50
Bidding Style Single Rate for Each Schedule
Bidding System Two Packet System
Pre-Bid Required Yes
Pre-Bid Query Date Time 26/04/2024 11:30 2nd Pre-Bid Conference Required No 2nd Pre-Bid Conference Date Time Not Applicable
Tendering Section GENERAL
Bidding Unit
Publishing Date / Time 09/03/2024 15:40
Period Of Completion 33 Months
Bidding Start Date 06/06/2024
Closing Date Time20/06/2024 15:00
Validity of Offer ( Days)180
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)20000000.00
Description- SCR Construction Organization - Engineering, Procurement and Construction (EPC) contract for Doubling of track between Valigonda station (Incl.) and Kukkadam station (Excl.) from Km 28.00 to Km 103.00 (i.e., 75 Km) including Electrification & Signaling works in connection with Guntur-Bibinagar doubling project in Guntur division of South Central Railway.
More DetailsClick Here To Open
Tender No:  EPC-02-CAO-C-SC-2024 Dept/Rly:  SCR-CONST-HQ-ENGG/SOUTH CENTRAL RLY Closing Date/Time:   20/06/2024 15:00
 
Tender Title: SCR Construction Organization - Engineering, Procurement and...... Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 Pre-inspectionRBletterno2000.RS.G.379.2dt06-09-2017.pdf Pre inspectionRB letter no 2000 RS G 379 2 dt 06 0......
2 ExtensionofATsupply.pdf Extension of AT supply
3 EARTHINGatstns.pdf EARTHING AT STATIONS SKETCH
4 BLDCFANSPECIFICATIONREV11522.pdf BLDC FAN SPECIFICATION REV 11 5 22
5 CrossSlopeforNewtrackfordoublings.pdf Cross Slope for New track for doublings
6 toAll-TechCircular04-2022_monitoringGEWorks.pdf Tech Circular 04 2022 monitoring GE Works
7 LEDlatestspecification.pdf LED latest specification
8 BondingandeartingSpec.1990.pdf Bonding and earting Spec 1990
9 Signages_Standard_Sizes_11zon.pdf Signages Standard Sizes
10 ATJUNCTIONBOXLATEST.pdf AT JUNCTION BOX LATEST
11 ProvisionofStd.ISMBtypeofHeightgaugesonoldlinesideofNewDoubling-Triplingworks..pdf Provision of Std ISMB type of Height gauges on old......
12 SubmissionofrevisedEIGapplicationforOHEPSIassets-28.04.2023.pdf Submission of revised EIG application for OHE and ......
13 EffectivejointcheckofREworkstoimprovereliabilityofnewTRDassets.pdf Effective joint check of RE works to improve relia......
14 stonepitchingdrgforTrdFoundations.pdf stone pitching drg for Trd Foundations
15 Provisionofretro-reflectivenumberplateonONEmast07.05.2012.pdf Provision of retro reflective number plate on OHE ......
16 TIDRGPSIATRDSO00009201TSSscottDoublelineparalleltotrack.pdf TI DRG PSI AT RDSO 00009 20 1 TSS scott Double lin......
17 BUFFERENDDRG.pdf BUFFER END DRG
18 Corrigendumon-StandardizationofstencillingonOHEmasts.pdf Corrigendum on Standardization of stencilling on O......
19 CLSJUNCTIONBOXDRAWING-1.pdf CLS JUNCTION BOX DRAWING
20 Pre-inspetion_290818.pdf Pre inspetion 290818
21 TP0423IBScheme05052023.pdf IB SCHEME
22 ElectricalGeneralServiceManualVolume-IPowerSupply_Ebook_26-11-22.pdf Electrical General Service Manual Volume I Power S......
23 TI_SPC_RCC_SCADA_0134-pages-11.pdf TI SPC RCC SCADA
24 Modelwiring.pdf Model wiring
25 BafflewallandprotectivescreenRDSOdrgs.pdf Baffle wall and protective screen RDSO drgs
26 TIDRGPSIATRDSO000152001ModA-SSP.pdf TI DRG PSI AT RDSO 00015 20 01 Mod A SSP
27 TICIVMS2020dt22.08.2022galvanization.pdf TICIVMS2020 dt 22 08 2022 galvanization
28 SC-RetainingWall-chg-355-2021.pdf Retaining wall
29 TentativesketchforSatelliteTrackMachineDepot.pdf Tentative sketch for Satellite Track Machine Depot......
30 TMSidinglayout.pdf TM Siding lay out
31 SWSCONTROLANDBATTERYROOMEQUIPEMENTLAYOUT.pdf SWS CONTROL AND BATTERY ROOM EQUIPEMENT LAYOUT
32 PROCUREMENTANDSUPPLYOFTOOLSANDPLANTSFOROHEDEPOTINBZA.pdf PROCUREMENT AND SUPPLY OF TOOLS AND PLANTS FOR OHE......
33 SAMPLEGatelodgestandareddrawingsdwg.pdf Sample Gate lodge standared drawings dwg
34 CabletrenchdrawingsforSPSSP.pdf Cable trench drawings for SP SSP
35 conditiontobeincludedinEPCtenderstoimproveOHEreliblty.pdf Condition to be included in EPC tenders to improve......
36 ImportantpolicylettersforEPCtendersOHE.pdf Important policy letters for EPC tenders OHE
37 EPCOHEconditionsCEDEltrs.pdf EPC OHE conditions CEDE ltrs
38 GPSNallapaduMacherlaviaNadikudi.pdf GPS Nallapadu Macherla via Nadikudi
39 Gr.209GPS_PGDP_NDKD.pdf Gr209 GPS PGDP NDKD
40 GROUP209SECDIA_PARTB.pdf GROUP 209 SEC DIA PARTB
41 LOPKM100-104-Model.pdf LOP KM 100 TO 104
42 Lr.25kVfeedingsystempolicyCEDEletter.pdf Lr 25 kV feeding system policy CED
43 Master_list_of_drawings_TI2023_compressed.pdf Master list of drawings TI 2023
44 OHE-ImportantpolicylettersforEPCtenders.pdf OHE Important policy letters for
45 OHEListofRDSOdrawingsnos..pdf OHE List of RDSO drawings nos
46 PGDP-NKDIGROUP209SEC_DIA_PARTA.pdf PGDP NKDI GROUP209SEC DIA PARTA
47 RDSOOHEPSIReportsandemp.sch.pdf RDSO OHE N PSI Reports and emp sch
48 BLDCspec.pdf BLDC spec
49 EPCSOLARSPEC.pdf EPC SOLAR SPEC
50 LEDSPECIFICATIONS.pdf LED SPECIFICATIONS
51 RDSOELECTRICALPRACTICE.pdf RDSO ELECTRICAL PRACTICE
52 Signages_Standard_Sizes.pdf Signages Standard Sizes
53 Techanicalcircular--.pdf Technical circular Electrical
54 CEGETechnicalCircular04202207.04.2022_compressed.pdf CEGETechnicalCircular04202207
55 ComprehensiveInstructionsforPassengersAmenities.pdf ComprehensiveInstructionsforPasseng
56 HandbookonArtisantoolsforOSMTLandACDepot.pdf HandbookonArtisantoolsforOSMTLandAC
57 ImportantpolicylettersforEPCtenders.pdf ImportantpolicylettersforEPCtenders
58 Mono-PERCSolar.pdf Mono PERCSolar
59 NationalElectricalCode2023_part1.pdf NationalElectricalCode2023 part1
60 NationalElectricalCode2023_part2.pdf NationalElectricalCode2023 part2
61 safetyatworksites-compressed.pdf safetyatworksites
62 SchemeforABS.pdf Scheme for ABS
63 SCRLEDSPECREV03.03.23.pdf SCRLEDSPECREV03 03 23
64 TechCircular05-2022provisionofearthelectrodes_compressed.pdf TechCircular05 2022provisionofearth
65 NEFT_FORM_GCC_2022.pdf NEFT FORM
66 Specificatinsofballast.pdf specifications for ballast
67 TENTATIVESIGNALLINGSKETCH.pdf Tentative Signalling sketch
68 APPROVEDLISTofBRANDS.pdf Approved Brands and Makes
69 ElectricalTRDdrawingslinks.pdf Electrical TRD drawings links
70 ETISPCPSICLS0020.pdf ETI SPC PSI CLS 0020
71 LOPKM28-31-Model.pdf LOP KM 28 31
72 LOPKM31-33-Model.pdf LOP KM 31 33
73 LOPKM34-36-Model.pdf LOP KM 34 36
74 LOPKM37-40-Model.pdf LOP KM 37 40
75 LOPKM41-43-Model.pdf LOP KM 41 43
76 LOPKM43-46-Model.pdf LOP KM 43 46
77 LOPKM46-50-Model.pdf LOP KM 46 50
78 LOPKM50-52-Model.pdf LOP KM 50 52
79 LOPKM52-55-Model.pdf LOP KM 52 55l
80 LOPKM55-58-Model.pdf LOP KM 55 58
81 LOPKM58-61-Model.pdf LOP KM 58 61
82 LOPKM61-65-Model.pdf LOP KM 61 65
83 LOPKM65-67-Model.pdf LOP KM 65 67
84 LOPKM67-71-Model.pdf LOP KM 67 71
85 LOPKM71-75-Model.pdf LOP KM 71 75
86 LOPKM75-77NALGONDA-Model.pdf LOP KM 75 77
87 LOPKM78-81-Model.pdf LOP KM 78 81
88 LOPKM81-84-Model.pdf LOP KM 81 84
89 LOPKM85-88RAYANGUDEM-Model.pdf LOP KM 85 88
90 LOPKM88-91-Model.pdf LOP KM 88 91
91 LOPKM91-93-Model.pdf LOP KM 91 93
92 LOPKM93-96TRIPPARTY-Model.pdf LOP KM 93 96
93 LOPKM96-100-Model.pdf LOP KM 96 100
94 ImportantElectricalTRDguidelinesletters.pdf Important Electrical TRD guidelines
95 techanicalcircular12.pdf techanical circular 12
96 EPCDOCUMENT_OFVLGKADM.pdf EPC Document of VLG KADM
97 RFPDOCUMENTOFVLG_KADM_1.pdf RFP Document OF VLG KADM
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued