Tender Details
Deptt./Rly. Unit PIU-PATNA-CIVIL/RVNL
Tender No. SEB-GHD-ANH-FOB-SLT-05
Tender Title Construction of FOB, High level platform no. 1, 2 & 3 and Other miscellaneous work at Ankorah (ANH) yard in connection With Construction of 3rd Line from Sonnagar to Garhwa road in DDU Division of East Central Railway.'
Contract Type Works
Tender Type Special Limited
Advertised Value67499940.06
Bidding Style Single Rate for Each Schedule
Bidding System Single Packet System
Pre-Bid Required No
Pre-Bid Query Date Time Not Applicable
Tendering Section TENDER
Bidding Unit
Publishing Date / Time 15/04/2024 16:19
Period Of Completion 6 Months
Bidding Start Date 19/04/2024
Closing Date Time25/04/2024 11:00
Validity of Offer ( Days)162
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)487500.00
Description41010 - Providing and laying in position M-20 Grade concrete for reinforced concrete structural elements, but excluding cost of centering, shttering, reinforcement and admixtures in recommended proportion (as per IS:9103) to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge.(41011 - All work upto plinth level including raft foundation of washable PRONS, HS tank, pile cap, footings of FOB and platform shelter etc.) 01 41012 3.00 cum 5814.78 17444.35 AT Par 17444.35
More DetailsClick Here To Open
Tender No:  SEB-GHD-ANH-FOB-SLT-05 Dept/Rly:  PIU-PATNA-CIVIL/RVNL Closing Date/Time:   25/04/2024 11:00
 
Tender Title: Construction of FOB, High level platform no. 1, 2 & 3 and Other miscellaneous work at Ankorah (ANH) yard in connection With Construction of 3rd Line from Sonnagar to Garhwa road in DDU Division of East Central Railway.' Tender Type: Special Limited
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 BIDDOCUMENT11_compressed.pdf BID DOCUMENT
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued