|
||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||
|
Tender Details Deptt./Rly. Unit BHUSAWAL DIVN-ENGINEERING/CENTRAL RLY Tender No. DRMWBSL182024t3 Tender Title Construction of boundary wall at Bhusawal Estate to safeguard the Railway land made free from encroachment. Length = 5.75 Kms (ID 01.01.64.23.1.50.002) Contract Type Works Tender Type Open Advertised Value 66701760.16 Bidding Style Single Rate for Tender Bidding System Single Packet System Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Tendering Section DIVISION Bidding Unit Above/Below/Par Publishing Date / Time 30/04/2024 13:51 Period Of Completion 12 Months Bidding Start Date 16/05/2024 Closing Date Time 30/05/2024 15:00 Validity of Offer ( Days) 60 Are Joint Venture (JV) firms allowed to bid - Tender Doc. Cost (Rs.) 0.00 Earnest Money (Rs.) 483500.00 Description DSR - 2021 More Details Click Here To Open
Tender No: DRMWBSL182024t3 Dept/Rly: BHUSAWAL DIVN-ENGINEERING/CENTRAL RLY Closing Date/Time: 30/05/2024 15:00 Tender Title: Construction of boundary wall at Bhusawal Estate to safeguard the Railway land made free from encroachment. Length = 5.75 Kms (ID 01.01.64.23.1.50.002) Tender Type: Open
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description 1 GCCApril-2022AdvanceCorrectionSlipNo_4ACS-4.pdf Correction slip GCC 4 2 AnnextureVIB.pdf Annexture VIB 3 GCCACS01dated14072022.pdf Correction slip GCC 4 GCCACS02dated13122022.pdf Correction slip GCC 2 5 GCCACS03dated26042023.pdf Correction slip GCC 3 6 PCECircularno.207part1.pdf PCE Circular 207 p1 7 PCECircularno.207part2.pdf PCE Circular 207 p2 8 PCECircular208CementConcretemixcontent_HQletter_08.04.21.pdf PCECIRCULAR208 9 GCCACS05dated20102023.pdf Correction slip GCC5 10 GCCACS06dated21122023.pdf Correction slip GCC6 11 DRMWbs182024t3RCCwall.pdf DRMWBSL
Corrigenda Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued.
S.No Name Date/Time Action No Corrigendum Issued