Tender Details
Deptt./Rly. Unit BRIDGELINE-JHS-ENGINEERING/NORTH CENTRAL RLY
Tender No. Br-JHS-2024-05
Tender Title Jhansi Division- Construction of Road Over Bridge (ROB) in lieu of Level Crossing No. 319 at km 109/8-10 in Bina-Jhansi Section.
Contract Type Works
Tender Type Open
Advertised Value411245720.78
Bidding Style Single Rate for Each Schedule
Bidding System Two Packet System
Pre-Bid Required No
Pre-Bid Query Date Time Not Applicable
Tendering Section BRIDGELINE
Bidding Unit
Publishing Date / Time 30/04/2024 17:12
Period Of Completion 18 Months
Bidding Start Date 16/05/2024
Closing Date Time30/05/2024 15:00
Validity of Offer ( Days)90
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)2206200.00
DescriptionPlease see item break up. S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule B-DSR 2021 Items 24332671.34 Above/ Below/Par 1 Please see Item Breakup for details. 24332671.34 AT Par 24332671.34
More DetailsClick Here To Open
Tender No:  Br-JHS-2024-05 Dept/Rly:  BRIDGELINE-JHS-ENGINEERING/NORTH CENTRAL RLY Closing Date/Time:   30/05/2024 15:00
 
Tender Title: Jhansi Division- Construction of Road Over Bridge (ROB) in lieu of Level Crossing No. 319 at km 109/8-10 in Bina-Jhansi Section. Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 GCCApril2022.pdf GCC April 2022
2 GCCApril2022ACSNo_1.pdf ACS No 1
3 GCCApril2022ACSNo_2.pdf ACS No 2
4 GCCApril2022ACSNo_3.pdf ACS No 3
5 PCEcircular103RanditscorrectionslipinHindidt-27-04-23.pdf PCE Circular 103
6 GCC_April-2022_AnnexureVIB.pdf Annexure VIB
7 AnnexureVIA.pdf Annexure VIA
8 PCEcircular103revised.pdf PCE Circular 103 revised
9 GCC2022ACS4.pdf GCCApril2022ACS no 4
10 GCC2022ACS5.pdf ACS No 5
11 ACSNo6.pdf ACS No 6
12 ROBatLCno319Drgno169-2024_.pdf GAD of LC 319
13 TD05ROB319.pdf Tender Documents
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued