|
||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||
|
Tender Details Deptt./Rly. Unit MYSORE DIVISION-ENGINEERING/SOUTH WESTERN RLY Tender No. 08MYS24of03-05-24itemno11 Tender Title HLN-ASK Section: Proposed construction of foot over bridge (3m wide) of clear span 1 x 11.33m with staircase facility at km: 104/100 between MVC-HAS stations to eliminate unauthorized crossing. Contract Type Works Tender Type Open Advertised Value 14495907.69 Bidding Style [ Decision at Schedule level ] Bidding System Single Packet System Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Tendering Section DEN/C Bidding Unit Publishing Date / Time 03/05/2024 13:02 Period Of Completion 6 Months Bidding Start Date 13/05/2024 Closing Date Time 27/05/2024 11:00 Validity of Offer ( Days) 45 Are Joint Venture (JV) firms allowed to bid - Tender Doc. Cost (Rs.) 0.00 Earnest Money (Rs.) 222500.00 Description List of items that are covered under USSOR S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule A-List of items that are covered under DSR 2881744.38 1 Please see Item Breakup for details. 3647777.70 (-) 21.00 2881744.38 Above/ Below/Par More Details Click Here To Open
Tender No: 08MYS24of03-05-24itemno11 Dept/Rly: MYSORE DIVISION-ENGINEERING/SOUTH WESTERN RLY Closing Date/Time: 27/05/2024 11:00 Tender Title: HLN-ASK Section: Proposed construction of foot over bridge (3m wide) of clear span 1 x 11.33m with staircase facility at km: 104/100 between MVC-HAS stations to eliminate unauthorized crossing. Tender Type: Open
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description 1 ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022.pdf Correction slip to GCC 2022 2 ACS-4toGCC-2022.pdf Correction slip to GCC 2022 3 GCCAdvanceCorrectionSlipNo5.pdf Correction Slip No 5 to GCC 2022 4 IRGCCApril2022.pdf IRGCC 5 GCCAdvanceCorrectionSlipNo6.pdf Correction Slip No 6 to GCC 2022 6 GCCACSCORRECTION.pdf Correction slip to GCC 2022 7 ACS-3toGCC-2022.pdf Correction slip to GCC 2022 8 FOB.pdf General Guidelines for tenderers 9 JPOforcablecut.pdf JPO for cable cut
Corrigenda Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued.
S.No Name Date/Time Action No Corrigendum Issued