Tender Details Deptt./Rly. Unit DYCE-C-I-TBM-ENGINEERING/SOUTHERN RLY Tender No. DyCE-CN-TBM-01-2024 Tender Title Proposed Third line between Tambaram and Chengalpattu - Proposed construction of S&T Huts, SSE office and Renovation of Dy.CE/CN/TBM office at Tambaram. Contract Type Works Tender Type Open Advertised Value 16169187.93 Bidding Style Single Rate for Each Schedule Bidding System Single Packet System Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Tendering Section WORKS Bidding Unit Publishing Date / Time 04/05/2024 13:15 Period Of Completion 6 Months Bidding Start Date 15/05/2024 Closing Date Time 29/05/2024 15:00 Validity of Offer ( Days) 60 Are Joint Venture (JV) firms allowed to bid - Tender Doc. Cost (Rs.) 0.00 Earnest Money (Rs.) 230900.00 Description Items of works that are covered by Delhi Schedule of Rates 2021 (except concrete items) S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule B-Items of work that are covered by DSR 2021 Schedule of Rates (Concrete items) 2942474.50 Above/ Below/Par 1 Please see Item Breakup for details. 2942474.50 AT Par 2942474.50 More Details Click Here To Open
Tender No: DyCE-CN-TBM-01-2024 Dept/Rly: DYCE-C-I-TBM-ENGINEERING/SOUTHERN RLY Closing Date/Time: 29/05/2024 15:00 Tender Title: Proposed Third line between Tambaram and Chengalpattu - Proposed construction of S&T Huts, SSE office and Renovation of Dy.CE/CN/TBM office at Tambaram. Tender Type: Open
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description 1 PartAtoC.pdf Tender Documents Part A to C 2 scopeofworkMilestoneandlistofdrawings.pdf scope Mile stone list of drawing 3 GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf GCC April 2022 4 GCCACSs.pdf GCC CS upto ACS 6 5 ussor21specs.pdf USSOR 2021 Specification 6 CPWDSPECVOL1_1.pdf CPWD SPEC VOL 1 7 CPWDSPECVOL2Part1.pdf CPWD SPEC VOL 2 Part1 8 CPWDSPECVOL2Part2.pdf CPWD SPEC VOL 2 Part2 9 CPWDSPECVOL2Part3.pdf CPWD SPEC VOL 2 Part3
Corrigenda Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued.
S.No Name Date/Time Action No Corrigendum Issued