|
||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||
|
Tender Details Deptt./Rly. Unit BANGALORE DIVISION-ENGG/SOUTH WESTERN RLY Tender No. 11SBC24OF14-05-24Item-01 Tender Title SW I : Bengaluru - Sampige road section : Proposed construction of RCC drain in connection with the work of "Through ballast recoupment of Points and crossings - 6 points in Dodbele (DBL) yard and 4 points in Hirehalli (HHL) yard (Total 10 Nos.,)". SW II : Bengaluru - Sampige road sec : Construction of balance retaining wall, approach road etc., of RUB in lieu of LC-37 at km 64/200-300 in Kyatsandra (KIAT) station yard. SW III : Yelahanka - Chintamani section : Proposed improvements to RUB No. 215-A at km 30/900- 31/100 in ADEN/Yesvanthpur subdivision. Maintenance period is 6 months Contract Type Works Tender Type Open Advertised Value 27325080.70 Bidding Style Single Rate for Each Schedule Item Bidding System Single Packet System Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Tendering Section GENERAL Bidding Unit Publishing Date / Time 14/05/2024 16:45 Period Of Completion 9 Months Bidding Start Date 23/05/2024 Closing Date Time 06/06/2024 15:00 Validity of Offer ( Days) 60 Are Joint Venture (JV) firms allowed to bid - Tender Doc. Cost (Rs.) 0.00 Earnest Money (Rs.) 286600.00 Description SW I : Bengaluru - Sampige road section : Proposed construction of RCC drain in connection with the work of "Through ballast recoupment of Points and crossings - 6 points in Dodbele (DBL) yard and 4 points in Hirehalli (HHL) yard (Total 10 Nos.,). 2 Please see Item Breakup for details. 438625.29 (-) 21.00 346513.98 Above/ Below/Par More Details Click Here To Open
Tender No: 11SBC24OF14-05-24Item-01 Dept/Rly: BANGALORE DIVISION-ENGG/SOUTH WESTERN RLY Closing Date/Time: 06/06/2024 15:00 Tender Title: SW I : Bengaluru - Sampige road section : Proposed construction of RCC drain in connection with the work of "Through ballast recoupment of Points and crossings - 6 points in Dodbele (DBL) yard and 4 points in Hirehalli (HHL) yard (Total 10 Nos.,)". SW II : Bengaluru - Sampige road sec : Construction of balance retaining wall, approach road etc., of RUB in lieu of LC-37 at km 64/200-300 in Kyatsandra (KIAT) station yard. SW III : Yelahanka - Chintamani section : Proposed improvements to RUB No. 215-A at km 30/900-31/100 in ADEN/Yesvanthpur subdivision. Maintenance period is 6 months Tender Type: Open
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description 1 GCCACS.pdf Advance Correction Slip No.1 2 NEFTForm.pdf NEFT Form 3 IRGCCApril2022.pdf IRGCC April 2022 4 ACS-6.pdf Advanced correction slip - 6 to GCC 2022 5 ACS-5toGCC2022.pdf Advanced correction slip - 5 to GCC 2022 6 Instructionstobidders.pdf Instructions to bidder 7 StdTenderDocument-Version6.0-New.pdf Standard Tender Document - Version 6.0 New 8 GCC2022ACS-3_20230426_1141401.pdf Advanced correction slip - 3 9 ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.20221.pdf Advance Correction Slip No.2
Corrigenda Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued.
S.No Name Date/Time Action No Corrigendum Issued