|
||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||
|
Tender Details Deptt./Rly. Unit BANGALORE DIVISION-ENGG/SOUTH WESTERN RLY Tender No. 12SBC24OF28-05-24Item-1 Tender Title Sr. DEN/North/SBC Jurisdiction : SW I : ADEN/Yesvanthpur sub-division : Proposed Construction of toilets for Divyang persons at Heggere Halt (HEI), Mallasandra (MLSA), Gubbi (GBB), Nittur (NTR), Sampige Road (SPGR) and Yelahanka (YNK) PF No. 4/5 stations. SW II : ADEN/Yesvanthpur sub-division : Provision of Divyangjan facilities like toilets, drinking water booths, railing, non-slippery walkways, ramps and trolley path at Chikka Banavara (BAW), Golhalli (GHL), Dodbele (DBL), Nidavanda (NDV), Dobbspet (DBS), Hirehalli (HHL), Kyatsandra (KIAT), Heggere halt (HEI), Gubbi (GBB), Nittur (NTR), Lottegollahalli (LOGH), Kodigehalli (KDGH), Yelahanka (YNK), Rajanukunte (RNN), Nandi Halt (NDY), Chikkaballapur (CBP), Sidlaghatta (IDT), Mallasandra (MLSA) and Sampige Road (SPGR) stations in ADEN/YPR sub-divison. SW III : Baiyappanahalli - Dharmavaram section : Proposed drainage arrangements at RUB No. 121/B (at old LC No. 113) at km 176/400-500 between Nagasamudram (NGM) - Dharmavaram (DMM)stations in ADEN/Hindupur sub-division. Maintenance period is 12 months Contract Type Works Tender Type Open Advertised Value 25283582.92 Bidding Style Single Rate for Each Schedule Item Bidding System Single Packet System Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Tendering Section GENERAL Bidding Unit Publishing Date / Time 28/05/2024 12:55 Period Of Completion 9 Months Bidding Start Date 06/06/2024 Closing Date Time 20/06/2024 15:00 Validity of Offer ( Days) 60 Are Joint Venture (JV) firms allowed to bid - Tender Doc. Cost (Rs.) 0.00 Earnest Money (Rs.) 276400.00 Description SW I : ADEN/Yesvanthpur sub-division : Proposed Construction of toilets for Divyang persons at Heggere Halt (HEI), Mallasandra (MLSA), Gubbi (GBB), Nittur (NTR), Sampige Road (SPGR) and Yelahanka (YNK) PF No. 4/5 stations. 2 Please see Item Breakup for details. 14935303.33 (-) 21.00 11798889.63 Above/ Below/Par More Details Click Here To Open
Tender No: 12SBC24OF28-05-24Item-1 Dept/Rly: BANGALORE DIVISION-ENGG/SOUTH WESTERN RLY Closing Date/Time: 20/06/2024 15:00 Tender Title: Sr. DEN/North/SBC Jurisdiction : SW I : ADEN/Yesvanthpur sub-division : Proposed Construction of toilets for Divyang persons at Heggere Halt (HEI), Mallasandra (MLSA), Gubbi (GBB), Nittur (NTR), Sampige Road (SPGR) and Yelahanka (YNK) PF No. 4/5 stations. SW II : ADEN/Yesvanthpur sub-division : Provision of Divyangjan facilities like toilets, drinking water booths, railing, non-slippery walkways, ramps and trolley path at Chikka Banavara (BAW), Golhalli (GHL), Dodbele (DBL), Nidavanda (NDV), Dobbspet (DBS), Hirehalli (HHL), Kyatsandra (KIAT), Heggere halt (HEI), Gubbi (GBB), Nittur (NTR), Lottegollahalli (LOGH), Kodigehalli (KDGH), Yelahanka (YNK), Rajanukunte (RNN), Nandi Halt (NDY), Chikkaballapur (CBP), Sidlaghatta (IDT), Mallasandra (MLSA) and Sampige Road (SPGR) stations in ADEN/YPR sub-divison. SW III : Baiyappanahalli - Dharmavaram section : Proposed drainage arrangements at RUB No. 121/B (at old LC No. 113) at km 176/400-500 between Nagasamudram (NGM) - Dharmavaram (DMM)stations in ADEN/Hindupur sub-division. Maintenance period is 12 months Tender Type: Open
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description 1 GCCACS.pdf Advance Correction Slip No.1 2 NEFTForm.pdf NEFT Form 3 IRGCCApril2022.pdf IRGCC April 2022 4 ACS-6.pdf Advanced correction slip - 6 to GCC 2022 5 ACS-5toGCC2022.pdf Advanced correction slip - 5 to GCC 2022 6 Instructionstobidders.pdf Instructions to bidder 7 StdTenderDocument-Version6.0-New.pdf Standard Tender Document - Version 6.0 New 8 GCC2022ACS-3_20230426_1141401.pdf Advanced correction slip - 3 9 ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.20221.pdf Advance Correction Slip No.2
Corrigenda Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued.
S.No Name Date/Time Action No Corrigendum Issued