Tender Details
Deptt./Rly. Unit SECUNDERABAD DIVISION-ENGG/SOUTH CENTRAL RLY
Tender No. 51_N_SC_24_OT
Tender Title Secunderabad Division: MAGH-GDCR section: Proposed construction of Road under bridge (RUB) with double vent in lieu of LC No. 3(M) SL (Single Line) (2X5.5X5M) at KM 6/14-7/1 between RAJU - PRPI stations Manikgarh - Gadchandur section. (BY OPEN CUT & CAST- IN-SITU METHOD)
Contract Type Works
Tender Type Open
Advertised Value157511157.87
Bidding Style Single Rate for Each Schedule
Bidding System Two Packet System
Pre-Bid Required No
Pre-Bid Query Date Time Not Applicable
Tendering Section ENGG
Bidding Unit
Publishing Date / Time 29/05/2024 11:43
Period Of Completion 12 Months
Bidding Start Date 05/06/2024
Closing Date Time19/06/2024 14:00
Validity of Offer ( Days)90
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)937600.00
DescriptionIRUSSOR-2021 LAUNCHING ITEM S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule B-SCHEDULE - B 27591850.04 Above/ Below/Par 2 Please see Item Breakup for details. 27591850.04 AT Par 27591850.04
More DetailsClick Here To Open
Tender No:  51_N_SC_24_OT Dept/Rly:  SECUNDERABAD DIVISION-ENGG/SOUTH CENTRAL RLY Closing Date/Time:   19/06/2024 14:00
 
Tender Title: Secunderabad Division: MAGH-GDCR section: Proposed construction of Road under bridge (RUB) with double vent in lieu of LC No. 3(M) SL (Single Line) (2X5.5X5M) at KM 6/14-7/1 between RAJU - PRPI stations Manikgarh - Gadchandur section. (BY OPEN CUT & CAST-IN-SITU METHOD) Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 Mastertenderbooklet1ason27.05.2024.pdf Tender Document 1
2 Mastertenderbooklet2ason07.03.2024.pdf Tender Document 2
3 PARTICULARSOFWORK.pdf Particulars of work
4 1FinalBrSplCon.pdf Bridge spl conditions
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued