Deptt./Rly. Unit HUBLI DIVISION-ENGG/SOUTH WESTERN RLY
Tender No. 10UBL24-25DT050624ITEM-06
Tender Title Hubballi Division: Gadag-Hotgi (GDG-HG) section: Construction of Retaining wall and side drain @ km 163/800-163/960 (DN LINE) between Mulvad-Kudgi (MVD-KDGI) stations.
Contract Type Works
Tender Type Open
Advertised Value18237623.78
Bidding Style Single Rate for Each Schedule
Bidding System Single Packet System
Pre-Bid Required No
Pre-Bid Query Date Time Not Applicable
Tendering Section SR.DEN/C/U
Bidding Unit
Publishing Date / Time 06/06/2024 12:54
Period Of Completion 6 Months
Bidding Start Date 17/06/2024
Closing Date Time01/07/2024 11:00
Validity of Offer ( Days)45
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)241200.00
DescriptionSchedule-A S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule B-Schedule-B 1927350.00 Above/ Below/Par 4 Please see Item Breakup for details. 1927350.00 AT Par 1927350.00
More DetailsClick Here To Open
Tender No:  10UBL24-25DT050624ITEM-06 Dept/Rly:  HUBLI DIVISION-ENGG/SOUTH WESTERN RLY Closing Date/Time:   01/07/2024 11:00
 
Tender Title: Hubballi Division: Gadag-Hotgi (GDG-HG) section: Construction of Retaining wall and side drain @ km 163/800-163/960 (DN LINE) between Mulvad-Kudgi (MVD-KDGI) stations. Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 TenderDocument6.0UpdatedwithCorrectionSlipsdated23.09.2023.pdf Tender Document
2 4.IRGCCApril2022.pdf GCC 2022
3 ACS-1dated14.07.2022.pdf ACS I
4 ACS-2dated13.12.2022.pdf ACS II
5 ACS-3dated26.04.2023.pdf ACS III
6 ACS-4dated07.08.2023.pdf ACS IV
7 ACS-6dated20.10.2023.pdf ACS VI
8 ACS-7dated21.12.2023.pdf ACS VII
9 BGverificationletter.pdf BG Form
10 NEFTFORM.pdf NEFT Form
11 JPOCircular_compressed.pdf JPO Circular
12 AnnexureVGCCcorrespondence.pdf Annexure V Correspondence
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued