Tender Details
Deptt./Rly. Unit ER-CAO-C-HQ-ENGG/EASTERN RLY
Tender No. EPC-01-CAO-C-ER-2024
Tender Title Execution of Earthwork in formation, minor bridges, major bridges, ROR, protection works including approaches, staff quarters and other service buildings, supply of track ballast, P.way linking including supply of all P. Way materials excluding Rails and other allied works between Ch. 1480.400m (from CL of Kajoragram Station) at Andal End to Ch. 4800.000m (from C/L of Kajoragram Station) near Bakhtarnagar Block Station including Electrification and Signalling & Telecom works in connection with Andal - Sainthia BG By-Pass Line on EPC mode.
Contract Type Works
Tender Type Open
Advertised Value1055500000.00
Bidding Style Single Rate for Tender
Bidding System Two Packet System
Pre-Bid Required Yes
Pre-Bid Query Date Time 03/07/2024 12:00 2nd Pre-Bid Conference Required No 2nd Pre-Bid Conference Date Time Not Applicable
Tendering Section PRD/CON/ER
Bidding Unit Above/Below/Par
Publishing Date / Time 07/06/2024 17:18
Period Of Completion 15 Months
Bidding Start Date 22/08/2024
Closing Date Time05/09/2024 16:00
Validity of Offer ( Days)180
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)5427500.00
Description- Engineering, Procurement and Construction (EPC) Contract Agreement for "Engineering, Procurement and Construction (EPC) Contract Agreement for "Execution of Earthwork in formation, minor bridges, major bridges, ROR, protection works including approaches, staff quarters and other service buildings, supply of track ballast, P.way linking including supply of all P. Way materials excluding Rails and other allied works between Ch. 1480.400 M (from CL of Kajoragram Station) at Andal End to Ch. 4800.000 M (from C/L of Kajoragram Station) near Bakhtarnagar Block Station including Electrification and Signalling & Telecom works in connection with Andal - Sainthia BG By-Pass Line on EPC mode".
More DetailsClick Here To Open
Tender No:  EPC-01-CAO-C-ER-2024 Dept/Rly:  ER-CAO-C-HQ-ENGG/EASTERN RLY Closing Date/Time:   05/09/2024 16:00
 
Tender Title: Execution of Earthwork in formation, minor bridges, major bridges, ROR, protection works including approaches, staff quarters and other service buildings, supply of track ballast, P.way linking including supply of all P. Way materials excluding Rails and other allied works between Ch. 1480.400m (from CL of Kajoragram Station) at Andal End to Ch. 4800.000m (from C/L of Kajoragram Station) near Bakhtarnagar Block Station including Electrification and Signalling & Telecom works in connection with Andal - Sainthia BG By-Pass Line on EPC mode. Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 17181-15ALT-2.PDF OWG Drawing
2 17181-11ALT-21.PDF OWG Drawing1
3 17181-16.PDF OWG Drawing 2
4 17181-12.PDF OWG Drawing 3
5 RDSOstdbox5.PDF RDSO Standard box
6 Temp00018.PDF Structural Design
7 RDSOstdbox2.PDF RDSO Standard box 1
8 Temp00015.PDF Structural Design 1
9 52-1R_.PDF Structural Design 2
10 1-A-EKAJORAL.C-Model.pdf LC gate No 1AE
11 RDSOstdbox.PDF RDSO Standard box 2
12 Temp00014.PDF Structural Design 3
13 RDSOstdbox6.PDF RDSO Standard box 3
14 Temp00019.PDF Structural Design 4
15 52-2R.PDF Structural Design 5
16 RDSOstdbox3.PDF RDSO Standard box 4
17 RDSOstdbox4.PDF Structural Design 6
18 Temp00016.PDF Structural Design 7
19 RDSOstdbox4_1.PDF Structural Design 8
20 Temp000171.PDF Structural Design 9
21 RDSOstdbox7.PDF Structural Design 10
22 Temp00020.PDF Structural Design 11
23 BR.NO.3EXIST-Model.pdf Drawing of Bridge No 3
24 BR.NO.8EXIST-Model.pdf Drawing of Bridge No 8
25 BR.NO.10EXIST-Model.pdf Drawing of Bridge No 10
26 BR.NO.4EXIST-Model.pdf Drawing of Bridge No 4
27 BR.NO.5EXIST-Model.pdf Drawing of Bridge No 5
28 BR.NO.6EXIST-Model.pdf Drawing of Bridge No 6
29 CERTIFIEDL.APLAN-HARISHPURA-3.pdf Land Plan HARISHPUR A 3
30 BR.NO.6FNEW-Model.pdf Drawing of Bridge No 6F new
31 BR.NO.5FNEW-Model.pdf Drawing of Bridge No 5F new
32 BR.NO.3FNEW-Model.pdf Drawing of Bridge No 3F new
33 Br.No.7FNEWROR-Model.pdf Drawing of Bridge No 7F new
34 BR.No.4FNEW-Model.pdf Drawing of Bridge No 4F new
35 WiringDiagramAndalBypassappdbyCTPMon18.03.24.pdf Wiring Diagram Andal Bypass
36 BR.No.1FNEW-Model.pdf Drawing of Bridge No 1F new
37 BR.NO.2EXIST-Model.pdf Drawing of Bridge No 2
38 BR.NO.1EXIST-Model.pdf Drawing of Bridge No 1
39 BR.NO.7EXIST-Model.pdf Drawing of Bridge No 7
40 BR.NO.2FNEW-Model.pdf Drawing of Bridge No 2F new
41 INSPECTIONPLAT.OFDECKPLATECBS-0044.pdf INSPECTION PLAT OF DECK PLATE
42 CBS-0042-1.pdf Drawing Side pathway
43 CBS-0042.pdf Drawing Side pathway 1
44 CBS-0042-2.pdf Drawing Side pathway 2
45 CBS-0042-3.pdf Drawing Side pathway 3
46 M-00015.5MAND8M.pdf Road under Bridge
47 MANREFUGECBS-0028.pdf Open web girder man refuge
48 PANRNGCetralEIandEIHUTPLAN.pdf Central EI and EI HUT PLAN
49 SEPTICTANK.pdf SEPTIC TANK
50 CERTIFIEDL.APLAN-BABUISOLA-3.pdf Land PLAN BABUISOL A 3
51 17181-1.PDF OWG Drawing 4
52 11753-6R1.pdf OWG Drawing 5
53 ANDALBY-PASSSH-I.pdf ANDAL BY PASS SH 1
54 ANDALBY-PASSSH-2.pdf ANDAL BY PASS SH 2
55 STDTYPECONCRETEFOULINGMARK.pdf STD TYPE CONCRETE FOULING MARK
56 SDAndalByPassAppdbyCEDE.pdf SD Andal By Pass
57 TROLLYREFUSEANDOHEMASTOBBEDBLOCKWITHRCCDETAILS.pdf TROLLY REFUSE AND OHE MAST OB BED
58 VISIBILITYDIAGRAMOFMANNEDLEVELCROSSING.pdf VISIBILITY DIAGRAM OF MANNED LEVEL
59 RDSO-B-11753-1R21.pdf Composite weld girder
60 CAOCONOHEMAST.pdf CAO CON OHE MAST
61 17181-17ALT-2.pdf OWG Drawing 6
62 11753-2-R21.pdf Composite weld girder
63 17181-2.pdf OWG Drawing 7
64 STDTYPELEVELCROSSINGROADSURFACE.pdf STD TYPE LEVEL CROSSING ROAD SURFAC
65 11753-5R21.pdf Composite weld girder 1
66 STDDRGOFBUFFER.pdf STD DRG OF BUFFER
67 GE50TransitionSystemonRailwayBridge.pdf GE 50 Transition System on Railway
68 BQTLinkCabinSIP.pdf BQT Link Cabin SIP
69 17181-7_ALT-2.pdf OWG Drawing 8
70 17181-6RALT-3.pdf OWG Drawing 9
71 STDTYPECESLEVELCROSSINGDRAWING.pdf STD TYPE CE LEVEL CROSSING DRAWIN
72 17181-8RALT-3.pdf OWG Drawing 9
73 17181-13.pdf OWG Drawing 10
74 17181-10ALT-2.pdf OWG Drawing 11
75 SUBSOILGEOTECHPART-I.pdf SUB SOIL GEOTECH PART I
76 BRNO5F6F-SOILREPORT.pdf BR NO 5F 6F SOIL REPORT
77 BRNO4F7F-SOILREPORT.pdf BR NO 4F 7F SOIL REPORT
78 PLATELOADTEST-II.pdf PLATE LOAD TEST II
79 KAJORAGRAMSIP.pdf KAJORAGRAM SIP
80 KAJORAGRAMALT-I.pdf KAJORAGRAM ALT I
81 PLATELOADTEST-I.pdf PLATE LOAD TEST I
82 BAKTARNAGARSIP1.pdf BAKTARNAGAR SIP 1
83 BAKTARNAGARSIP.pdf BAKTARNAGAR SIP
84 RDSO_B_10155_1.pdf Structural Design 12
85 RDSO_B_10155_7.pdf Structural Design 13
86 RDSO_B_10155_5.pdf Structural Design 14
87 RDSO_B_10155_6.pdf Structural Design 15
88 RDSO_B_10155_8.pdf Structural Design 16
89 RDSO_B_10155_09.pdf Structural Design 17
90 RDSO_B_10155_3.pdf Structural Design 18
91 RDSO_B_10155_2.pdf Structural Design 19
92 RDSO_B_10155_4.pdf Structural Design 20
93 4F-HYDROGRAPHIC.pdf HYDROGRAPHIC
94 RDSOROADSURFACEWITHPRECASTPSCBLOCKATLEVELCROSSING.pdf RDSO ROAD SURFACE WITH PRECAST PSC
95 SUBSOILGEOTECHPART-II.pdf SUB SOIL GEOTECH PART II
96 GATELODGE.pdf GATE LODGE
97 BAKHTARNAGARALT-I.pdf BAKHTARNAGAR ALT I
98 17181-_9R.pdf OWG Drawing 12
99 BAKHTARNAGARLINKCABINALT-I.pdf BAKHTARNAGAR LINK CABIN ALT I
100 17181-R2.pdf OWG Drawing 13
101 RDSO_B_10155_10.pdf Structural Design 21
102 17181-_18_erection.pdf Erection
103 RDSO_B_101551.pdf Box culvert
104 TI-DRG-CIV-HGAUGE-RDSO-00001-05-01UPTO7.3M.pdf DRG CIV HGAUGE RDSO 00001 05 01
105 MANREFUGECBS-0028_1.pdf MAN REFUGE CBS 0028
106 M-00015.5MAND8M_1.pdf M0001 5point5M AND 8M
107 11753-3R21.pdf Composite weld girder 2
108 RDSO-B-11753-R23.pdf Composite weld girder
109 11753-4R21.pdf Composite weld girder 3
110 RDSO_B_10152_R3.pdf Box culvert 1
111 TI-DRG-CIV-HGAUGE-RDSO-00002-05-017.3MTO12.2M.pdf DRG CIV HGAUGE RDSO 00002 05 01
112 M-00003_1.pdf Road surface 1
113 17181-_19_shipping_list.pdf shipping list
114 17181-3.pdf OWG Drawing 14
115 17181-4RALT-2.pdf OWG Drawing 15
116 17181-14.pdf OWG Drawing 16
117 17181-5-RALT-3.pdf OWG Drawing 16
118 TracksideIndicatorBoardsAndSignages.pdf Track side Indicator Boards
119 FinalRFPDocument.pdf RFP Document
120 FinalEPCAgreement.pdf EPC Agreement
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued