Tender Details
Deptt./Rly. Unit LUCKNOW/NER/DIVISION-GATI SHAKTI/NORTH EASTERN RLY
Tender No. NER-LJN-GS-2024-04
Tender Title Lucknow Division:- Construction of 02 lane Road Over Bridge (End to end including approaches) consisting of bow string girder of 1*48.0m clear span at Manned level crossing no. 189 SPL at Km. 554/5-6 between Munderwa - Orwara station in Gonda-Gorakhpur section.
Contract Type Works
Tender Type Open
Advertised Value388507591.20
Bidding Style Single Rate for Each Schedule Item
Bidding System Two Packet System
Pre-Bid Required No
Pre-Bid Query Date Time Not Applicable
Tendering Section GATISHAKTI
Bidding Unit
Publishing Date / Time 11/06/2024 15:41
Period Of Completion 18 Months
Bidding Start Date 21/06/2024
Closing Date Time05/07/2024 15:00
Validity of Offer ( Days)90
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)2092500.00
DescriptionAll the items as per attached Annexure-A-I, based on NER-USSOR-2021 and any other items not included in this annexure but provided in Chapter -1, 2 and 3 of NER-USSOR-2021 except supply of cement and steel reinforcement items with up to date correction slips. 2 Please see Item Breakup for details. 20371988.75 AT Par 20371988.75 Above/ Below/Par
More DetailsClick Here To Open
Tender No:  NER-LJN-GS-2024-04 Dept/Rly:  LUCKNOW/NER/DIVISION-GATI SHAKTI/NORTH EASTERN RLY Closing Date/Time:   05/07/2024 15:00
 
Tender Title: Lucknow Division:- Construction of 02 lane Road Over Bridge (End to end including approaches) consisting of bow string girder of 1*48.0m clear span at Manned level crossing no. 189 SPL at Km. 554/5-6 between Munderwa - Orwara station in Gonda-Gorakhpur section. Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 ROBGeneralcondition.pdf General Condition
2 GCC-2022-ACS6.pdf GCC April 2022
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued