|
|||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||
|
Tender Details Deptt./Rly. Unit ADRA DIVISION-ENGG/SOUTH EASTERN RLY Tender No. E-DRM-Engg-ADRA-91-24 Tender Title Construction of new one EI Main Building (47.61 mx8.81 m) and one EI Goomty (23.88mx8.46m) at Chharrah station in Adra Division. Contract Type Works Tender Type Open Advertised Value 14157507.04 Bidding Style Single Rate for Each Schedule Bidding System Single Packet System Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Tendering Section WORKS Bidding Unit Publishing Date / Time 13/06/2024 18:13 Period Of Completion 6 Months Bidding Start Date 21/06/2024 Closing Date Time 05/07/2024 15:00 Validity of Offer ( Days) 60 Are Joint Venture (JV) firms allowed to bid - Tender Doc. Cost (Rs.) 0.00 Earnest Money (Rs.) 220800.00 Description Execution of all works under CPWD DSR 2021-Ver-2 More Details Click Here To Open
Tender No: E-DRM-Engg-ADRA-91-24 Dept/Rly: ADRA DIVISION-ENGG/SOUTH EASTERN RLY Closing Date/Time: 05/07/2024 15:00 Tender Title: Construction of new one EI Main Building (47.61 mx8.81 m) and one EI Goomty (23.88mx8.46m) at Chharrah station in Adra Division. Tender Type: Open
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description 1 ACS-03OFGCC2022.pdf ACS 03 OF GCC 2022 2 2018_CE-I_CT_9Date04_06_2018.pdf Letter of Credit condition 3 SpecialConditions_Contract_17102018.pdf Updation Labour data shramikkalyan 4 JPOcabledamage.pdf JPO Cable damage 5 ANNEXUREVIAforBIDSECURITY.pdf Annexure 6 ANNEXUREVIBforFINANCIALCRITERIA.pdf Annexure 7 GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf GCC 2022 8 GCCACS.pdf Advance Correction Slip No1 of GCC 9 ASC-2GCC-2022.pdf Correction slip 10 Bidsecruitydocument.pdf Document of Bid Secruity 11 2023_10_20RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_5ACS-53.pdf Correction slip 12 correctionslip.pdf Correction slip
Corrigenda Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued.
S.No Name Date/Time Action No Corrigendum Issued