Tender Details
Deptt./Rly. Unit SALEM DIVISION-ENGINEERING/SOUTHERN RLY
Tender No. SA-OT-08-2024-06
Tender Title SA Div: Repairs to Divisional Office toilet blocks, car parking area, Division office approach road and construction of drivers room at Divisional Office
Contract Type Works
Tender Type Open
Advertised Value9980406.46
Bidding Style Single Rate for Each Schedule Item
Bidding System Single Packet System
Pre-Bid Required No
Pre-Bid Query Date Time Not Applicable
Tendering Section BUILDING
Bidding Unit
Publishing Date / Time 14/06/2024 18:26
Period Of Completion 6 Months
Bidding Start Date 24/06/2024
Closing Date Time08/07/2024 14:00
Validity of Offer ( Days)60
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)199600.00
DescriptionPLEASE SEE THE DETAILS IN THE ITEM BREAK UP S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule A1-Items of works that are covered by the Southern Railway DSR 2021 vide Schedule 'A1' applicable to SALEM DIVISION with all correction slips issued upto date - Supply of Steel . 582725.00 1 Please see Item Breakup for details. 582725.00 AT Par 582725.00 Above/ Below/Par
More DetailsClick Here To Open
Tender No:  SA-OT-08-2024-06 Dept/Rly:  SALEM DIVISION-ENGINEERING/SOUTHERN RLY Closing Date/Time:   08/07/2024 14:00
 
Tender Title: SA Div: Repairs to Divisional Office toilet blocks, car parking area, Division office approach road and construction of drivers room at Divisional Office Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 RlyBdletterClarificationofAnnexureV.pdf Clarification of Annexure V
2 ACS1TO4.pdf ADVANCE CORRECTION SLIP 1 TO 4
3 ACS5TO6.pdf ADVANCE CORRECTION SLIP 5 TO 6
4 ANNEXUREVVAVIAVIB.pdf ANNEXURE V VA VIB
5 GCCApril2022NEW.pdf GCC 2022
6 CheckListandNEFTform.pdf Check List and NEFT form
7 INSTRUCTIONSTOTHETENDERER.pdf INSTRUCTIONS TO THE TENDERER
8 SafetyprecautionstobeadoptedwhileworkinginElectrifiedArea.pdf Safety precautions to be adopted wh
9 Splconditionsofcontractformovementofvehicle.pdf Spl conditions of contract for move
10 ProcedureforLetterofCredit.pdf Procedure for Letter of Credit
11 Workonhanddetails.pdf Work on hand details
12 RBCECEICTImplementationofContractoremb.pdf Implementation of Contr e mb
13 SPECIFICATIONFORBUILDINGSBRIDGEWORKSNOV2023.pdf Building and Bridge Standard Docum
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued