|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Tender Details Deptt./Rly. Unit SER-CONST-HQ-ENGG/SOUTH EASTERN RLY Tender No. 4500-GRC-CE-C-HQ-43-2024 Tender Title Construction and Commissioning of maintenance facilities for Vande Bharat Coaching complex at Shalimar, Howrah (West Bengal) including all Civil, Electrical, Mechanical, Telecom works for South Eastern Railway on EPC mode. Estimate No. 1964W/2024. Contract Type Works Tender Type Open Advertised Value 2127761717.61 Bidding Style Single Rate for Tender Bidding System Two Packet System Pre-Bid Required Yes Pre-Bid Query Date Time 08/07/2024 12:00 2nd Pre-Bid Conference Required No 2nd Pre-Bid Conference Date Time Not Applicable Tendering Section CE/CON/HQ Bidding Unit Above/Below/Par Publishing Date / Time 14/06/2024 17:14 Period Of Completion 18 Months Bidding Start Date 09/08/2024 Closing Date Time 23/08/2024 12:00 Validity of Offer ( Days) 180 Are Joint Venture (JV) firms allowed to bid - Tender Doc. Cost (Rs.) 0.00 Earnest Money (Rs.) 10638800.00 Description - Civil Engineering Works S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule B-Execution of all works as detailed in schedule 578913300.00 2 Lump Sum 578913300.00 AT Par 578913300.00 More Details Click Here To Open
Tender No: 4500-GRC-CE-C-HQ-43-2024 Dept/Rly: SER-CONST-HQ-ENGG/SOUTH EASTERN RLY Closing Date/Time: 23/08/2024 12:00 Tender Title: Construction and Commissioning of maintenance facilities for Vande Bharat Coaching complex at Shalimar, Howrah (West Bengal) including all Civil, Electrical, Mechanical, Telecom works for South Eastern Railway on EPC mode. Estimate No. 1964W/2024. Tender Type: Open
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description 1 AVANDEBHARATcoachlayoutall.pdf A VANDE BHARAT coach layout 2 BCoachLiftingTacklereferancedwg_compressed.pdf B Coach Lifting Tackle ref drg 3 CBogielayouttrain18.pdf C Bogie layout train 18 4 DShalimarESSdatasheet.pdf D Shalimar ESS data sheet 5 1Workingareaplan.pdf 1 Working area plan 6 2Section-A.pdf 2 Section A 7 3Section-B.pdf 3 Section B 8 4Section-C.pdf 4 Section C 9 5Section-D.pdf 5 Section D 10 6Pneumaticlayoutforshedarea.pdf 6 Pneumatic layout for shed area 11 7PneumaticSectionsforshedarea.pdf 7 Pneumatic Sections for shed area 12 8Firefightingplan.pdf 8 Fire fighting plan 13 9Drinkingwaterlayout.pdf 9 Drinking water layout 14 10Seweragelayout.pdf 10 Sewerage layout 15 11Drainageplan.pdf 11 Drainage plan 16 12STLayout.pdf 12 S and T Layout 17 13Electricallayout7lightingarrangement.pdf 13 Electrical layout 7 lighting arg 18 14Mainshedroofandsidewallsheeting.pdf 14 Main shed roof and side wall she 19 15ESStoPSSPowertappinglayout.pdf 15 ESS to PSS Power tapping layout 20 16Generalsectionsanddetails.pdf 16 General sections and details 21 17Elevationfrontentrancegate.pdf 17 Elevation front entrance gate 22 18Officefloorplan.pdf 18 Office floor plan 23 19EpoxyFloorplan.pdf 19 Epoxy Floor plan 24 20TOILETBLOCKfloorplan.pdf 20 TOILET BLOCK floor plan 25 21Elect.Substation-floorplan.pdf 21 Elect Substation floor plan 26 22PUMPROOMfloorplan.pdf 22 PUMP ROOM floor plan 27 Soil_Report_SHALIMAR_STATION.pdf Soil Report 28 FinalRFPShalimar.pdf RFP Document 29 FinalStandardBidDocShalimar.pdf Final Standard Bid Doc Shalimar
Corrigenda Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued.
S.No Name Date/Time Action No Corrigendum Issued