Tender Details
Deptt./Rly. Unit DANAPUR DIVISION-ELECTRICAL/EAST CENTRAL RLY
Tender No. TRD-DNR-OT-22-24-25
Tender Title (A) Four/six laning of Aunta - Simaria (Ganga Bridge with approach roads) section of NH-31 from km 197.900 to Km 206.050 (design chainage) (Existing chainage km 204.741 to km 209.945) [Total design length 8.15 km] in state of Bihar Hybrid annuity mode [package II] Obstruction due existing overhead pole no 445/29 & 445/30 of Railway for construction of ROB-2 at Km. 202+306 (Rly. Km 445/27-29)-Reg. (B) Four/six laning of Aunta - Simaria (Ganga Bridge with approach roads) section of NH-31 from km 197.900 to Km 206.050 (design chainage) (Existing chainage km 204.741 to km 209.945) [Total design length 8.15 km] in state of Bihar Hybrid annuity mode [package II] Obstruction due existing overhead pole no. 2/18 of Railway for construction of RUB-2 at Km. 201+546(Rly. Km 2/18-19)-Reg. (C) Wiring of Unwired Line Extended Line no. 1 & 4 at Ultratech Siding.
Contract Type Works
Tender Type Open
Advertised Value4375134.07
Bidding Style Single Rate for Each Schedule Item
Bidding System Single Packet System
Pre-Bid Required No
Pre-Bid Query Date Time Not Applicable
Tendering Section ELEC/TRD
Bidding Unit
Publishing Date / Time 25/06/2024 18:50
Period Of Completion 4 Months
Bidding Start Date 04/07/2024
Closing Date Time18/07/2024 12:00
Validity of Offer ( Days)60
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)87500.00
DescriptionFoot by Foot survey and preparation of OHE pegging plan. 2 2 4.00 Per Track KM 8092.40 32369.60 AT Par 32369.60 Rs.
More DetailsClick Here To Open
Tender No:  TRD-DNR-OT-22-24-25 Dept/Rly:  DANAPUR DIVISION-ELECTRICAL/EAST CENTRAL RLY Closing Date/Time:   18/07/2024 12:00
 
Tender Title: (A) Four/six laning of Aunta - Simaria (Ganga Bridge with approach roads) section of NH-31 from km 197.900 to Km 206.050 (design chainage) (Existing chainage km 204.741 to km 209.945) [Total design length 8.15 km] in state of Bihar Hybrid annuity mode [package II] Obstruction due existing overhead pole no 445/29 & 445/30 of Railway for construction of ROB-2 at Km. 202+306 (Rly. Km 445/27-29)-Reg. (B) Four/six laning of Aunta - Simaria (Ganga Bridge with approach roads) section of NH-31 from km 197.900 to Km 206.050 (design chainage) (Existing chainage km 204.741 to km 209.945) [Total design length 8.15 km] in state of Bihar Hybrid annuity mode [package II] Obstruction due existing overhead pole no. 2/18 of Railway for construction of RUB-2 at Km. 201+546(Rly. Km 2/18-19)-Reg. (C) Wiring of Unwired Line Extended Line no. 1 & 4 at Ultratech Siding. Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf GCC dtd 27 04 2022
2 2022_CE-I_CT_GCC-2022Policy14_07_2022ACS-1.pdf Correction Slip 1 dt 14 07 2022
3 2022_12_13RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril2022ACSNo_2.pdf Correction Slip 2 dtd 13 12 2022
4 2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_3ACS-3.pdf Correction Slip 3 dt 26 04 2023
5 2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_4ACS-4.pdf Correction Slip 4 dt 07 08 2023
6 2023_10_20RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_5ACS-53.pdf Correction Slip 5 dt 20 10 2023
7 2023_12_21IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_6ACS-61.pdf Correction Slip 6 dt 21 12 2023
8 2018_CE-I_CT_9Date04_06_2018.pdf Letter of Credit
9 TP-AUNTAbothULTRATECH.pdf TP of Aunta Ultratech
10 ImportantNoticetoBidderAnnexureV.pdf Important Notice to Bidder
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued