Deptt./Rly. Unit GUNTAKAL DIVISION-GATI SHAKTI/SOUTH CENTRAL RLY
Tender No. GTL-GSU-ROB-217-51
Tender Title GUNTAKAL DIVISION : GOOTY- WADI Section: Proposed construction of two lane Road Over Bridge (ROB) in lieu of Manned LC 217 @ km 558/6-7 between MARICHETHAL - RAICHUR Stations (TWO PACKET SYSTEM)
Contract Type Works
Tender Type Open
Advertised Value360127665.15
Bidding Style Single Rate for Each Schedule
Bidding System Two Packet System
Pre-Bid Required No
Pre-Bid Query Date Time Not Applicable
Tendering Section TENDER
Bidding Unit
Publishing Date / Time 28/06/2024 16:35
Period Of Completion 21 Months
Bidding Start Date 17/07/2024
Closing Date Time31/07/2024 11:00
Validity of Offer ( Days)90
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)1950600.00
DescriptionEARTHWORK 2 Please see Item Breakup for details. 37071364.56 AT Par 37071364.56
More DetailsClick Here To Open
Tender No:  GTL-GSU-ROB-217-51 Dept/Rly:  GUNTAKAL DIVISION-GATI SHAKTI/SOUTH CENTRAL RLY Closing Date/Time:   31/07/2024 11:00
 
Tender Title: GUNTAKAL DIVISION : GOOTY- WADI Section: Proposed construction of two lane Road Over Bridge (ROB) in lieu of Manned LC 217 @ km 558/6-7 between MARICHETHAL - RAICHUR Stations (TWO PACKET SYSTEM) Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 DefectsLiability02-06-2023.pdf DEFECTIVE LIABILITY
2 EQUIPMENTCLAUSE.pdf EQUIPMENT CALUSE
3 NewBrandsason24-05-2022.pdf APPROVED BRANDS
4 SPECIALCONDITIONSFORGALVANIZATION.pdf SPECIAL CONDITIONS FOR GALVANI
5 SPECIALCONDITIONSFORLAUNCHINGOFGIRDERS-1.pdf LAUNCHING OF GIRDERS
6 SPECIALCONDITIONSFORMETALISATION.pdf SPECIAL CONDITIONS FOR MATALISA
7 SPECIFICATIONFORSTEELFABRICATION.pdf CONDITIONS FOR FABRICATION
8 WELDINGCONDITIONS.pdf WELDING CONDITIONS
9 specialtenderconditionsofconcretemixdesign_organized.pdf SPECIAL CONDITIONS FOR CONCRETE MIX
10 EarthWork-SpecialConditions.pdf SPECIAL CONDITIONS FOR EARTH
11 SPECIALCONDITIONSFINAL.pdf SPECIAL CONDITIONS
12 FULLDESCRIPTIONOFNSITEMNO.2OFSCHEDULEF.pdf FULL DESCRIPTION OF NS ITEM
13 GENERALCONDITIONS217WITH21MONTHS.pdf GENERAL CONDITIONS
14 GENERALCONDITIONSOFCONTRACT-APRIL-2022.pdf IR GCC
15 AdvanceCorrectionSlipNo.1GCC-2022_2.pdf ACS 1
16 AdvanceCorrectionSlipNo.2GCC-2022.pdf ACS 2
17 AdvanceCorrectionSlipNo.3GCC-2022.pdf ACS 3
18 AdvanceCorrectionSlipNo.4GCC-2022.pdf ACS 4
19 AdvanceCorrectionSlipNo.5GCC-2022.pdf ACS 5
20 GATISHAKTIMASTERDOCUMENT.pdf GATISHAKTI MASTER DOCUMENT
21 MASTERCHECKLIST.pdf MASTER CHECK LIST
22 Rlybdletter28.7.15-Bankguarantee.pdf Rly Bd letter Bank guarantee
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued