Tender Details
Deptt./Rly. Unit STORES/TKJ/RCF
Tender No. 05241581
Tender Title END WALL CONSTRUCTION FOR VANDE BHARAT COACHES
Contract Type Goods
Tender Type Open - Indigenous
Contract CategoryExpenditure
Evaluation Criteria Itemwise
Bidding System Two Packet
Pre-Bid Conference Required No
Pre-Bid Conference Date Time Not Applicable
Tendering Section 05
Inspection Agency TPI Agency
Publishing Date / Time 05/07/2024 14:04
Procure From Approved Sources Yes
Approving Agency RCF
Closing Date Time05/08/2024 14:30
Validity of Offer ( Days)90
Ranking Order for BidsLowest to Highest
Advertised Value
Tender Doc. Cost (INR)0.00
Earnest Money (INR)1291950.00 Initial Financial Offer Required Yes Auto Elimination rules applicable For all vendors (Bulk/developmental) Initial Cooling Off Period (HH:MM) 02:00 Subsequent Cooling Off Period (HH:MM) 00:30 Succesive Lots Closing Interval (Min.) 30 Minimum Decrement (%) 0.25 Vendor Categories Bulk/Developmental Item Category General Allow Next Bid Lower Than Current Lowest Bid (Subject to Min. Decrement)
DescriptionEND WALL CONSTRUCTION COMPLETE -NPP END FOR VANDE BHARAT DTC COACHES NOTE:(1)IN DRAWINGS "MIG WELDING (131) IS TO BE READ AS TIG WELDING (141)" AS PER DESIGN L ETTER NO. MD46231 DATED 16.03.2024. (2)FIRM SHALL COLLECT ALL LATEST/FINAL DRAWINGS BEF ORE MANUFACTURING. THERE MAY BE MINOR MODIFICATION IN DESIGN TO SUIT RALWAY REQUIR EMENT & MODIFICATION TO BE CARRIED OUT BY FIRM AT NO FURTHER COST TO RAILWAY., as per Drawing: 89115002 ALT 'a', Packing Instruction: NO SPECIAL PACKING REQUIRED [ Warranty Period: 30 M onths after the date of delivery ]
More DetailsClick Here To Open
Tender No:  05241581 Dept/Rly:  STORES/TKJ/RCF Closing Date/Time:   05/08/2024 14:30
 
Tender Title: END WALL CONSTRUCTION FOR VANDE BHARAT COACHES Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 4996327.pdf set list 2
2 4996285.pdf set list
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued