Deptt./Rly. Unit | SCR-CONST-HQ-ENGG/SOUTH CENTRAL RLY |
Tender No. | 23-CAO-C-SC-2024 |
Tender Title | SCR Construction Organisation: Secunderabad Division - Proposed 3rd line with electrification between Kazipet - Kondapalli stations - Balance works of Earth work in formation, retaining walls, drains, extension of minor bridges, construction of RBG building, supply of ballast, laying and linking of track and other connected miscellaneous works between Errupalem and Dornakal stations |
Contract Type | Works |
Tender Type | Open |
Advertised Value | 217756386.60 |
Bidding Style | Single Rate for Each Schedule |
Bidding System | Two Packet System |
Pre-Bid Required | No |
Pre-Bid Query Date Time | Not Applicable |
Tendering Section | GENERAL |
Bidding Unit | |
Publishing Date / Time | 08/07/2024 19:04 |
Period Of Completion | 6 Months |
Bidding Start Date | 16/07/2024 |
Closing Date Time | 30/07/2024 15:00 |
Validity of Offer ( Days) | 90 |
Are Joint Venture (JV) firms allowed to bid | - |
Tender Doc. Cost (Rs.) | 0.00 |
Earnest Money (Rs.) | 1238800.00 |
Description | Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, mechanical compaction to specified density and dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines. Using Soil Class SQ1 2 012011 7260.00 cum 104.10 755766.00 AT Par 755766.00 |