S.No |
File Name |
Document Description |
1
|
1-Safetyrules.pdf
|
Saftey Rule
|
2
|
2-guidelineforelectricalcondition.pdf
|
Guideline for electrial connection
|
3
|
3-JPOSTandElectfordiggingwork.pdf
|
JPO for cable digging
|
4
|
NOrelativecertificate.pdf
|
No relative certificate
|
5
|
ProcedureforpaymentofContractorbillasperGST.pdf
|
Procedure of payment of Contractor bill post GST
|
6
|
Letterofcreditasmodeofpayment_1.pdf
|
Letter of Credit
|
7
|
PCEletterEMDPGSD.pdf
|
PCE letter EMD PG SD
|
8
|
ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.2022_1.pdf
|
GCC correction slip No. 2 dtd.13.12.2022
|
9
|
ACS-4.pdf
|
correction slip ACS-4 GCC
|
10
|
NoRetiredRailwayEmployeeGCCApril2022.pdf
|
NO RETIRED RAILWAY EMPLOYEE GCC 2022
|
11
|
PerformanceSecuritydtd.30.12.2021.pdf
|
Performance Security Rly Board Letter
|
12
|
ACS-3.pdf
|
correction slip ACS-3 GCC
|
13
|
GCC_April-2022ACS14.07.2022.pdf
|
GCC April 2022 with correction slip 14.07.2022
|
14
|
Annexure-VIBAnnualContractualTurnover.pdf
|
ANNEXURE VIB ANNUAL CONTRACTUAL TURNOVER GCC 2022
|
15
|
PBGProformaGCC2022.pdf
|
PBG PROFORMA
|
16
|
GCC_April-2022ACS14.07.2022-PVCClause.pdf
|
GCC April 2022 ACS 14.07.22 PVC Clause
|
17
|
BIDCAPACITY_2.pdf
|
BID CAPACITY 20CR ANNEXURE-VI AS PER CORRECTION SL......
|
18
|
2022-CE-I-CT-GCCCorrespondencedated.14.05.2024.pdf
|
Clarification regarding submission of Annexure-V
|
19
|
2024-CE-I-CAOCWorkshop-part-2.pdf
|
JPO for digging work close to Rly. signalling etc
|
20
|
SpecialTechnicalconditionsScopeCivilportion.pdf
|
Special Technical conditions scope
|
21
|
JPOforCompositeTenderofCivilElectricalworksforBuildingWorks2.pdf
|
JPO for composite tender
|
22
|
ScopeofworkPower1.pdf
|
Electrical scope and condition
|
23
|
DrawingDesigncondition.pdf
|
Drawing and design condition
|