Deptt./Rly. Unit SALEM DIVISION-ENGINEERING/SOUTHERN RLY
Tender No. SA-OT-09-2024-07
Tender Title (i) Construction of LUS in lieu of LC no-50 @ km 97/700-800 between ED-TP section, (ii) Construction of LUS in lieu of LC no-55 @ km 105/700-800 between ED-TP section;
Contract Type Works
Tender Type Open
Advertised Value56727763.92
Bidding Style Single Rate for Each Schedule Item
Bidding System Single Packet System
Pre-Bid Required No
Pre-Bid Query Date Time Not Applicable
Tendering Section BRIDGE
Bidding Unit
Publishing Date / Time 19/07/2024 17:29
Period Of Completion 9 Months
Bidding Start Date 29/07/2024
Closing Date Time12/08/2024 14:00
Validity of Offer ( Days)60
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)433600.00
DescriptionPLEASE SEE THE DETAILS IN THE ITEM BREAK UP S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule B-Items of works that are NOT covered by the Southern Railway USSOR 2021 vide Schedule 'B' applicable. 8316626.00 1 1 2.00 Each 5250.00 10500.00 AT Par 10500.00 Rs.
More DetailsClick Here To Open
Tender No:  SA-OT-09-2024-07 Dept/Rly:  SALEM DIVISION-ENGINEERING/SOUTHERN RLY Closing Date/Time:   12/08/2024 14:00
 
Tender Title: (i) Construction of LUS in lieu of LC no-50 @ km 97/700-800 between ED-TP section, (ii) Construction of LUS in lieu of LC no-55 @ km 105/700-800 between ED-TP section; Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 GCCApril2022NEW.pdf GCC 2022 NEW
2 INSTRUCTIONSTOTHETENDERER.pdf INSTRUCTIONS TO THE TENDERER
3 ProcedureforLetterofCredit.pdf PROCEDURE FOR LC MODE OF PAYMENT
4 Workonhanddetails.pdf Works on hand details
5 SafetyprecautionstobeadoptedwhileworkinginElectrifiedArea.pdf Safety precautions to be adopted
6 Splconditionsofcontractformovementofvehicle.pdf Spl conditions of contract for move
7 ANNEXUREVVAVIAVIB.pdf ANNEXURE V VA VI A and VI B
8 CheckListandNEFTform.pdf Check List and NEFT form
9 TrackStandardDocument20122022.pdf SCC OF TRACK
10 SCCOFLUS.pdf SCC OF LUS
11 SPECIFICATIONFORBUILDINGSBRIDGEWORKSNOV2023.pdf Building and Bridge Standard Doc
12 RBCECEICTImplementationofContractoremb.pdf Implementation of E MB
13 ACS1TO4.pdf ADVANCE CORRECTION SLIP 1 TO 4
14 ACS5TO6.pdf ADVANCE CORRECTION SLIP 5 AND 6
15 RlyBdletterClarificationofAnnexureV.pdf Clarification of Annexure V
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued