Tender Details
Deptt./Rly. Unit METRO-KOL-HQ-ENGG/METRO RAILWAY
Tender No. EPC-2489-2024
Tender Title Design, Procurement & Construction of RCC Box Metro tunnel including Birati UG Station building & Subways (with Entry-Exit Structures) for two underground Metro Stations (Birati & Michael Nagar) by Cut & Cover Method (Top Down with Diaphragm Wall/ Bottom Up Method with support arrangement) including architectural finishing, firefighting, water supply, sanitary installation, drainage & BLT works, E&M service, ECS Service, TVS Services, Power Supply System with 750 V DC Traction System including composite Aluminium third Rail from Ch: 6.250 Km to Ch: 9.840 Km including all ancillary works in connection with extension of Metro Railway from Noapara to Barasat via Bimanbandar.
Contract Type Works
Tender Type Open
Advertised Value13304700000.00
Bidding Style Single Rate for Each Schedule
Bidding System Two Packet System
Pre-Bid Required Yes
Pre-Bid Query Date Time 06/09/2024 11:00 2nd Pre-Bid Conference Required No 2nd Pre-Bid Conference Date Time Not Applicable
Tendering Section DY.CE CON3
Bidding Unit
Publishing Date / Time 31/07/2024 19:36
Period Of Completion 910 Days
Bidding Start Date 22/10/2024
Closing Date Time05/11/2024 12:00
Validity of Offer ( Days)180
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)20000000.00
Description- A. Detailed Design & Drawings and Proof checking 2 Lump Sum 7996917579.00 AT Par 7996917579.00
More DetailsClick Here To Open
Tender No:  EPC-2489-2024 Dept/Rly:  METRO-KOL-HQ-ENGG/METRO RAILWAY Closing Date/Time:   05/11/2024 12:00
 
Tender Title: Design, Procurement & Construction of RCC Box Metro tunnel including Birati UG Station building & Subways (with Entry-Exit Structures) for two underground Metro Stations (Birati & Michael Nagar) by Cut & Cover Method (Top Down with Diaphragm Wall/ Bottom Up Method with support arrangement) including architectural finishing, firefighting, water supply, sanitary installation, drainage & BLT works, E&M service, ECS Service, TVS Services, Power Supply System with 750 V DC Traction System including composite Aluminium third Rail from Ch: 6.250 Km to Ch: 9.840 Km including all ancillary works in connection with extension of Metro Railway from Noapara to Barasat via Bimanbandar. Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 REQUESTFORPROPOSAL.pdf PART I REQUEST FOR PROPOSAL
2 EMPLOYERSREQUIREMENT.pdf PART 3 1 of 7 EMPLOYERS REQUIREMENT
3 SAFETYHEALTHENVIRONMENTREQUIREMENTS.pdf PART 3 1 of 7 SHE CONDITION OF CONT
4 OUTLINEDESIGNSPECIFICATIONS-CIVIL.pdf PART 3 2 of 7 ODS CIVIL
5 OUTLINEDESIGNSPECIFICATIONS-ARCHITECTURE.pdf PART 3 2 of 7 ODS ARCHITECTURE
6 OUTLINECONSTRUCTIONSPECIFICATION_ARCHITECTURALFINISHES.pdf PART 3 3 of 7 OCS ARCHITECTURAL
7 OutlineConstructionSpecification-Civilworks.pdf PART 3 3 of 7 OCS CIVIL WORKS
8 ALIGNMENTPLANLSECTION-DNLINECH7.0KMTOCH8.0KM.pdf PART 3 4 of 7 ALIG PLAN DN 7 TO 8KM
9 ALIGNMENTPLANLSECTION-DNLINECH8.0KMTOCH9.0KM.pdf PART 3 4 of 7 ALIG PLAN DN 8 TO 9KM
10 ALIGNMENTPLANLSECTION-DNLINECH9.0KMTOCH10.0KM.pdf PART 3 4 of 7 ALIG PLAN DN 9 TO10KM
11 ALIGNMENTPLANLSECTION-UPLINECH7.0KMTOCH8.0KM.pdf PART 3 4 of 7 ALIG PLAN UP 7 TO 8KM
12 ALIGNMENTPLANLSECTION-UPLINECH8.0KMTOCH9.0KM.pdf PART 3 4 of 7 ALIG PLAN UP 8 TO 9KM
13 ALIGNMENTPLANLSECTION-UPLINECH9.0KMTOCH10.0KM.pdf PART 3 4 of 7 ALIG PLAN UP 9 TO10KM
14 ESP_BIMANBANDAR_2A.pdf PART 3 4 of 7 ESP BIMANBANDAR 2A
15 ESP_BIMANBANDAR_2B.pdf PART 3 4 of 7 ESP BIMANBANDAR 2B
16 ESP_BIRATI.pdf PART 3 4 of 7 ESP BIRATI
17 ESP_MICHAELNAGAR.pdf PART 3 4 of 7 ESP MICHAEL NAGAR
18 Biratistation1.pdf PART 3 4 of 7 TENDER DRG BIRATI 1
19 Biratistation2.pdf PART 3 4 of 7 TENDER DRG BIRATI 2
20 Biratistation3.pdf PART 3 4 of 7 TENDER DRG BIRATI 3
21 Biratistation4.pdf PART 3 4 of 7 TENDER DRG BIRATI 4
22 MichaelNagar_Station1.pdf PART 3 4 of 7 TENDER DRG MNS 1
23 MichaelNagar_Station2.pdf PART 3 4 of 7 TENDER DRG MNS 2
24 MichaelNagar_Station3.pdf PART 3 4 of 7 TENDER DRG MNS 3
25 MichaelNagar_Station4.pdf PART 3 4 of 7 TENDER DRG MNS 4
26 8.3TO8.795ALIGNMENT.pdf PART 3 4 of 7 ALIGN 8300 TO 8795M
27 BLTDRG.pdf PART 3 4 of 7 TENDER DRG FOR BLT
28 ElectricalSchematics.pdf PART 3 4 of 7 ELEC SCHEMATIC
29 Structuraldrawings.pdf PART 3 4 of 7 STRUCTURAL DRGS
30 Typicaldrawingfordrainculvertfirecompartmentation.pdf PART 3 4 of 7 TYPICAL DRGS
31 SouthTrafficGuardArchitectural.pdf PART 3 4 of 7 DRGS S T Guard 1
32 SouthTrafficGuardStructuralsheet1of2.pdf PART 3 4 of 7 DRGS S T Guard 2
33 SouthTrafficGuardStructuralsheet2of2.pdf PART 3 4 of 7 DRGS S T Guard 3
34 Authority_soffice.pdf PART 3 4 of 7 AUTHORITY OFFICE DRG
35 Survey_drawings-1.pdf PART 3 5 of 7 SURVEY DRAWINGS 1
36 Survey_drawings-2.pdf PART 3 5 of 7 SURVEY DRAWINGS 2
37 Survey_drawings-3.pdf PART 3 5 of 7 SURVEY DRAWINGS 3
38 Survey_drawings-4.pdf PART 3 5 of 7 SURVEY DRAWINGS 4
39 Survey_drawings-5.pdf PART 3 5 of 7 SURVEY DRAWINGS 5
40 Survey_drawings-6.pdf PART 3 5 of 7 SURVEY DRAWINGS 6
41 Survey_drawings-7.pdf PART 3 5 of 7 SURVEY DRAWINGS 7
42 Survey_drawings-8.pdf PART 3 5 of 7 SURVEY DRAWINGS 8
43 TOPOGRAPHICALSURVEYREPORT_1.pdf PART 3 5 of 7 TOPO SURVEY REPORT
44 Volume-I_BoreHolesandFieldPermeabilityTest_Part-1-1.pdf PART 3 6 of 7 GIR VOL I PT I 1
45 Volume-I_BoreHolesandFieldPermeabilityTest_Part-1-2.pdf PART 3 6 of 7 GIR VOL I PT I 2
46 Volume-I_BoreHolesandFieldPermeabilityTest_Part-1-3.pdf PART 3 6 of 7 GIR VOL I PT I 3
47 Volume-I_BoreHolesandFieldPermeabilityTest_Part-1-4.pdf PART 3 6 of 7 GIR VOL I PT I 4
48 Volume-I_BoreHolesandFieldPermeabilityTest_Part-1-5.pdf PART 3 6 of 7 GIR VOL I PT I 5
49 Volume-I_BoreHolesandFieldPermeabilityTest_Part-1-6.pdf PART 3 6 of 7 GIR VOL I PT I 6
50 Volume-I_BoreHolesandFieldPermeabilityTest_Part-1-7.pdf PART 3 6 of 7 GIR VOL I PT I 7
51 Volume-I_BoreHolesandFieldPermeabilityTest_Part-1-8.pdf PART 3 6 of 7 GIR VOL I PT I 8
52 Volume-I_BoreHolesandFieldPermeabilityTest_Part-1-9.pdf PART 3 6 of 7 GIR VOL I PT I 9
53 Volume-I_BoreHolesandFieldPermeabilityTest_Part-1-10.pdf PART 3 6 of 7 GIR VOL I PT I 10
54 Volume-I_BoreHolesandFieldPermeabilityTest_Part-1-11.pdf PART 3 6 of 7 GIR VOL I PT I 11
55 Volume-I_BoreHolesandFieldPermeabilityTest_Part-1-12.pdf PART 3 6 of 7 GIR VOL I PT I 12
56 Volume-I_BoreHolesandFieldPermeabilityTest_Part-1-13.pdf PART 3 6 of 7 GIR VOL I PT I 13
57 Volume-I_BoreHolesandFieldPermeabilityTest_Part-2-1.pdf PART 3 6 of 7 GIR VOL I PT II 1
58 Volume-I_BoreHolesandFieldPermeabilityTest_Part-2-2.pdf PART 3 6 of 7 GIR VOL I PT II 2
59 Volume-I_BoreHolesandFieldPermeabilityTest_Part-2-3.pdf PART 3 6 of 7 GIR VOL I PT II 3
60 Volume-I_BoreHolesandFieldPermeabilityTest_Part-2-4.pdf PART 3 6 of 7 GIR VOL I PT II 4
61 Volume-I_BoreHolesandFieldPermeabilityTest_Part-2-5.pdf PART 3 6 of 7 GIR VOL I PT II 5
62 Volume-I_BoreHolesandFieldPermeabilityTest_Part-2-6.pdf PART 3 6 of 7 GIR VOL I PT II 6
63 Volume-I_BoreHolesandFieldPermeabilityTest_Part-2-7.pdf PART 3 6 of 7 GIR VOL I PT II 7
64 Volume-I_BoreHolesandFieldPermeabilityTest_Part-2-8.pdf PART 3 6 of 7 GIR VOL I PT II 8
65 Volume-I_BoreHolesandFieldPermeabilityTest_Part-2-9.pdf PART 3 6 of 7 GIR VOL I PT II 9
66 Volume-II_PressureMeterTest_Part-1-1.pdf PART 3 6 of 7 GIR VOL II PT I 1
67 Volume-II_PressureMeterTest_Part-1-2.pdf PART 3 6 of 7 GIR VOL II PT I 2
68 Volume-II_PressureMeterTest_Part-1-3.pdf PART 3 6 of 7 GIR VOL II PT I 3
69 Volume-II_PressureMeterTest_Part-1-4.pdf PART 3 6 of 7 GIR VOL II PT I 4
70 Volume-II_PressureMeterTest_Part-1-5.pdf PART 3 6 of 7 GIR VOL II PT I 5
71 Volume-II_PressureMeterTest_Part-2-1.pdf PART 3 6 of 7 GIR VOL II PT II 1
72 Volume-II_PressureMeterTest_Part-2-2.pdf PART 3 6 of 7 GIR VOL II PT II 2
73 Volume-II_PressureMeterTest_Part-2-3.pdf PART 3 6 of 7 GIR VOL II PT II 3
74 Volume-II_PressureMeterTest_Part-2-4.pdf PART 3 6 of 7 GIR VOL II PT II 4
75 Volume-II_PressureMeterTest_Part-2-5.pdf PART 3 6 of 7 GIR VOL II PT II 5
76 Volume-II_PressureMeterTest_Part-2-6.pdf PART 3 6 of 7 GIR VOL II PT II 6
77 GIR-VollIII-1_1.pdf PART 3 6 of 7 GIR VOL III 1
78 GIR-VollIII-2.pdf PART 3 6 of 7 GIR VOL III 2
79 GIR-VollIII-3.pdf PART 3 6 of 7 GIR VOL III 3
80 GIR-VollIII-4.pdf PART 3 6 of 7 GIR VOL III 4
81 GIR-VollIII-5.pdf PART 3 6 of 7 GIR VOL III 5
82 GIR-VollIII-6.pdf PART 3 6 of 7 GIR VOL III 6
83 GIR-VollIII-7.pdf PART 3 6 of 7 GIR VOL III 7
84 GeotechnicalParameter.pdf PART 3 6 of 7 GIR Geotechnical Para
85 AppendixEL-01Schedule-B._1.pdf PART 3 7 of 7 APPENDIX EL 01
86 AppendixEL-02Schedule-D-1.pdf PART 3 7 of 7 APPENDIX EL 02 1
87 AppendixEL-02Schedule-D-2.pdf PART 3 7 of 7 APPENDIX EL 02 2
88 AppendixEL-03Preferedmakes.pdf PART 3 7 of 7 APPENDIX EL 03
89 AppendixEL-04CFDand1-Dreport.pdf PART 3 7 of 7 APPENDIX EL 04
90 AppendixEL-05SLD.pdf PART 3 7 of 7 APPENDIX EL 05
91 AppendixEL-06-Signages_1.pdf PART 3 7 of 7 APPENDIX EL 06 1
92 AppendixEL-06-Signages_2.pdf PART 3 7 of 7 APPENDIX EL 06 2
93 AppendixEL-06-Signages_3.pdf PART 3 7 of 7 APPENDIX EL 06 3
94 AppendixEL-0766kVDCcableSpec.pdf PART 3 7 of 7 APPENDIX EL 07
95 AppendixEL-08AlLTcable.pdf PART 3 7 of 7 APPENDIX EL 08
96 AppendixEL-09AlZHLScable.pdf PART 3 7 of 7 APPENDIX EL 09
97 AppendixEL-10LTFScable.pdf PART 3 7 of 7 APPENDIX EL 10
98 AppendixEL-11LTZHLSCucable.pdf PART 3 7 of 7 APPENDIX EL 11
99 AppendixEL-1233kV-Ammendmnt-3.pdf PART 3 7 of 7 APPENDIX EL 12
100 DRAFT_EPC_AGREEMENT_1.pdf PART 2 DRAFT EPC AGREEMENT
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued