|
||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||
|
Tender Details Deptt./Rly. Unit DYCE-C-II-JHS-ENGG/NORTH CENTRAL RLY Tender No. DY-CE-C-II-JHS-2024-03 Tender Title Shifting of water pipeline lying along track in the alignment of proposed double line & construction of various buildings such as Gate Lodge, IBH, SP/SSP etc. in JHS-BWR section of JHS-KID & MKP-BZM doubling project. Contract Type Works Tender Type Open Advertised Value 381509233.65 Bidding Style Single Rate for Each Schedule Bidding System Two Packet System Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Tendering Section RATE Bidding Unit Publishing Date / Time 10/08/2024 18:02 Period Of Completion 12 Months Bidding Start Date 23/08/2024 Closing Date Time 06/09/2024 15:00 Validity of Offer ( Days) 90 Are Joint Venture (JV) firms allowed to bid - Tender Doc. Cost (Rs.) 0.00 Earnest Money (Rs.) 2057600.00 Description Carriage of Materials 2 Please see Item Breakup for details. 22441650.00 AT Par 22441650.00 More Details Click Here To Open
Tender No: DY-CE-C-II-JHS-2024-03 Dept/Rly: DYCE-C-II-JHS-ENGG/NORTH CENTRAL RLY Closing Date/Time: 06/09/2024 15:00 Tender Title: Shifting of water pipeline lying along track in the alignment of proposed double line & construction of various buildings such as Gate Lodge, IBH, SP/SSP etc. in JHS-BWR section of JHS-KID & MKP-BZM doubling project. Tender Type: Open
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description 1 CONDITIONLETTEROFCREDIT.pdf Condition of letter of credit 2 ANNEXURE1.pdf Annexure 1 3 AnnexureVIB.pdf Annexure VI B 4 AnnexureVIA.pdf Annexure VI A 5 BrandsofmaterialsintendersofDSR-CPWD.pdf Brands of materials in tenders 6 PCEcircular.pdf PCE Circular 103 Revised 7 GCC-2022-ACS62.pdf GCC 2022 up to correction slip no 6 8 ANNEXURE-VA.pdf Annexure VA 9 TDPipelineshiftingfinal10.08.2024.pdf Tender Document
Corrigenda Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued.
S.No Name Date/Time Action No Corrigendum Issued