|
||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||
|
Tender Details Deptt./Rly. Unit DYCEE-C-CNB-ELECTRICAL/NORTH CENTRAL RLY Tender No. DyCEE-C-CNB-24-25-T-133 Tender Title 25 kV OHE modification work due to construction of ROBs/RUBs at different location under jurisdiction of Dy.CEE/C/CNB Contract Type Works Tender Type Open Advertised Value 35886513.21 Bidding Style Single Rate for Each Schedule Bidding System Single Packet System Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Tendering Section DYCEECCNB Bidding Unit Publishing Date / Time 12/08/2024 20:15 Period Of Completion 12 Months Bidding Start Date 21/08/2024 Closing Date Time 04/09/2024 15:00 Validity of Offer ( Days) 60 Are Joint Venture (JV) firms allowed to bid - Tender Doc. Cost (Rs.) 0.00 Earnest Money (Rs.) 329400.00 Description Section-01(General) S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule 02-Section-02(Concrete) 3233545.34 Above/ Below/Par 02 Please see Item Breakup for details. 547780.00 490.30 3233545.34 More Details Click Here To Open
Tender No: DyCEE-C-CNB-24-25-T-133 Dept/Rly: DYCEE-C-CNB-ELECTRICAL/NORTH CENTRAL RLY Closing Date/Time: 04/09/2024 15:00 Tender Title: 25 kV OHE modification work due to construction of ROBs/RUBs at different location under jurisdiction of Dy.CEE/C/CNB Tender Type: Open
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description 1 GCCApril2022.pdf GCC April 2022 2 GCCApril2022ACS-01.pdf GCC April 2022 ACS01 3 GCCApril2022ACS-02.pdf GCC April 2022 ACS02 4 GCCApril2022ACS-03.pdf GCC April 2022 ACS03 5 GCCApril2022ACS-04.pdf GCC April 2022 ACS04 6 GCCApril2022ACS-05.pdf GCC April 2022 ACS05 7 GCCApril2022ACS-06.pdf GCC April 2022 ACS06 8 T-133Document.pdf Tender Document 9 2023_09_05RBCE_CE-I-CTSystemofVerificationofTendererCredentials.pdf System of Verification
Corrigenda Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued.
S.No Name Date/Time Action No Corrigendum Issued