Tender Details |
Deptt./Rly. Unit | SCR-CONST-HQ-ENGG/SOUTH CENTRAL RLY |
Tender No. | 26-CAO-C-SC2024 |
Tender Title | "SCR Construction Organisation-Guntakal division - New BG line between Guntakal west & Mallappa Gate stations with Rail over Rail(RoR) connectivity (9.64 Km) - i) Proposed Guntakal West yard remodeling - (a) Earthwork information including blanketing to IRDGE-0004 specifications,(b) Construction of Major & Minor bridges,(c) Construction of station building & Goomties, (d) Laying & linking of Track, slewing/regarding/CTRP of existing track and other balance works at Guntakal West yard and ii) Proposed Mallappa Gate yard remodeling- a) Earthwork in formation including blanketing to IRS: GE-0004 specifications, b) Construction of Minor Bridges, c) Laying & linking of track, slewing/regarding /CTRP of existing track and other miscellaneous works within Mallappa Gate yard." |
Contract Type | Works |
Tender Type | Open |
Advertised Value | 391204236.38 |
Bidding Style | Single Rate for Each Schedule |
Bidding System | Two Packet System |
Pre-Bid Required | No |
Pre-Bid Query Date Time | Not Applicable |
Tendering Section | GENERAL |
Bidding Unit | |
Publishing Date / Time | 23/08/2024 17:03 |
Period Of Completion | 12 Months |
Bidding Start Date | 03/09/2024 |
Closing Date Time | 17/09/2024 15:00 |
Validity of Offer ( Days) | 90 |
Are Joint Venture (JV) firms allowed to bid | - |
Tender Doc. Cost (Rs.) | 0.00 |
Earnest Money (Rs.) | 2106000.00 |
Description | Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, mechanical compaction to specified density a n d dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines. Using Soil Class SQ1 2 011032 33800.00 cum 268.50 9075300.00 AT Par 9075300.00 |
More Details | Click Here To Open |