|
|||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||
|
Tender Details Deptt./Rly. Unit MUMBAI- CST-DIVISION-ENGG/CENTRAL RLY Tender No. CR-DRMWBB-2024-21-09 Tender Title A) KJT-LNL : Remedial measures for sinking formation at Tata Bridge Km 121/200-400 MID and UP on Karjat-Lonavla Section by Construction of a CC wall at the toe level to protect the bank extending from the PA end abutment of the TATA bridge towards Bridge 121/2. B) KJT-LNL : Remedial measures for sinking formation at Km 121/300-400 MID on Karjat- Lonavala section. C) Rehabilitation of Tunnel No. 13 by providing rockbolting, shotcreting, boulder netting, retaining wall on portal face, improvement to side drain in SE ghat section. D)(a) Proposed extension of portal by 24m towards BB end on Tunnel No.44 on single line (DN & MID) and by 21m towards BB end of Tunnel 41 on single line (MID) to prevent boulder falling on track on MID & DN line between TKW-MHC in SE ghat section. (b) Protection of landslide location at Km 116/900 at 100m above Rail level by using geomate & self drilling anchors. Contract Type Works Tender Type Open Advertised Value 150280471.44 Bidding Style [ Decision at Schedule level ] Bidding System Two Packet System Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Tendering Section SR DEN SE Bidding Unit Publishing Date / Time 29/08/2024 18:57 Period Of Completion 12 Months Bidding Start Date 16/09/2024 Closing Date Time 30/09/2024 11:00 Validity of Offer ( Days) 90 Are Joint Venture (JV) firms allowed to bid - Tender Doc. Cost (Rs.) 0.00 Earnest Money (Rs.) 901400.00 Description MS Items S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule A2-Remedial measures for sinking formation at Tata Bridge Km 121/200-400 MID and UP on Karjat-Lonavla Section by Construction of a CC wall at the toe level to protect the bank extending from the PA end abutment of the TATA bridge towards Bridge 121/2. 72355.96 Above/ Below/Par 1 Please see Item Breakup for details. 70248.50 3.00 72355.96 More Details Click Here To Open
Tender No: CR-DRMWBB-2024-21-09 Dept/Rly: MUMBAI- CST-DIVISION-ENGG/CENTRAL RLY Closing Date/Time: 30/09/2024 11:00 Tender Title: A) KJT-LNL : Remedial measures for sinking formation at Tata Bridge Km 121/200-400 MID and UP on Karjat-Lonavla Section by Construction of a CC wall at the toe level to protect the bank extending from the PA end abutment of the TATA bridge towards Bridge 121/2. B) KJT-LNL : Remedial measures for sinking formation at Km 121/300-400 MID on Karjat-Lonavala section. C) Rehabilitation of Tunnel No. 13 by providing rockbolting, shotcreting, boulder netting, retaining wall on portal face, improvement to side drain in SE ghat section. D)(a) Proposed extension of portal by 24m towards BB end on Tunnel No.44 on single line (DN & MID) and by 21m towards BB end of Tunnel 41 on single line (MID) to prevent boulder falling on track on MID & DN line between TKW-MHC in SE ghat section. (b) Protection of landslide location at Km 116/900 at 100m above Rail level by using geomate & self drilling anchors. Tender Type: Open
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description 1 GHATSPECIFICATION1.pdf Ghat Specification 2 ScopePartBTunnelNo13.pdf Scope of work 3 GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf GCC 2022 4 GCCASC1234.pdf GCC ACS 1 to 4 5 ACS5.pdf GCC ACS 5 6 ASC6.pdf GCC ACS 6 7 Annexure-VIB.pdf Annexure VIB 8 Annexure-VA.pdf Anexure VA 9 CivilConditions_1.pdf Civil Condition 10 splconditionworksiteselectricterritory.pdf Electric site conditions 11 ChecklistfordocumentforCivilandtrackworks1.pdf Checklist for civil works 12 Scopeofworksinkingformation.pdf Scope of work Sinking formation 13 ScopeopfworkTataBridge121-200.pdf Scope of work Tata bridge 14 TenderformTunnel.pdf Tender form
Corrigenda Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued.
S.No Name Date/Time Action No Corrigendum Issued