Tender Details
Deptt./Rly. Unit HOWRAH DIVISION-GATI SHAKTI/EASTERN RLY
Tender No. 03_2024-25
Tender Title Construction of By-pass line between Nalhati-Pakur & Nalhati-Azimganj for undertaking movement for coal rakes originating from Pakur area for the Sagardighi TPS under CPM/GSU/HWH.
Contract Type Works
Tender Type Open
Advertised Value661063287.88
Bidding Style Single Rate for Each Schedule
Bidding System Two Packet System
Pre-Bid Required No
Pre-Bid Query Date Time Not Applicable
Tendering Section GSU/HWH
Bidding Unit
Publishing Date / Time 11/09/2024 20:26
Period Of Completion 12 Months
Bidding Start Date 20/09/2024
Closing Date Time04/10/2024 12:00
Validity of Offer ( Days)60
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)3455300.00
DescriptionSchedule A (Sch Item-USSOR 2021 Items) S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule B-Schedule B (Sch item-DSR-2021 Items) 187726625.32 Above/ Below/Par 001 Please see Item Breakup for details. 201856586.37 (-) 7.00 187726625.32
More DetailsClick Here To Open
Tender No:  03_2024-25 Dept/Rly:  HOWRAH DIVISION-GATI SHAKTI/EASTERN RLY Closing Date/Time:   04/10/2024 12:00
 
Tender Title: Construction of By-pass line between Nalhati-Pakur & Nalhati-Azimganj for undertaking movement for coal rakes originating from Pakur area for the Sagardighi TPS under CPM/GSU/HWH. Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 GCC.pdf General Code of Conduct
2 GCCcorrectionslip1.pdf Correction slip 1
3 ACS2.pdf Corection slip 2
4 ACCNo.41new11.pdf Correction slip 4
5 CheckList.pdf Checklist
6 Annexure-I-III.pdf Annexure I II III
7 Annexure-IVVIIVIIIX.pdf Annexure IV VII VIII IX X
8 AnnexureV.pdf Annexure V
9 Annexure_VA.pdf Annexure V A
10 Annexure-VI.pdf Annexure VI
11 Annexure-VIA.pdf Annexure VI A
12 Annexure-VIB.pdf Annexure VI B
13 Tenderdocumentof03_2024-25.pdf Tender documents
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued