|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Tender Details Deptt./Rly. Unit DYCE-C-I-AGC-ENGINEERING/NORTH CENTRAL RLY Tender No. CEN00AGC1624 Tender Title Construction of two lane ROB in lieu of LC no 469 by providing 1x54.00 m Bow string Girder at km-1300/10-12 between Mania-Dholpur station of AGC-DHO section, two lane ROB in lieu of LC 3AB betweenTDL- JAB in Agra Tundla Section by providing 42 m Bowstring and 18 m Composite Girder, Construction of ROB at LC no 18 at Km 25/4-5 on IDH-BKI section ( IN ACHHNERA YARD). Contract Type Works Tender Type Open Advertised Value 1075034259.43 Bidding Style Single Rate for Each Schedule Bidding System Two Packet System Pre-Bid Required Yes Pre-Bid Query Date Time 18/09/2024 12:00 Tendering Section RATES SEC Bidding Unit Publishing Date / Time 12/09/2024 18:01 Period Of Completion 24 Months Bidding Start Date 24/09/2024 Closing Date Time 08/10/2024 15:00 Validity of Offer ( Days) 90 Are Joint Venture (JV) firms allowed to bid - Tender Doc. Cost (Rs.) 0.00 Earnest Money (Rs.) 5525200.00 Description Designing, providing and erection of specified grade precast RCC facia panels of thickness 180 mm made with M:35 Grade concrete batching plant, transit mixer, concrete pump and vibrator for retaining earth with all elements and accessories including reinforcing element complete as per approved drawing and clause 3100 of MoRT&H specification including all material, labour, machinery etc (Scope of work includes designing, getting approval, casting in yard curing storing, transporting, lifting, placing in position, erection with all necessary fasteners etc. complete). The cost of Cement & Steel are included in this item & no separate payment shall be paid whatsoever. Mode of Payment (a) Casting of RE Panels / Blocks :- 60% (b) Erection and fixing :- 35%. (c) Final bill :- 5% Note-The payment of excavation, foundation concrete, rain reinforcement element, fastener, drainage layer, drain pipe, coping beam and other accessories shall not be measured separately it is deemed to have been included in the facia panel rates for the project. NS2 1400.00 MT 115310.66 161434924.00 AT Par 161434924.00 ♥♥ of 44 Run Date/Time: 12/09/2024 18:01:20 DYCE-C-I-AGC-ENGINEERING/NORTH CENTRAL RLY TENDER DOCUMENT Tender No: CEN00AGC1624 Closing Date/Time: 08/10/2024 15:00 ---------------------------------------------------------------------- 2 More Details Click Here To Open
Tender No: CEN00AGC1624 Dept/Rly: DYCE-C-I-AGC-ENGINEERING/NORTH CENTRAL RLY Closing Date/Time: 08/10/2024 15:00 Tender Title: Construction of two lane ROB in lieu of LC no 469 by providing 1x54.00 m Bow string Girder at km-1300/10-12 between Mania-Dholpur station of AGC-DHO section, two lane ROB in lieu of LC 3AB betweenTDL- JAB in Agra Tundla Section by providing 42 m Bowstring and 18 m Composite Girder, Construction of ROB at LC no 18 at Km 25/4-5 on IDH-BKI section ( IN ACHHNERA YARD). Tender Type: Open
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description 1 GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf GCC 2022 2 GCCACS1toACS6.pdf GCC ACS1 to ACS6 3 CONTACT_PROFORMA.pdf CONTACT PROFORMA 4 Annexure-1.pdf Annexure 1 5 Annexure-2.pdf Annexure 2 6 AnnexureV.pdf Annexure V 7 AnnexureVA.pdf Annexure VA 8 AnnexureVI.pdf Annexure VI 9 AnnexureVIA.pdf Annexure VIA 10 AnnexureVIB.pdf Annexure VIB 11 JPOtoincludeinTD.pdf Instructions for incorporating JPO 12 MakeinIndiacirculars.pdf Make in India circular 13 Contractore-MB31-15-2023.pdf Contractor eMB 14 RBLettere-RA28-03-2018.pdf Reverse Auction letter 15 Tenderdocument.pdf Tender document 16 ROB3ABGAD_.pdf ROB 3AB GAD 17 ROB18ACHNERAGAD.pdf ROB 18 GAD 18 ROB469DHOGAD.pdf ROB 469 GAD 19 Tenderdocument_1.pdf Tender document
Corrigenda Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued.
S.No Name Date/Time Action No Corrigendum Issued