Tender Details
Deptt./Rly. Unit BANGALORE DIVISION-ENGG/SOUTH WESTERN RLY
Tender No. 23SBC24OF27-09-24Item-11
Tender Title Sr.DEN/W/SBC Section: SW-I: ADEN/MYA Sub division: Reconstruction of type-II quarters in lieu of Quarters No. 24/A and B, 25/A and B (4 units) at Channapatna (CPT). SW-II: KSR Bengaluru: Upgradation of general infrastructure at Divisional Store Depot (DSD)/SBC- Proposed improvements to roofing, construction of strong rooms at Divisional Store Depot (DSD)/SBC. SW-III: KSR Bengaluru - Mysore section: Proposed constructions of track men rest room/tool room. - 7nos. in ADEN/MYA section - (Balance work). SW-IV: Improvements to Road-5 loading and unloading area at Settihalli (SET) from km 62/300-900 and construction of merchant room at Settihalli yard. Maintenance period is 12months.
Contract Type Works
Tender Type Open
Advertised Value36738899.63
Bidding Style Single Rate for Each Schedule Item
Bidding System Single Packet System
Pre-Bid Required No
Pre-Bid Query Date Time Not Applicable
Tendering Section GENERAL
Bidding Unit
Publishing Date / Time 27/09/2024 18:03
Period Of Completion 12 Months
Bidding Start Date 07/10/2024
Closing Date Time21/10/2024 15:00
Validity of Offer ( Days)60
Are Joint Venture (JV) firms allowed to bid-
Tender Doc. Cost (Rs.)0.00
Earnest Money (Rs.)333700.00
DescriptionSW-I SCH A - Reconstruction of type-II quarters in lieu of Quarters No. 24/A and B, 25/A and B (4 units) at Channapatna. 2 Please see Item Breakup for details. 3482415.58 (-) 21.00 2751108.31 Above/ Below/Par
More DetailsClick Here To Open
Tender No:  23SBC24OF27-09-24Item-11 Dept/Rly:  BANGALORE DIVISION-ENGG/SOUTH WESTERN RLY Closing Date/Time:   21/10/2024 15:00
 
Tender Title: Sr.DEN/W/SBC Section: SW-I: ADEN/MYA Sub division: Reconstruction of type-II quarters in lieu of Quarters No. 24/A and B, 25/A and B (4 units) at Channapatna (CPT). SW-II: KSR Bengaluru: Upgradation of general infrastructure at Divisional Store Depot (DSD)/SBC- Proposed improvements to roofing, construction of strong rooms at Divisional Store Depot (DSD)/SBC. SW-III: KSR Bengaluru - Mysore section: Proposed constructions of track men rest room/tool room. - 7nos. in ADEN/MYA section - (Balance work). SW-IV: Improvements to Road-5 loading and unloading area at Settihalli (SET) from km 62/300-900 and construction of merchant room at Settihalli yard. Maintenance period is 12months. Tender Type: Open
 
Tender Status Published
List of documents attached with the tender
S.No File Name Document Description
1 GCCACS.pdf Advance Correction Slip No.1
2 ACS7.pdf ACS - 7
3 JPOCablecuts.pdf JPO CONDITIONS
4 NEFTForm.pdf NEFT Form
5 IRGCCApril2022.pdf IRGCC April 2022
6 ACS-6.pdf Advanced correction slip - 6 to GCC 2022
7 ACS-5toGCC2022.pdf Advanced correction slip - 5 to GCC 2022
8 Instructionstobidders.pdf Instructions to bidder
9 StdTenderDocument-Version6.0-New.pdf Standard Tender Document - Version 6.0 New
10 GCC2022ACS-3_20230426_1141401.pdf Advanced correction slip - 3
11 ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.20221.pdf Advance Correction Slip No.2
Corrigenda
Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued. 
S.No Name Date/Time Action
No Corrigendum Issued